Piotr Pecenik Ph. D personal email
- Valid
More than thirty years of professional experience in the field of road-planning, road design (ranging from feasibility studies throughout preliminary and detailed design as engineer, supervisor to project manager). Participated in several feasibility studies of multi-modal transport systems, traffic forecast studies (medium and long-term) and traffic modelling including Intelligent Transport Systems solutions. Carried out Road and Urban Master Plans. Involved in several studies of Urban Traffic Control & Roads Capacity Calculations. Technical Adviser for optimal configuration of the new transport system as tramway line, railways & highways. Preparing tender documents according to various regulations (conditions of contract, technical specifications, price list and bill of quantities). Knowledge of advanced software such as AUTOCAD, HCS, TSIS, aaSIDRA etc..Specialties: •Motorways, Highways & Railways,•Traffic Modeling,•Traffic Engineering,•Transport Master Plans & Town-Planning, •Multi-modal Transport Systems, •Traffic Forecast, •Tender Documents, •Technical Adviser & Civil Engineering
-
RetiredCnavs Mar 2023 - PresentGreater Paris Metropolitan Region -
Faculty LecturerTechnological University Of Warsaw Oct 2021 - Mar 2023Warsaw, Poland
-
DirectorHighway & Traffic Studies Limited Jul 2006 - Mar 2023London, United KingdomIndependent Consultant for Highways Design and Traffic StudiesJointly work with LanXang International, for the Ministry of Transport and Maritime Affairs Republic of Montenegro from September 2011 to December 2011.Preparing the Preliminary Report of the proposed Light Rail Transit, first section from Tivat & Kotor to Budva & St. Stephan.Seminars for students of the Technical University of Warsaw, Civil Engineering Faculty concerning the process of the Feasibility Study in 2011 & 2014From October 2014 preparing the doctorate.
-
LecturerVistula University Warsaw Feb 2016 - Sep 2020WarsawLecture of the transportation systems and the railways for the students
-
Urban Public Transport ExpertGopa Infra Gmbh Sep 2019 - Mar 2020Tbilisi, GeorgiaAnalyze of the existing situation,Improvement functionality of multimodal transport system component of: railways, LRT, BRT, buses and taxis.Proposal solutions for the pedestrian areas, sharing spaces (pedestrian / public transport) and bicycles network paths.Contract financed by KfW.
-
Project ManagerConsortium Safege - Eptisa Jul 2017 - Jan 2018Pristina, KosovoFeasibility Study, Preliminary Design and Tender Documents for Road N9 Pristinë – Pejë, Section from Kijevë/Klina to Zahaq -
Quality SpecialistConsortium Safege - Eptisa Jul 2017 - Dec 2017Yerevan, ArmeniaNorth-South Road Corridor Investment Program, Tranche 2 Ashtarak-Talin -
Phd StudentTechnological University Of Warsaw Oct 2014 - Jun 2017PolandPreparation of the doctorate on the Technological University of Warsaw
-
Senior Highway EngineerCorpotrate Solutions Consulting Ltd Jun 2013 - Jul 2013KievSupport to the Implementation of the Transport Strategy of Ukraine financed by E.I.B. (Twinning Project) contract budget 3.5M Euros. Technical Alternatives Lvov - Krakovets – Motorway, estimated cost about 360M Euros – Evaluation of the origin design, comparison the design under the DBN standards with the TEM Standards. Preparing of the technical parameters for the new design under the TEM Standards. Elaboration the plan of the phasing work).
-
Senior Highway EngineerPanteia Mar 2013 - Jun 2013ZagrebPre-feasibility study for the possible transport connection of Croatian territory FWC BENEFICIARES 2009 – LOT2: Transport and Infrastructure EuropeAid/127054/C/SER/multiEnsure continuity of the Republic of Croatia territory, provide security on the future EU external border and Trans-European Transport Network.Checking all existing proposals as bridge, tunnel, ferries and ex-territory motorway; organization and analysis the results of the O-D survey and the traffic count; Multi-criteria analysis of all variants, pre-feasibility of the proposed solution.Project funded by: EuropeAid, contract budget 200kEuros. -
Support To The Implementation Of The Transport Strategy Of UkraineCorpotrate Solutions Consulting Ltd Sep 2012 - Oct 2012KievSupport to the Implementation of the Transport Strategy of Ukraine financed by E.I.B. contract budget 3.5M Euros. Motorway Krakovets – Lvov - Review all historical project; description the existing road or roads, analysis of the existing and forecast; traffic data, accident date. Provide preliminary cost estimates, project, gantt chart showing the main activities required to prepare the project; draft terms of reference for required studies.Beskyd Rail Tunnel – advisory support - review the various outputs, provide advice and support to the CBA Consultant and UZD Lviv
-
Feasibility Study Of The Bar – Boljare Motorway, About 200 Km LengthUrs/Scott Wilson Mar 2012 - Jul 2012Montenegro & GreeceResponsibility of the project designed by Consortium & the Local Company on behalf of the Montenegrin Ministry of Transport, Maritime Affairs and Telecommunications. Review of: Existing Traffic Data & Analyses; Geometric Design Assessment and Road Safety Studies, Responsable of the Project Quality. Project funded by: EIB, contract value 0.5 M Euros. -
Senior Road EngineerNtu - Strategic Development & Consulting Jun 2011 - Aug 2011Define the criteria of the new roads classification of the road network in both functional and administrative terms.
