Pierre Cheval

Pierre Cheval Email and Phone Number

Resident Engineer/Team Leader
Pierre Cheval's Location
Cagnes-sur-Mer, Provence-Alpes-Côte d'Azur, France, France
Pierre Cheval's Contact Details

Pierre Cheval work email

Pierre Cheval personal email

n/a
About Pierre Cheval

Pierre has more than 30 years of general experience in the Civil Engineering for major rail or road infrastructure projects including more than 15 years’ experience in the supervision works, design review, materials and quality control.He has demonstrated his ability of managing and supervising civil structures for high-speed rails, metros and tramways projects with different types of contracts and in different cultural environments.He has a chartered Degree in Civil Engineering, started his career in construction companies, specialist in different form of railways projects constructions both in France and abroad with leading international companies such as Freyssinet and Vinci.Team Leader for a mixed Motorway/Railway cable stayed bridge in Bulgaria over Danube River. Team Leader for major Metros projects in Saudi Arabia and Vietnam which requires both experiences in railway, bridges work, building and civil constructions as well. Through his career he has acquired a thorough knowledge in Railway Projects Management including track rails, catenary, low voltage systems and Supervision, performed in conformity with FIDIC rules and familiar with the use of the Technical Requirements such as British Standards, AASHTO/ASTM, EUROCODES or Russian Standards.

