Philip Barry

Philip Barry Email and Phone Number

Scheduling Manager - Tutor Perini Civil East @ Tutor Perini Corporation
Philip Barry's Location
New York, New York, United States, United States
Philip Barry's Contact Details
About Philip Barry

With 40 years of design and construction project scheduling and management experience, responsibilities have included developing and managing scope, budgets, schedules, and project controls for major transportation projects. Duties included progress monitoring and reporting, invoicing, staffing and sub-consultant management. Experience includes over 30 years using Primavera Project Planner for integrated CPM scheduling, cost control, resource management, and progress monitoring and reporting. Design responsibilities have included preparation of conceptual designs, design analyses and contract documents, and construction support services for major transportation projects. Led the scheduling effort for major multi-discipline design and construction projects, including design-build, working with owners and their representatives to establish and implement guidelines and procedures.

Philip Barry's Current Company Details
Tutor Perini Corporation

Tutor Perini Corporation

View
Scheduling Manager - Tutor Perini Civil East
Philip Barry Work Experience Details
  • Tutor Perini Corporation
    Scheduling Manager - Tutor Perini Civil East
    Tutor Perini Corporation Oct 2023 - Present
    Sylmar, California, Us
  • David Evans And Associates, Inc.
    Fta Oversight
    David Evans And Associates, Inc. Dec 2020 - Oct 2023
    Portland, Oregon, Us
    Federal Transit Administration, Region 2Providing program management oversight for the Federal Transit Administration on the following major transportation infrastructure projects –Hudson Tunnel Project - $16.1B project, part of the Gateway program. (Task Lead)MTA/Long Island Rail Road East Side Access - $11B, 20-year project to bring Long Island Rail Road service to Grand Central Terminal. (Task Lead)New Jersey Transit Portal North Bridge Replacement Project - $1.9B project to replace the aging rail bridge that is a choke-point in the Northeast Corridor and predecessor to the Gateway Program.Maryland DOT Purple Line - $3.4BSFMTA Central Subway - $1.6B project to build a 1.7 mile extension of the T Third Line in San Francisco, CA.
  • Tutor Perini Corporation
    Scheduling Manager
    Tutor Perini Corporation Aug 2020 - Dec 2020
    Sylmar, California, Us
    Newark Airport Terminal One, New JerseyLead the reset of the baseline schedule to establish interim milestone dates and a final completion date for this $2.7B, one million square foot, 33 gate new airport terminal.
  • The Port Authority Of New York & New Jersey
    Assistant Chief Scheduler
    The Port Authority Of New York & New Jersey Aug 2019 - Aug 2020
    Us
    Responsible for managing the scheduling group (3 schedulers) for the Engineering Department and providing guidance to the seven on-site schedulers of the Construction Management Division (CMD). Provided scheduling support for two design-build substation project procurements at JFK Airport. Worked closely with the JFK Airport Redevelopment group and Terminal One developer team to establish guidelines and scheduling best practices and perform schedule reviews. Provided scheduling guidance on several federally funded PATH projects with scheduling compliance issues.
  • The Walsh Group - Walsh Construction & Archer Western
    Senior Scheduler
    The Walsh Group - Walsh Construction & Archer Western Jan 2019 - Aug 2019
    Chicago, Il, Us
    MTA/New York City Transit 207th Street Yard, New YorkDeveloped the baseline schedule for this $380M contract. The project consists of signal system modernization, construction of new facilities including Relay Rooms, Train Control and Communications Based Train Control (CBTC) rooms and restoration of track infrastructure. In addition, the work also includes furnishing and installing flood mitigation and resiliency structures and measures, such as steel and concrete walls, flood gates, fabric portal flood gate, drainage improvement, replacement of track feeder, transposition cables and appurtenances.
  • Tutor Perini Building Corp
    Scheduling Manager - Tutor Perini Civil Northeast
    Tutor Perini Building Corp Jan 2018 - Dec 2018
    Henderson, Nevada, Us
  • Moca Systems
    Senior Scheduler - Delta Airlines Laguardia Airport Redevelopment Program
    Moca Systems Dec 2015 - Nov 2017
    Boston, Ma, Us