-
Senior Highway / Project CoordinatorKocks Consult Gmbh Sep 2010 - Jun 2011Consultancy Services for the Roads Feasibility and Detailed Design Studies under the Road Sector Program Moldova.Project financed by EBRD, IDA / World Bank and EC
-
Transport ExpertSafege Mar 2010 - Jul 2010Feasibilty Study of the Link Road between D8 (near from Split) to the Motorway A1.Place of work - Croatia -
Lead Highway EngineerUrs Corporation Jan 2009 - Aug 2009FEASIBILITY STUDY, ENVIRONMENTAL AND SOCIAL IMPACT ASSESMENT AND DETAILED DESIGN – MOLDOWA ROADS MCC -
Senior Highway EngineerThe Louis Berger Group Sep 2006 - Nov 2008Adviser after the Ministry of Transport for the project of the Motorway By-pass Deva - Orastie. Project funded by: ISPA; contract value 1.2 MEuro -
Senior Highway EngineerThe Louis Berger Group Oct 2007 - Apr 2008Pre-Feasibility Project of Bar – Boljare Motorway and Adriatic – Ionian Motorway on behalf of the Montenegrin Ministry of Transport, Maritime Affairs and Telecommunications. Project funded by: Montenegrin Ministry of Transport, Maritime Affairs and Telecommunications; contract value 1.38 MEuro. -
Highway EngineerSystra 2006 - 2007Tramway Renewal Project in Bucharest, Dynamic Traffic Model for Bucharest Centre. -
Piu Assistance ManagerCowi Jan 2005 - Apr 2006Participation in preparation of the ToR for the Traffic Management System, Light Rail Transport and the Transport Master Plan for Belgrade. Project funded by: EAR; contract value 3.5 MEuro -
Senior Highway EngineerLouis Berger Jun 2003 - Mar 2004Team Leader of the Pre-Feasibility Project of the SILK Road (Poti, Tbilisi, Baku, Yerevan). Design of more than 500 Km of the motorway.
-
ConsultantOtci 2001 - 2004 -
ConsultantPriane Ingenierie 1996 - 2003Independent Expert, working on: Traffic Studies, Traffic Management, Dynimic Traffic Simulation
-
Ingenieur IndependentSetec International 1996 - 2002
-
Highway EngineerBceom Sep 1995 - Feb 1997Working as Freelance in Belarus, France & Russia -
Highway EngineerSogelerg 1994 - 1995Highway Engineer involved in the M.U.S.E, Multi-Modal Underground Transport Network in Paris area.In charge of checking the design prepared by the MUSE SA on behalf of the client.The Pre-feasibility study of the Link Road between M.U.S.E. and the A86 motorway.
-
Highway EngineerTr-Engineering 1993 - 1994Feasibility study of the motorway between Luxemburg and Merch (l'autoroute du Nord).
-
Computer EngineerBceom Jan 1984 - Mar 1989In charge of road design programs written originally in FORTRAN IV, to be converted into FORTRAN 77 -
EngineerBprw 1975 - 1982
Piotr Pecenik Ph. D Skills
Piotr Pecenik Ph. D Education Details
-
Town Planner, Transport Planner -
Roads & Airports
Frequently Asked Questions about Piotr Pecenik Ph. D
What company does Piotr Pecenik Ph. D work for?
Piotr Pecenik Ph. D works for Cnavs
What is Piotr Pecenik Ph. D's role at the current company?
Piotr Pecenik Ph. D's current role is Lectures on Intelligent Transport Systems.
What is Piotr Pecenik Ph. D's email address?
Piotr Pecenik Ph. D's email address is pe****@****hoo.com
What schools did Piotr Pecenik Ph. D attend?
Piotr Pecenik Ph. D attended Warsaw University Of Technology, Warsaw University Of Technology.
What are some of Piotr Pecenik Ph. D's interests?
Piotr Pecenik Ph. D has interest in Books, New Technology, History.
What skills is Piotr Pecenik Ph. D known for?
Piotr Pecenik Ph. D has skills like Highways, Civil Engineering, Road, Feasibility Studies, Traffic Engineering, Project Planning, Bridge, Rail, Road Safety, Public Transport, Transportation Engineering, Proposal Writing.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial