Pramod Kumar Shrivastava

Pramod Kumar Shrivastava Email and Phone Number

Civil Engineer, Having 21 years of Extensive Experience in Road Infrastructure Project Management and O&M . @
Pramod Kumar Shrivastava's Location
Ujjain, Madhya Pradesh, India, India
About Pramod Kumar Shrivastava

Graduate in Civil Engineering with 21 years of professional experience in the field of Civil Engineering in the state of India and experience in the construction supervision, design review, planning scheduling and monitoring of project. Preparation / approval of detailed method statement of work as per MORTH and IRC.Experience in Projects of- NHAI, NHAI (O&M), State high ways as well as ADB project and MPRDC. PWD, Development of Industrial area under Audyogik Kendra Vikas Nigam Madhya Pradesh etc.

Pramod Kumar Shrivastava's Current Company Details
Dilip Buildcon

Dilip Buildcon

Civil Engineer, Having 21 years of Extensive Experience in Road Infrastructure Project Management and O&M .
Pramod Kumar Shrivastava Work Experience Details
  • Dilip Buildcon
    Maintenance Manager
    Dilip Buildcon Oct 2020 - Present
    Nh-233 Ghaghra Bridge To Varanasi Road Project Up
    Four Laning of Ghaghra Bridge to Varanasi Section Of NH -233 From KM 121+800 to 180+420 (Package -1 ) From Ghaghra Bridge Abutment on Basti Side To Bhudanpur Urban section in the State Uttar Pradesh NHDP – Phase IV on EPC mode .Position : Manager Maintenance (O&M).Contractor : Dilip Buildcon Limited . Work Responsibility : Same As Project of NH-7 of this CV. Period : From October 2020. To Till date.
  • Vaidhya Orginisation Indore (Infra Structure  Consultant  )
    Project Manager Team Lead In Project Of Mpidc Chhindwara Mp
    Vaidhya Orginisation Indore (Infra Structure Consultant ) Nov 2018 - Aug 2020
    Chhindwara Mp
    Audyogik Kendra Vikas Nigam (AKVN) project at Chhindwara . MP. The Project for Industrial area development and Extension .• Position : Team leader (Consultant Vaidhya organization- Indore.)• Client : M.P. Audyogik Kendra Vikas Nigam ( j) Ltd .Known as MPIDC.• Period : From Nov 2018 to Aug 2020. • Project cost : 96 Cr.Work . - Monitoring of all projects of AKVN in Distt. Chhindwara In Madhya Pradesh.1. Recommendation approval of contractors work program including activity scheduling and resource programming.2. Checking and approval of setting out of the works. Verification or necessary instruct correction of the staked drawings supplied by contractor. Modification in the construction drawings for any variation order .after modification Submission of Working and as built drawings.3. Checking the laboratory and field tests carried out by contractor, and ensure regular testing done by laboratory person.4. Monitoring of Physical & financial progress as per mile stone and deal with Clint for all financial and Technical matter as per tender doc Attend meeting at Bhopal or other places on behalf of AKVN 5. Preparation of Documents for R.A / final bill .Monitoring all type construction Activity with respect to quality and agreement. 6. Guide to site staff to issue site instruction and working procedure.7. Review of DPR and suggest correction to client, if required .Preparation of Qty Deviation or revised estimate.8. Inspection of projects activity and quality as per specification & Approval of design mix.9. Frequently meeting with staff about their duties and responsibilities and Quality testing. 10. managing all financial and physical matter 11. Review and ensure continuity of contractor’s services in approved formats.12. Assist the employer in co-ordination works with different agencies and hold meeting .13. Prepare and issue monthly and quarterly progress reports & quality control test statement
  • Radhika Engineering
    Maintenance Manager
    Radhika Engineering Sep 2017 - Mar 2019
    Nh-7 Mohgaon To Khawasa Dist- Seaoni Mp.
    • Duties Rendered : Project monitoring as per required progress as per schedule of work. Regular inspection for required maintenance and notice the defect in surface of pavements, Mandatory and Regulatory signs. Attained the client at site, attained the monthly progress meeting with client / Consultant. Carry out existing road condition survey and listing all defects of flexible and Rigid pavements, Drainage System, Bridge/ CD works and road furniture. Inspection for Cautionary and warning signs, Clearing, Removing and Maintenance of Plants, Clearing of ditches and culverts, Repair of traffic signs and road markings, Shoulder grading, Pot hole patching and crack sealing, Repair of sealants and Expansion joints of bridges, Repair of cut and fill slopes Regraveling, Resealing/ surface dressing, Overlay, Maintenance of Traffic signs Removal of debris or obstacles from natural causes, Repair of damage caused by traffic accidents.etc. Renewal as per prescribed schedule of NHAI. In inventory and conditional survey checking of pavement, day to day site inspection. Preparation of Monthly progress report to H.O. Manage submission of Bill of Maintenance work with the help of accountant/QS. Work responsibility : “Monthly maintenance work program” preparation and submission in PD office. Daily work program preparation with arrangement of machinery and Staff. Compliance of Pending letters and pending activity, finding and solving Critical issues. All type Correspondence related to the project work. Preparation of all data and record of progress.
  • M/S Raisingh And Company
    Project Manager
    M/S Raisingh And Company Jan 2016 - Aug 2017
    Khawasa Tirodi Katedra Road 43 Km Pqc . Pwd Road
    Position - Project Manager in Rai singh and company.(Contractor)• Clint - Madhya Pradesh Public works department (PWD).• Contractor - Raisingh And Company Chhindwara.MP. • Duration - Jan-16 to August 2017.• Duties Rendered:- Completing project pre-planning processes as per prepared CPM. Work program or schedule, within cost estimations and budgeting, establishing construction schedules, establishment of quality control lab, Establish Batch mixing plant at proper place at site.• Managing on-site construction personnel. Deputed Material Er. Expert in concrete mix and quality testing during construction. Engage Site engineer, surveyor and other site staff etc.• Reviewing compliance with federal and local safety guidelines and standards as per agreement and specifications. Guide to use safety measures at working place and cautionary informatory board fixing.• Preparation of reports focusing on project, physically and financially progress with job status, and costs.• Attend weekly or biweekly meetings to present progress information to superiors. MD and client PWD. • Responsible for negotiating the contracts of subcontractors, communicating with inspectors and client , meeting with construction managers, and coordinating the delivery of materials with suppliers .• