Enes Aydin
AeroLeads people directory · profile

Enes Aydin Email & Phone Number

Project Manager | Industrial Systems Integration at IDOM Consulting, Engineering, Architecture
Location: Greater Istanbul, Turkey 12 work roles 2 schools
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Project Manager | Industrial Systems Integration
Location
Greater Istanbul, Turkey
Company size

Who is Enes Aydin? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Enes Aydin is listed as Project Manager | Industrial Systems Integration at IDOM Consulting, Engineering, Architecture, a with 22 employees, based in Greater Istanbul, Turkey. AeroLeads shows a matched LinkedIn profile for Enes Aydin.

Enes Aydin previously worked as Site Operations Manager at Ghi Smart Furnaces and Project Manager at Sistem Teknik Industrial Furnaces. Enes Aydin holds Bachelor'S Degree, Mechanical Engineering from Firat University.

Company email context

Email format at IDOM Consulting, Engineering, Architecture

This section adds company-level context without repeating Enes Aydin's masked contact details.

IDOM Consulting, Engineering, Architecture

Review company-level records connected to Enes Aydin before choosing the right outreach path.

Profile bio

About Enes Aydin

Summly, I have experiences mainlyIn shipbuilding and maintenance sector 6 years as planning engineer,In construction steel and industrial steel works 4 years as manufacturing engineer and as site chief,In automation and industrial machinery manufacturing of complete turnkey systems 5 years as project manager and as maintenance manager.

Current workplace

Enes Aydin's current company

Company context helps verify the profile and gives searchers a useful next step.

IDOM Consulting, Engineering, Architecture
Idom Consulting, Engineering, Architecture
Project Manager | Industrial Systems Integration
Bilbao, PV, ES
Employees
22
AeroLeads page
12 roles

Enes Aydin work experience

A career timeline built from the work history available for this profile.

Project Manager

Istanbul, Turkey

At Sistem Teknik Industrial Furnaces Inc. CompanyMy active role as a Project Manager is;Project Planning / SchedulingCoordinating all related departments and peopleFollow Up, Design-Manufacturing-Logistics-Site WorksBudget Planning and ManagingSite Planning and OrganizationCustomer Relations and NegotiationCommissioning and Documentation preparations

Apr 2023 - Sep 2024

Project Manager

Istanbul, Turkey

At LODAMASTER intralogistics systems solutions company my active role isLayout design, installation and commissioning of conveyor and sorter systems, testing andcommissioning steps, handling the delivery to the customer.Leading the installation process in any country on site. I was included in all stages of on-site installation. I have managed more than 16 projects, directly or indirectly, where 70% are European projects.

Jul 2020 - Apr 2023

Maintenance Manager

Istanbul, Turkey

At LODAMASTER intralogistics systems solutions company my active role isAs a service and maintenance manager of the company, my role is to managing the service andmaintenance requests after installation by making electrical, mechanical and software work plans,giving support.Preparing tickets analysis with root causes, making annual, quarterly maintenance plans, preparing spare part set of each projects, being a part of a team who is preparing the SLA agreements.I have visited around 50 - 60 warehouses in plenty of countries for the service and maintenance orcustomer claims purposes so far.

Jul 2020 - Apr 2023

Enterprise Resources Planning Project Engineer

Istanbul, Turkey

At GEMAK SHIPYARD as a planning engineer my role was planning all project -Ship maintenance andrepair in all purposes- processes in the transition of our company to go live on the SAP program, to beused in the current projects.Take an active part in the adaptation, training and MRP stages of the relevant resources (labor, team,material, time, etc.) Parameters of the objects (Material, Equipment, Tool, etc.) used in the projectswithin to be defined on SAP.Creating erp code and product trees by using the templates of the defined objects,Belonging to the manufacturing/maintenance activities of the objects to be used in mechanical projectsor machine maintenance/repair activities.Making method analyzes using given templates and creating processes,Conducting field test studies to verify the prepared processes.

