Phil Angus

Phil Angus Email and Phone Number

Experienced Construction Contract Administrator and Principal Project Manager
Phil Angus's Location
Australia, Australia
Phil Angus's Contact Details
About Phil Angus

Construction Contract Administrator and Principal Project Manager with over 33 years of experience in project and construction management on large scale infrastructure projects in Hong Kong, Australia, Singapore and the UK. Chartered civil engineer, registered professional engineer, NEC3 and NEC3 accreditated project manager and project management professional (PMP) with extensive knowledge and experience in project management, contract administration and construction supervision, quality & risk management, safety, construction claims management and dispute resolution. Experience in a diversified portfolio of infrastructure projects including highways and traffic engineering, bridges and viaducts, water and wastewater treatment, pipelines, earthworks, and land development.Key Words: project management, contract administration, construction supervision, NEC, PMP, quality management, risk management, safety, construction claims assessment, dispute resolution, procurement, diversified portfolio, major infrastructure projects, highways, traffic engineering, bridges, viaducts, water, wastewater treatment, pipelines, earthworks, land development, site development, utilities, programming, scheduling, primavera, financial management, arbitration, mediation, mentoring, PMP, RPEQ, CPEng.

Phil Angus's Current Company Details

Experienced Construction Contract Administrator and Principal Project Manager
Phil Angus Work Experience Details
  • Stantec
    Principal Project Manager
    Stantec Jul 2022 - Feb 2023
    Brisbane, Queensland, Australia
    Project: Haughton Pump Station 2Responsible for the project management and administration of the project for the design stage; concept design, issue for tender (IFT) and issue for construction (IFC) phases.The Haughton Pipeline Project will enable Townsville to replenish the reservoir at Ross River Dam with water drawn from the Burdekin River and pumped via a new pump station and 65.5km pipeline. The overall project objective is to deliver a performance proven water transport system capable of sustainably, reliably, and economically transferring 364 megalitres per day (ML/d) from the Burdekin River to the Ross River Dam. Stantec are responsible for the design of the Burdekin Pump Station (and associated deliverables), comprising of the following components:• River Intake: to draw water from the Burdekin River and convey it to a low-lift pump station wet well.• Low-lift pump station: to lift the water from the river intake to ground level sedimentation tanks.• High-lift pump station: to deliver water from the sedimentation tanks to the Haughton pipeline (also referred to as the mainline).
  • Aecom
    Senior Resident Engineer (Contract)
    Aecom Jan 2020 - Jan 2022
    Hong Kong
    Senior Resident Engineer (Contract) on HK Highways Department Contract No. HY/2017/10 "Tuen Mun - Chek Lap Kok Link - Northern Connection Tunnel Buildings, Electrical and Mechanical Works". Key duties of the post are to assess and prepare claim assessment reports to the Employer, assessment of claims for extensions of time, review of Contract conditions and procedures, review / resolution of disputes, review of construction programmes, disruption and cost related claims, etc. Tuen Mun – Chek Lap Kok Link (TM-CLKL) will provide a strategic link connecting the Northwest New Territories (NWNT) with the Hong Kong – Zhuhai – Macao Bridge Hong Kong Port (Hong Kong Port), North Lantau and the Hong Kong International Airport (HKIA). The TM-CLKL comprises a 9 km long dual 2-lane carriageway between Tuen Mun South and North Lantau, and is divided into two major sections: Southern Connection and Northern Connection.Contract No. HY/2017/10 - Tuen Mun - Chek Lap Kok Link - Northern Connection Tunnel Buildings, Electrical and Mechanical Works:a. Construction of tunnel buildings including the Administration Building, Toll Control Building, Maintenance Depot and Training Ground, Satellite Control Building and ancillary buildings and facilities.b. Reprovision of two Government facilities; c. Electrical and Mechanical works including tunnel ventilation system, tunnel and road lighting system, central monitoring and control system, electrical system, building services system and toll collection system etc.; and d. Associated tunnel cladding, waterworks, drainage, sewage and landscaping works etc.
  • Aecom
    Senior Resident Engineer (Contract)
    Aecom Jun 2017 - Dec 2019
    Hong Kong