    2015-Present Lead Scheduler, MOCA SystemsDelta Airlines LaGuardia Airport New Terminal C Project, New York Led the development of the project baseline schedule for the New Terminal C Project as a subconsultant to Delta Air Lines. The new $4B terminal includes 4 concourses, headhouse, substation, aircraft parking ramps and 4 elevated departure roadways. Coordinated with the Port Authority to establish a WBS and schedule guidelines for the project schedule to assist in producing an IMS (Integrated Master Schedule). The IMS is used to identify interface milestones with the adjacent $4B Terminal B redevelopment project being constructed by LaGuardia Gateway Partners (Skanska-Walsh, JV is the contractor). Prepared a cost-loaded 900 activity summary level schedule for analysis of cash flow.
  • Tutor Perini Civil Northeast
    Scheduling Manager
    Tutor Perini Civil Northeast Oct 2011 - Dec 2015
    Henderson, Nevada, Us
    2011-2015 Scheduling Manager, Tutor Perini Civil Group - Northeast Prepared bid schedules working with lead estimators and joint venture partners on major project bid proposals including Kosckiuszko Bridge; LaGuardia Central Terminal (Terminal B) Redevelopment; Metro North Harmon Shop; and MTA East Side Access contracts CM014B – Grand Central Terminal Concourse, CM007 – Station Caverns and CH057 – Harold Structures Part 3.MTA/Long Island Rail Road East Side Access, MTA Capital Construction, New York Led the scheduling effort on successful proposals for four new East Side Access contracts totalling $1.6B. The proposal schedules identified critical program interfaces and strategies for meeting program completion milestones and reducing schedule risk. Systems Facilities Package 1 (CS179), Manhattan North Structures (CM006), Plaza Substation and Queens Structures (CQ032) Scheduling Manager responsible for managing the project schedules for three contracts with a budget of over $1B as part of the $10B East Side Access project. The CS179 contract is critical to completing the East Side Access project and starting revenue train service to Grand Central Terminal from Long Island. The three project schedules were linked to produce an integrated project schedule for executive level reporting and progress monitoring. Harold Structures Part 1 (CH053) Project Scheduler for this $295 million project to expand and reconfigure Sunnyside Yard in preparation for future passenger rail tunnels as part of the $10 billion East Side Access project to connect the Long Island Rail Road to Grand Central Terminal. The project scope includes construction of a two lane vehicular bridge, widening of three existing railroad bridges, a 900 foot tunnel approach structure, 5,225 feet of retaining walls, a 4,500 square foot substation, 15,150 feet of new underground utilities, and installation of over 100 catenary and signal tower structures.
  • Parsons
    Design Certification Task Manager
    Parsons Dec 2010 - Oct 2011
    Chantilly, Virginia, Us
    2010-2011 Design Certification Task Manager, Parsons Transportation Group / Downtown Design PartnershipWorld Trade Center Transportation Hub, New York – Design Certification Manager for the construction of the Santiago Calatrava designed, $4 billion transportation hub for the Port Authority (PA). Responsible for managing a team of architects and engineers reviewing the construction of the Hub and tracking items of non-conformance. Assisted in resolving items of non-conformance so that the architect or engineer of record can certify to the PA that the construction conforms to the requirements of the contract documents. All non-conformance items were resolved enabling the 9/11 Memorial Plaza to be opened for the tenth anniversary.
  • Schiavone Construction
    Senior Scheduler
    Schiavone Construction Jun 2009 - Nov 2010
    Secaucus, Nj, Us
    2010 Project Scheduler, Schiavone Construction Co. / Schiavone-Kiewit, JVMTA/Long Island Rail Road East Side Access – Northern Boulevard Crossing, New York – Project Scheduler for Contract CQ039, the construction of a $85 million tunnel below Northern Boulevard of approximately 125 feet in length. The tunnel will connect the Harold Interlocking Mainline with the tunnels and structures leading to Grand Central Terminal. The tunnel was excavated through a series of sequenced excavations constructed below Northern Boulevard and the active IND and elevated BMT Subway lines. Prior to performing the excavation, a temporary underpinning system was installed to support the BMT structure.2009-2010 Project