Pierre Cheval's Current Company Details

Resident Engineer/Team Leader
Pierre Cheval Work Experience Details
  • Egis
    Resident Engineer, Team Leader
    Egis Jun 2021 - Jan 2023
    Yerevan, Arménie
    The project comprises the construction of approximately 6.6 km (main road) of new urban dual lane carriageway with central reserve and footways, either on a new 5 km alignment or by widening 1.5 km of existing urban carriageway. It also includes the following works:• Two half grade separated interchanges including overpasses and slip roads• Local access and service roads• Relocation of utilities• Street lighting• Landscaping at interchanges• Signage, markings and barriers• Noise barriersEnsure continuous presence at all construction sites, observe the progress and quality of the contractor’s work. Prepare and issue variation orders, check and review interim payment certificates, At the completion of the contract, prepare a consolidated project completion report.
  • Kocks Gmbh
    Consultant Senior
    Kocks Gmbh Jan 2021 - May 2021
    Yerevan, Arménie
    KOCKS, Armenian BranchSite review/visits of Tranche 2 to confirm the remaining worksto be undertakenBridges and Structures Design EngineerCarry out an appropriate analysis based on available evidentiary documents to determine the accuracy of documents handed over by the initial Engineer.Determine the accuracy of documents handed over by the initial Engineer to determine the accuracy of documents handed over by the initial Engineer.
  • Egis
    Senior Resident Engineer
    Egis Feb 2019 - Jul 2020
    Monaco
    ANSE DU PORTIER, Land extension Project: Six-hectare land development.After installation of 18 submerged concrete caissons, each weighing 10.000 tonnes poured and shipped from Marseille. The project will consist of 60,000 m² of housing, 3,000 m² of retail space, a 9,000-m² extension for the Grimaldi Forum and a port with 30 berths.In charge of the civil works supervision for the completion of the concrete embankment.
  • Systra
    Section Engineer Elevated Line And Stations
    Systra Jan 2016 - Jul 2018
    Al-Riyadh Governorate, Saudi Arabia
    RIYADH PILOT METRO, Package 1, Line 1: 38km long.As part of the construction of 6 lines concurrently (160km long). In charge of the supervision for the construction of the elevated section line (13 km) including 2 elevated stations and 1 interchange station (650 million dollars for this station) for a light metro project in accordance with the ASTM standards, FIDIC Red Book 2010. Working with Document Control Software ACONEX.The overseeing construction includes:• Management of a team of structure Engineers and Inspectors for the supervision of the design, construction, Method Statements, Material approval,• Reviewing schedule of works,• Reviewing all shop drawings and control of updating documents,• Revision Interim Payment Certificates and Variations orders,• Traffic management, Road rehabilitation, Utility Diversions, safety procedures,• Retaining walls for access on viaducts (Freyssinet MSE walls),• Mono shaft piles, piles cap construction,• Erection of 320 piers for elevated lines (typical piers, C piers, hammer head piers, straddle beam piers), Construction of 4 viaducts with balanced cantilever,• Lifting and assembling of 320 spans (pre stressing precast segments) with 3 gantry launching girders,• Construction of 4 viaducts with balanced cantilever+ 1 Cast in situ• Tracks works supervision.
  • Systra
    Section Engineer Elevated Line And Stations
    Systra Jan 2013 - Jul 2015
    Hanoi, Vietnam
    HANOI PILOT LIGHT METRO LINE 3. 12.5km long.In charge of the supervision for the construction of elevated sections lines (8,5km) and 8 elevated stations for a light metro project in accordance with the ASTM/AASHTO standards, FIDIC Red Book 2010.• Final preparation of the General and Technical Requirements of the contract documents. • Analyse and approval of the Contractor Quality Management System and Quality Control Plan, Method Statements for different operations, Traffic Management, Material Resources and dumping areas, in respect with the Vietnamese rules and regulations for environment,• Review, control and establishment of the testing and commissioning procedures,• Inspection and approval of the input material and concretes mix design.• Inspection of the complete equipment to be approved before using on site,• Reviewing the construction designs and the working drawings for approval,• Training for the period of execution of the contract for trainees assigned by the Contractual documents and FIDIC implementation,• Supervision of the construction of the temporary and permanent works in accordance with the approved and updated working drawings,• Organisation and training local Engineer’s supervision team, land surveyors and inspectors,• Reviewing of Inspector’s daily reports,• Regular visits to Project site to ensure quality of work, • Regular monitoring of the updated copies of project documents on site,• Leading the weekly working meeting with the client and the Contractor, minutes of meeting,• Commercial services with the client,• Review the monthly progress reports from the contractor, preparation and submission monthly progress report to the client,• Revision and correction of the Contractor Statements for the Interim Payment Certificates.
  • Alstom Transport
    Construction Manager
    Alstom Transport Jun 2012 - Nov 2012
    Dubai
    AL SUFOUH TRAMWAY SYSTEM 10 Km long.Short term mission. In charge to find a technical solution to be approved by the consultant so as to cast the elevated rail path for the tramway with CIRIA Civil requirements.
  • Afpa
    Professional Training
    Afpa Mar 2011 - Mar 2012
    Région De Toulouse, France
    EDUCATIONAL COURSES FOR GRADUATION.• Studying for Bachelor Degree in Civil Engineering. Degree awarded on March 2012.
  • Rendel Limited
    Viaduct Resident Engineer
    Rendel Limited Apr 2008 - Oct 2010
    Vidin, Bulgaria
    DANUBE BRIDGE VIDIN CALAFAT 1800m long.Prestress Engineer on the supervising Engineer’s team supervision on the Danube bridge (Vidin-Calafat) project. Construction of the extra dossed bridge (1800m length) with precast segmental balanced cantilever techniques and approach embankments which carry a dual carriageway and a high speed rail over the river Danube in accordance with the British Standard requirements (MCHW) and FIDIC Red Book, Yellow Book.• Supervision of the construction of the permanent works in accordance with the approved working drawings• Observe and ensure safe working practices followed and in compliance with contractual requirements for permanent and temporary works• Preparation of a daily and weekly report on the Contractor’s activities and site progress• Reviewing the Contractor’s working drawings and technical calculations relating to prestressing works and in compliance with the Definitive Design• Control materials and workmanship in accordance with the requirements of the contract• Organisation of the Engineer’s supervision team of surveyors and technicians in order they properly supervise the work on site• Recording events including the finished works, movements and settlements• Main Quality Controls of: + Erection from the Pile casing to the Pier head (sliding formwork) + Erection of the segments, provisional and definitive pre-stressing + Movement of the gantry launching truss + Setting up of the Bearing plates + Execution of the closure joints.
  • Ingerop
    Site Supervision
    Ingerop Feb 2005 - Mar 2008
    Nice , France
    LIGNE 1 DU TRAMWAY DE NICE 8.4km long. In charge of supervision of the civil works of Nice tramway project including:• Check of working drawings• Quality control of site activities i.e. relief of Hold Points, detection of Non Conformity, etc..• Follow up of the site programme• Measurement, contract management• Final approval of each activity.
  • Freyssinet
    Bridge And Road Rehabilitation Construction Manager
    Freyssinet Jun 2004 - Jan 2005
    KACANIK BRIDGE 280m long + Underpasses and hydraulic passages for National road, construction and rehabilitation.Donor funded project (EBRD) and (EIB).Construction of a new motorway viaduct and rehabilitation of several underpasses; In charge of:• Leading the local team of surveyors, technicians and workers for the various operations of construction and refurbishment,• Renovation of the old piles and construction of the new piles cast in place,• Construction of 280 meters new pre-stressed bridge.• Rehabilitation works for underpasses.
  • Vinci Construction
    Viaduct Construction Manager
    Vinci Construction Jun 2002 - Jun 2004
    Antibes, France
    And participation in construction and renovation of various motorways complex structures:• Finishing of facing of Caramy viaduct and Renewing the bridge's roadway pavement,• Construction of a standing luxury villa on the French Riviera,• Renovation of retaining walls against avalanches for mountain roads in the Alpes,• Construction of the foundation over micro-piles for a dolphin pool of Marineland, (waterpark on the French Riviera).
  • Léon Grosse
    Site Technician
    Léon Grosse Jun 2001 - May 2002
    Nice, France
    DOMAINE DES MIMOSAS.Quantity surveyor for housing estate operation.
  • Bouygues
    Site Inspection
    Bouygues Mar 2001 - Oct 2001
    Monaco
    PORT HERCULES MONACO.Fabrication and installation of precast underwater tunnel section of lot 31 in Monaco Port.
  • Cabinet Tichadou
    Property Maintenance Manager
    Cabinet Tichadou 1999 - 2001
    Nice, France
    MANAGING AGENT.In charge of maintenance and renovation of several buildings in condominium.
  • Freyssinet
    Viaduct Site Technician
    Freyssinet Jul 1996 - Sep 1998
    Vernegues, France
    VIADUC DE VERNEGUES (precast bridge) 1240 m long.Participation in construction of 3rd section of TGV (high speed train)South East• Managing the team in charge of various pre-stressing operations of Viaduct de Vernègues (département 13 in France). Total length 1240m• Anchorage of segments on piers• Pre-stressing of segmental bridge• Launching of the bridge with external and internal pre-stressing• Injection of the grout for the pre-stressing ducts• Installation of closure joint and bearing load• Installation of expensive joints.
  • Razel
    Highway Bridge Site Technician
    Razel Sep 1992 - Aug 1995
    Montauban, France
    AUTOROUTE MONTAUBAN CAHORS 20 km long.In charge of the construction of a viaduct, some underpasses and hydraulic passages for the Highway A20.

