Sr. Manager, Process Engineering
CurrentResponsible for:-Specify, plan and verify manufacturing line installation at external partners-Liaise with our internal and external design and production teams for effective DFA (Design for Assembly)-Liaise with Electronic, Firmware and external Test Engineering for optimum testability, serviceability and cost-Coordinate Assembly and Test Equipment.