    Senior Resident Engineer (Contract) on HK Highways Department Contract No. HY/2011/08 "Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings and Works Associated with Tunnel Commissioning". Key duties of the post are to assess and prepare claim assessment reports to the Employer, assessment of claims for extensions of time, review of Contract conditions and procedures, review / resolution of disputes, review of construction programmes, disruption and cost related claims, etc. The Central - Wan Chai Bypass and Island Eastern Corridor Link (CWB) is a strategic road along the north shore of Hong Kong Island targeted to alleviate the traffic congestion along the existing Gloucester Road - Harcourt Road - Connaught Road Central corridor. Contract No. HY/2011/08 - Tunnel Buildings, Systems and Fittings, and works associated with Tunnel CommissioningThe works in this package mainly include:◾Construction of Tunnel Buildings, i.e. West Ventilation Building (WVB), Middle Ventilation Building (MVB), East Ventilation Building (EVB), East Vent Shaft (EVS) and Administration Building (ADB), including structure and building services;◾Installation of route-wide tunnel E&M works (including fire services installations);◾Installation of route-wide TCSS works;◾Construction of tunnel cladding works;◾Testing and commissioning.
  • Seqwater
    Senior Project Manager
    Seqwater Oct 2015 - May 2017
    Southern Region, Hinze Dam Office (Gold Coast, Qld, Australia)
    Senior Project Manager for Seqwater (Southern Region) managing a program of multi-disciplinary projects across the entire project delivery life-cycle associated with dams, water treatment plants, roads, pump stations, valves & pipelines within the Gold Coast and Scenic Rim zones. The role involved the development of contract documentation (incl. detailed technical scope of works document and contract pricing schedules), management of the procurement and tender evaluation phase, management of contract and project delivery as the Superintendent's Representative (incl. management of claims & payments and certification of the works), management of testing & commissioning phase followed by handover of completed works to Seqwater Operations, and contract & project close-out within the Seqwater system.Projects were based at Hinze Dam, Little Nerang Dam, Boonah Kalbar WTP, Rathdowney WTP, Maroon Dam WTP and the Wellers Hill Reservoir.Seqwater ensures a safe, secure, resilient and reliable water supply for South East Queensland, as well as providing essential flood mitigation services and managing catchment health. Seqwater also provides irrigation services to about 1,200 rural customers and provide recreation facilities to the community.
  • Mwh Australia Pty Ltd
    Senior Project Manager
    Mwh Australia Pty Ltd Jul 2012 - Apr 2015
    Brisbane, Australia
    Senior Project Manager for large scale infrastructure projects at the design, procurement and construction phases associated with the Energy and Mining sector in Queensland and Western Australia. Notable projects:Spring Gully Pond C (Qld):Project Manager for the close out of the detailed design phase, plus procurement and construction phases. The project comprised of a 4-cell pond system for storage of brine (4 x 400ML lined ponds), 3.6km twin small dia. pipelines and associated pump station. Talinga Pond C (Qld):Brisbane based Project Manager for the detailed design phase and construction phases. The project comprised of a single cell pond system for storage of brine (450ML lined pond), 1.8km interpond transfer pipelines and associated pump station. An integrated approach to the design of three areas (storage pond system, pump station and transfer pipe system) was required to develop a robust new system containing high level of safety and functionality.
  • Mwh Singapore Pte
    Project Manager
    Mwh Singapore Pte Nov 2011 - Jun 2012
    Singapore
    Singapore based Project Manager for the detailed design and construction support phases of the Doha North Wastewater Treatment Plant (DN-WWTP) project; the largest project undertaken in the MWH Singapore office. When commissioned in 2013, the DN-WWTP was rated as the largest WWTP in Qatar; a US$1Billion DBO scheme. With an average design capacity of 245 Ml/day (for a future population of 1.125million), the DN-WWTP works include inlet-works, BNR treatment plant, tertiary treatment using ultrfiltration, chlorination, aerobic digestion, thermal drying sludge treatment and storage facilities, odour control, ancillary pumping stations, pipework, roads and landscaping.
  • Smec Australia Pty Ltd
    Superintendent'S Representative
    Smec Australia Pty Ltd Nov 2010 - Jul 2011
    Gold Coast, Queensland (Australia)