Pierre Cheval Skills

Tramway And Elevated Metro Stations Expertise In Prestressing Works Civil Engineering Reinforced Concrete Construction Management Works Contract Under Rules Similar To Fidic Contract Conditions Bridges And Viaducs Construction Project Management Microsoft Office Microsoft Word Microsoft Excel Construction Concrete Bridge Contract Management Rail Arpentage Gestion Des Contrats

Pierre Cheval Education Details

Frequently Asked Questions about Pierre Cheval

What is Pierre Cheval's role at the current company?

Pierre Cheval's current role is Resident Engineer/Team Leader.

What is Pierre Cheval's email address?

Pierre Cheval's email address is pc****@****tra.com

What schools did Pierre Cheval attend?

Pierre Cheval attended A.f.p.a, Université Paul Sabatier Toulouse Iii, French School Of Freyssinet, Afpa Montauban, Université Paul Sabatier Toulouse Iii.

What are some of Pierre Cheval's interests?

Pierre Cheval has interest in Ski Mountainering, Claude Debussy, Jogging.

What skills is Pierre Cheval known for?

Pierre Cheval has skills like Tramway And Elevated Metro Stations, Expertise In Prestressing Works, Civil Engineering, Reinforced Concrete, Construction Management, Works Contract Under Rules Similar To Fidic Contract Conditions, Bridges And Viaducs Construction, Project Management, Microsoft Office, Microsoft Word, Microsoft Excel, Construction.

Not the Pierre Cheval you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.