Sr. P & C Technician
• Wrote and submitted isolation, functional, and current injection plans, to be approved by First Energy Utility Company’s commissioning engineer.• Executed approved isolation plan, providing guidance to construction crews, by ensuring proper energy isolation on the relay once the circuit line had been switched out, preventing trips on the existing energized circuit.• Coordinated the apparatus crews for acceptance testing on newly installed switchgears.• Reviewed and corrected prints for correct operations of new relay panels. • Performed functional testing for correct operations and to ensure proper communication SCADA operations. • Uploaded settings to the Schweitzer relays and performed on-site acceptance testing. Uploaded the Satec metering settings and performed current and potential injection acceptance testing.• Entered the cascades for all new equipment into ProjectWise to be entered in their system.• Coordinated with SCADA to upload settings into the Schweitzer Ratec relay and assisted with acceptance functional testing to the First Energy control center.• Scheduled the in-service date and close-out date. Once the circuit line was in-service and verified with the commissioning engineer for correct phase angle readings.• Manage projects onsite throughout the duration and effectively interface and own the relationship with customers and their vendors