Scheduler, Schiavone Construction Co. / Schiavone-WDF, JVNewtown Creek Water Pollution Control Plant Upgrade, Greenpoint, NY – Project Scheduler for construction of NYCDEP’s 42,500 square feet Central Residuals Building. The CRB is a reinforced concrete and steel structure that will contain the sludge screening, skimming concentration, degritting raw wastewater flow meter, material handling conveyance and charcoal odor control systems. This facility will be connected to the larger plant complex with the installation of the underground piping ductbanks and utility work. Responsibilities include developing the baseline resource and cost loaded schedule and management of a CPM scheduling subconsultant.
  • Lendlease
    Senior Scheduler
    Lendlease Mar 2006 - May 2009
    Barangaroo, Nsw, Au
    2006-2009 Schedule Manager, Bovis Lend Lease / Phoenix Constructors, JVWorld Trade Center Transportation Hub, New York – Schedule Manager for the construction of the Santiago Calatrava designed, $4 billion transportation hub for the Port Authority (PA). The terminal connects a network of passageways linking commuter trains, ferry boats, 14 subway lines and potentially an AirTrain station (connecting JFK Airport to Lower Manhattan). Developed and maintained an integrated master project schedule for over 20 early construction work packages consisting of 10,000 activities, with a total cost of $700 million. The schedules were cost/resource-loaded to provide the basis for planning and determining the earned value of work in place, which was used as the basis for monthly progress payments. Prepared procedures and guidelines for managing the master project schedule and transitioning to P6. Responsible for coordinating schedules with package managers, resident engineers, and PA consultants to ensure they comply with standards and provide an accurate representation of the status of construction. Supervised four schedulers.
  • Parsons
    Senior Civil Engineer
    Parsons Mar 2000 - Mar 2006
    Chantilly, Virginia, Us
    2004-2006 Senior Civil/Schedule Engineer, Parsons Transportation Group / Downtown Design PartnershipWorld Trade Center Transportation Hub, New York – Lead Civil Engineer for design of the Permanent PATH Terminal of the Santiago Calatrava designed, $3 billion transportation hub. 2000-2004 Senior Civil/Schedule Engineer, Parsons Transportation GroupMTA/Long Island Rail Road East Side Access, New York – Lead Civil Engineer for the design of a new LIRR terminal on the existing lower level of Grand Central Terminal (GCT) as part of the $7 billion East Side Access project to connect LIRR with GCT. Responsible for demolition; design of utility relocations; construction staging; and Maintenance and Protection of Traffic schemes related to the construction of the street level entrances that will provide direct access to the new LIRR concourse.
  • Tams Consultants
    Senior Civil/Schedule Engineer
    Tams Consultants Oct 1998 - Mar 2000
    1998-2000 Senior Civil/Schedule Engineer, TAMS Consultants, Inc.Continental Airlines - Newark Airport Global Gateway, New Jersey – Senior Civil Engineer/Airside Project Manager for airside planning, construction phasing and final civil design in support of a new 325,000 sf concourse designed to accommodate 12 widebody or 19 narrowbody aircraft gates on a constricted site directly adjacent to an existing concourse and formerly used to hardstand commuter aircraft. In addition, over 400,000 sf of new related facilities were to be constructed including a 135 ft high operations control tower, baggage handling and FIS facilities and landside roadways. The project was constructed on a fast track schedule at a cost of $532 million as part of the Port Authority’s $1.6 billion Global Gateway program. Extensive coordination with the Port Authority, airline operations and construction manager was required to minimize the impact on airport operations. Responsibilities included aircraft parking ramp and jetbridge planning and design, ramp and taxilane pavement design, storm drainage and hydrant fueling system design, and utilities coordination.
  • Parsons
    Senior Civil Engineer
    Parsons Feb 1997 - Oct 1998
    Chantilly, Virginia, Us
