Lead Electrical Engineer
Responsible for Major Capital Projects Typical Projects:BH ARAB C OFFSHORE FIELD REDEVELOPMENTAssociated with Pre-FEED and FEED development for the above project (expected cost approx US $ ~15 Billions,~ 40 Billion QRs). The project entails recovering more than 500 MMbbls enhancing the declining production to 40,000 bopd for another 30-40 years. This involves drilling of 146 new wells with Central Processing Facilities with 50,000 bopd LP Production, 45,000 bopd HP Production, 120 mmscfd Gas Lift, 200,000 bwpd Water Handling (PWRI), 70 MW Power Generation and distribution systems and 200 beds Living Quarters.RAS LAFFAN PORT EXPANSION PROJECT-PHASE PHASE-2 & 3EPC for the project (US $ 4000 Mi). Total electrical power distribution system design development, execution of above facilities involving 132 kV (150 MW +) power intake from KAHRAMAA, 33/11 kV and lower level distribution RAS LAFFAN COMMON COOLING WATER PROJECT-PHASE PHASE-2 & 3Responsible for and involved in Engineering, Procurement, Installation and Construction (EPC) for the project (US $ 1700 million). Responsible for the electrical power distribution system design for the above facilities involving 220 kV (200 MW +) power intake from KAHRAMAA, stepping down to 33 kV and lower levels, distribution to various levels, using various Electrical Variable Speed Driven Pumps (27 off 7,500 kW each) etc.Included Power System Studies including Load Flow, Short Circuit, Transient Stability, Insulation Co-ordination, Relay Setting and Protection Co-ordination Studies, developing specifications, data sheets, requisitions, vendor data/drawing reviews, involving major equipment such as 220 kV GIS, 220/34.5 kV, 165/220 MVA Transformers, 33 kV GIS (Largest 33 kV Sub-station), various 33/6.9 kV and 33/0.433 kV, 11/0.433 kV and 6.6/0.433 kV Power/Distribution Transformers, SCMS, PMS, CRP, FMS etc Electro Chlorinators, Electrical VSDSs, 220 kV, 33 kV, 11 kV, 6.6 kV, 415 V Other Projects On request