Feb 2017 - May 2020

Project Planning Engineer

Istanbul, Turkey

At GEMAK SHIPYARD in the production of Yavuz Sultan Selim Bridge Steel Deck, approximately47.000 tons of steel structures were manufactured. I took part in the project. My active tasks;Follow-up of steel pre-production processes, Follow-up and quality control of productions at theassembly stage. Technical follow-up, control and coordination of works done by subcontractors,Follow-up of material controls and timely delivery of materials to be used in production,Ensuring that the manufacturing processes proceed as planned in the project plans,Ensuring coordination between the Quality Control unit and the work schedules,Ensuring that the works are carried out according to the relevant procedures, instructions andstandards. Contact with the customer (Hyundai) at every step of project, including delivery works.

Oct 2014 - Feb 2017

Site Manager

Nur-Sultan, Kazakistan

I worked on projects;Nazarbaev University Stage 1-2 around 2000 tons of steel and decorative steel works.Nazarbaev National Library around 500 tons of steel construction.Kazakhstan National Military Academy around 500 tons of steel construction.Astana New Train Station around 1000 tons of steel construction.Active role includes drawing of steel structure manufacturing and assembly projects, supply and supplyof materials in according to project lead times. Preparing the work plan, follow-up and supply of theproduction, making subcontractor-centered work plans. For also deliveries daily follow-ups. Preparingdaily, weekly and monthly finished production status reports, forecasting reports, cost and executionprocesses. Re-planning accordingly. Making and following up claims. Making cost analysis.

Aug 2012 - Aug 2014

Site Engineer

Karaganda Region, Kazakhstan

I worked on the renovation project of 22.000 tons of steel structure and industrial steel structurein ARCELOR MITTAL STEEL MILL in Temirtau - Kazakhstan. I made the assembly plan of steelstructures and industrial structures (equipment, pipes and tanks) according to the project period, thearrangement of the field personnel and the arrangement of the teams and the needed machinery park.I prepared daily, weekly, monthly completed and ongoing pre-assembly and assembly status reports,made an assembly plan according to cost and operational conditions, and reported all completedactivities for progress payment.

Apr 2012 - Aug 2012

Manufacturing Engineer

Karaganda Region, Kazakhstan

I worked on the renovation project of 22.000 tons of steel project in ARCELOR MITTAL STEEL MILLin Temirtau - Kazakhstan. I carried out the manufacturing processes, making material requests andprocurement, making a work plan according to the project lead times, monitoring and supplying theproduction.I made the shift order of the factory personnel and the arrangement of the teams, and the work plansof the subcontractors. I prepared daily, weekly and monthly finished production status reports bydetermining the supplies and finished productions daily and foresight reports and planned themaccording to cost and operational situations.

May 2011 - Apr 2012

Maintenance Engineer

Çanakkale, Türkiye

I took an active role in the mechanical maintenance department of İÇDAŞ STEEL MILL, which isTurkey's 8th largest industrial, in all maintenance, spare parts manufacturing and instantaneousbreakdowns of the electric arc furnace with a capacity of 250 tons.

Jan 2011 - May 2011

Lieutenant

Hakkâri, Turkey

I completed my military service, which is a legal obligation, as a Lieutenant at the border station in Hakkari, under the Gendarmerie Command.

Apr 2009 - Apr 2010
2 education records

Enes Aydin education

Language School

Lsi Language Studies International - Auckland / New Zealand

I lived in New Zealand 1 year, studied 9 months in language school and worked part time 6 months.

FAQ

Frequently asked questions about Enes Aydin

Quick answers generated from the profile data available on this page.

What company does Enes Aydin work for?

Enes Aydin works for IDOM Consulting, Engineering, Architecture.

What is Enes Aydin's role at IDOM Consulting, Engineering, Architecture?

Enes Aydin is listed as Project Manager | Industrial Systems Integration at IDOM Consulting, Engineering, Architecture.

Where is Enes Aydin based?

Enes Aydin is based in Greater Istanbul, Turkey while working with IDOM Consulting, Engineering, Architecture.

What companies has Enes Aydin worked for?

Enes Aydin has worked for Idom Consulting, Engineering, Architecture, Ghi Smart Furnaces, Sistem Teknik Industrial Furnaces, Lodamaster, and Gemak Group Of Companies.

How can I contact Enes Aydin?

You can use AeroLeads to view verified contact signals for Enes Aydin at IDOM Consulting, Engineering, Architecture, including work email, phone, and LinkedIn data when available.

What schools did Enes Aydin attend?

Enes Aydin holds Bachelor'S Degree, Mechanical Engineering from Firat University.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Enes Aydin you were looking for.

View similar profiles