    Superintendent's Representative for the Gold Coast Rapid Transit Early Enabling Works (Roadworks South). The project delivered major roadwork modifications including earthworks, drainage, paving, property resumption and modification works, relocation of major services, retaining walls, lighting, traffic signals and landscaping on the Gold Coast Highway between Surfers Paradise Boulevard and Broadbeach. The Early Enabling Works were undertaken as a separate work contract package prior to the DBO for construction of the Gold Coast Light Rail system (Phase 1).
  • Ove Arup & Partners Hk Ltd
    Senior Resident Engineer (Contract)
    Ove Arup & Partners Hk Ltd Feb 2010 - Oct 2010
    Hong Kong
    Senior Resident Engineer (Contract); administration of contract claims and preparation for arbitration. Key duties of the post were to assess and prepare claim assessment reports to the Employer, review of Contract conditions and procedures, review / resolution of disputes, review of construction programmes, disruption and cost related claims, etc. The Stonecutters Bridge is a 1.6km long dual 3-lane cable stayed road bridge with a 1,018m main span. The Bridge towers rise 298m above the pile caps with the main deck 73.5m (min’m) above the Rambler Channel.
  • Aecom (Hong Kong)
    Principal Engineer
    Aecom (Hong Kong) May 2009 - Nov 2009
    Hong Kong
    Assistant to the Director of the AECOM (HK) Project & Construction Management Group with the project management of numerous major construction projects in Hong Kong (Ocean Park Contract CI07, Trunk Road T3) and development of the Project Management & Construction Management business in Asia. Responsible for the development of Project Control systems for construction projects and to assist in the areas of contract claim and construction dispute management.
  • Mwh Australia Pty Ltd
    Deputy Program Manager / Program Services Manager
    Mwh Australia Pty Ltd Oct 2006 - May 2009
    Gold Coast, Queensland, Australia
    Responsible for the overall administration of the Program and general program management, quality & risk management, human resources management and safety (WH&S) aspects of the Program. Responsible for providing direction for the Alliance in respect of the formulation and maintenance of the structure of the project/program controls plan. The PCWF Alliance was created to deliver an innovative wastewater and recycled water project for the northern areas of the Gold Coast. The Program comprised 4 major components namely Infrastructure Delivery, Asset Management, Water Business, and an intensive Community and Stakeholder Engagement component.
  • Maunsell Aecom (Hong Kong)
    Resident Engineer (Contracts) - Trunk Road 3
    Maunsell Aecom (Hong Kong) Sep 2004 - Sep 2006
    Hong Kong
    Resident Engineer (Contracts) responsible for the contract claims administration and management of the construction programme for the project. Key duties of the post were to assess and prepare claim assessment reports to the Employer, review of Contract conditions and procedures, preparation of progress reports, review / resolution of disputes, assessment of delay recovery measures, review of construction programmes, monitoring of the progress of the Works, quarterly assessment of the Contractor’s performance, etc.The project comprised the construction of approx’ 2 km long dual two-lane Trunk Road T3 with associated slope works, on/off ramps, fully enclosed noise barriers, et al. The Sha Tin Heights Tunnel, which forms part of Route 8 and is the fourth external road tunnel link from Sha Tin, together with the Road T3 in Sha Tin provides the essential link between Route 8 and the high-speed road networks in the northeast New Territories. The road works which completed in early 2008 help relieve the traffic pressure on Lion Rock Tunnel, Shing Mun Tunnels, Tate’s Cairn Tunnel and Tai Po Road.
  • Maunsell Consultants Asia Ltd (Hk)
    Engineer'S Representative / Resident Engineer
    Maunsell Consultants Asia Ltd (Hk) Dec 2001 - Aug 2004
    Hong Kong
    Engineer’s Representative (& Resident Engineer) for over 2½ years for the administration and supervision of the construction of bored pile retaining walls (1m, 2m & 3m dia.), major storm drain and stream course works, watermain diversion works (600mm dia & 1000mm dia), natural terrain hazard mitigation works, site clearance and earthworks, preservation of existing trees (incl. an historic 100yr old Banyan Tree), landscaping works, etc, to form the site for a future housing development.
  • Mwh Hk Ltd
    Resident Engineer (Civil/Contracts)
    Mwh Hk Ltd Jan 1998 - Dec 2001
    Hong Kong
    Resident Engineer (Civil/Contracts) on the Strategic Sewage Disposal Scheme (SSDS) Stage 1.Administration and supervision of the civil engineering component of upgrading 6 Preliminary Treatment Works (PTW’s) under the SSDS Stage I. The Contract involved the upgrading of coarse screen and fine screen facilities, wash compactors, detritors, grit removal and outlet flow facilities, and the construction of the channels that lead into vortex drop shafts connecting to the SSDS Stage I tunnel system (3Nos. of tunnel contracts). The civil works also included the construction of admin’, E&M buildings and workshops with architectural finishes such as helical staircases, louvres, sub-floor cable conduits, fire service and air-conditioning systems, etc.Administration and supervision of major remedial works to the SSDS Main Pumping Station (SCIMPS) at Stonecutters Island STW, water testing of the wet well areas, completion of the Works, and interface with E&M and tunnel contracts. The main pumping station (SCIMPS) consists of a circular/ring wet well (with a common inlet chamber of 50m depth) and a dry well located central to the wet well where 8 No. pumps connect to the twin wet well circular sumps. Administration and supervision of construction works to the SSDS Stage I Outfall comprising the completion of outstanding marine works and the rectification of the sub-sea rock armour defence barrier surrounding the diffuser pipeline (approx’ 1,200m length), rectification of defects to the outfall diffusers (24 Nos.) and diffuser pipeline, seawall (rock armour) rectification works on Stonecutters Island. Also appointed as the Resident Engineer responsible for the commissioning phases of the Stage 1 Outfall in late 2001. Administration and assessment of contract claims associated with 4 Nos. of contracts (Civil and E&M) which made up approximately HK$2 billion of the value of the SSDS Stage I Project.Note: SSDS was renamed HATS in 2002; Harbour Area Treatment Scheme.
  • Mwh Hk Ltd
    Project Manager / Transportation Engineer
    Mwh Hk Ltd Oct 1996 - Jan 1998
    Hong Kong
    North West Kowloon Sewerage Stage 2 and Stage 2 (Phase 1):Responsible for the project management and contract administration for the Contract which included the construction of over 12,000 metres of Foul Sewers and Storm Drains in the busy Kowloon urban districts. Also project managed traffic and highway studies, traffic management plans, approvals of temporary traffic arrangements for urban trench works, and cost/benefit studies in Hong Kong and Ningbo, China.
  • Skm Australia Pty Ltd; Now Known As Jacobs
    Senior Traffic Engineer
    Skm Australia Pty Ltd; Now Known As Jacobs Oct 1994 - Oct 1996
    Sydney
    Project Manager and Engineer for road safety audit studies, accident studies, traffic impact studies, car parking reviews, development of worksite traffic management plans, developer of worksite traffic management plans and co-presenter of road safety audit training sessions for state government and municipal highways engineers.
  • Roads & Traffic Authority Nsw, Australia; Now Known As Roads And Maritime Services (Nsw).
    Traffic/Transportation Engineer
    Roads & Traffic Authority Nsw, Australia; Now Known As Roads And Maritime Services (Nsw). Sep 1990 - Oct 1994
    Traffic Section & Road Safety Bureau (Sydney)
    Member of the RTA(NSW) team for the development of the State road safety audit guidelines, road safety audit studies and accident studies, participation on working committees for development of worksite traffic management guidelines and roadside barriers. Study of promotional aspects for High Occupancy Vehicle Systems in Sydney and Study of HOV Lanes (Transit Lanes) in Sydney (co-author; ARRB Conference paper).
  • Balfour Beatty Plc
    Site Engineer
    Balfour Beatty Plc Feb 1990 - Jun 1990
    Croydon, United Kingdom
    Site Engineer for the upgrading of the A23 Purley Way at Croydon, Surrey. Project comprised of new bridge works, upgrading of old bridge and stormwater drainage system, road-works, interchanges and traffic signal systems.

Phil Angus Skills

Contract Management Project Management Traffic Management Dispute Resolution Civil Engineering Highways Water Road Design Management Construction Management Bridge Commercial Management Construction Earthworks Engineering Project Control Infrastructure Procurement Tunnels Project Planning Drainage Feasibility Studies Primavera P6 Management Project Engineering Water Resource Management

Phil Angus Education Details

Frequently Asked Questions about Phil Angus

What is Phil Angus's role at the current company?

Phil Angus's current role is Experienced Construction Contract Administrator and Principal Project Manager.

What is Phil Angus's email address?

Phil Angus's email address is ph****@****ail.com

What schools did Phil Angus attend?

Phil Angus attended Unsw, Rmit University, Balwyn High School.

What skills is Phil Angus known for?

Phil Angus has skills like Contract Management, Project Management, Traffic Management, Dispute Resolution, Civil Engineering, Highways, Water, Road, Design Management, Construction Management, Bridge, Commercial Management.

Not the Phil Angus you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.