    1997-1998 Senior Civil/Schedule Engineer, Parsons Transportation Group Rail Rapid Transit Access to LaGuardia Airport, New York - Civil Engineer for the initial engineering analysis for the four alternative alignments. The horizontal and vertical geometry for each alignment was developed to prepare an assessment of the types of construction to be utilized within the alignment corridors. The assessment included an evaluation of both elevated and underground options. (1998)Newark Airport Station Connection to the Northeast Corridor, New Jersey - Project Controls Engineer responsible for scheduling and cost control for the Newark Airport Station Monorail Connection to the Northeast Corridor. The project consisted of over 15 separate construction contracts with a total budget of $120 million. The construction included a new station, communication and signals, and extensive track work. (1998)Reconstruction of Route 9A - Segment 3, New York - Civil Engineer for the final design of the $60 million reconstruction of the West Side Highway (Route 9A) from Harrison to Clarkson Streets on an accelerated schedule. Responsibilities included scheduling, progress reporting, invoicing, subconsultant management and client liaison. (1997-1998)
  • Tams Consultants
    Civil Engineer
    Tams Consultants Mar 1990 - Feb 1997
    Deputy Project Manager / Senior Civil and Project Controls Engineer - Reconstruction of Route 9A - Segment 7, NYSDOT, New York, NYSenior Civil Engineer FDR Drive-Avenue C Viaduct Reconstruction, NYSDOT, New York, NYConstruction Cost and Scheduling Engineer - 9 de Julio Expressway, Citibank, Buenos Aires, ArgentinaConstruction Cost and Scheduling Engineer - North Access to the City of Buenos Aires, Citibank, Buenos Aires, ArgentinaDesign Engineer - International Arrivals Building (Terminal 4) Redevelopment, LCOR, JFK International Airport, NYDesign Engineer - Delta Air Lines Terminal Expansion, Delta Air Lines, JFK International Airport, NYDesign and Scheduling Engineer - Macau International Airport, Bank of China, MacauDeputy Project Manager - Whitehall Ferry Terminal, NYCEDC, New York, NYDeputy Project Manager - Hoboken Terminal Core Passenger Facilities, NJ Transit, Hoboken, NJAssistant Project Manager - Long Island Rail Road Penn Station Improvement Project, MTA Long Island Rail Road, New York, NY
  • New York City Housing Authority
    Civil Engineer
    New York City Housing Authority Dec 1987 - Mar 1990
    1987-1990 Civil Engineer / Staff Analyst, New York City Housing AuthoritySupervisor, Contract Tracking Unit - Scheduled and tracked more than 1,200 design work orders and contracts with an estimated cost of $350 million. Duties included preparation of mayoral management reports, upgrading of computer systems and analysis of design and contracting procedures. (1988-1990)Assistant Modernization Administrator - Revised and updated an existing five-year plan for comprehensive modernization of 220 public housing developments at an estimated cost of $1.2 billion. The plan was used by HUD to determine funding levels for the following five years. Duties included site visits, coordination of scope, and cost estimating to reflect recently awarded construction contracts. (1987-1988)
  • United States Air Force
    Civil Engineering Officer
    United States Air Force Oct 1983 - Dec 1987
    1983-1987 Civil Engineering Officer, US Air Force, Pope AFB, NC Contract Programmer - Planned, programmed and prepared preliminary design documents for all contract projects. Projects included repair, maintenance and construction of base buildings, utility systems and airfield pavements. Conducted site visits, defined facility requirements, and prepared economic analyses of alternatives and cost estimates for preparation of funding documents. (1984-1987)Chief of Readiness and Logistics - Directed the management of the Base Engineering Emergency Force program which included training, equipping and deploying 150 military personnel and 300 civilian and military personnel tasked to recover and sustain the base during wartime. Prepared, reviewed, coordinated and implemented contingency plans. (1983-1984)

Philip Barry Education Details

  • Manhattan University
    Manhattan University
    Civil Engineering

Frequently Asked Questions about Philip Barry

What company does Philip Barry work for?

Philip Barry works for Tutor Perini Corporation

What is Philip Barry's role at the current company?

Philip Barry's current role is Scheduling Manager - Tutor Perini Civil East.

What is Philip Barry's email address?

Philip Barry's email address is ph****@****ail.com

What is Philip Barry's direct phone number?

Philip Barry's direct phone number is +164634*****

What schools did Philip Barry attend?

Philip Barry attended Manhattan University.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.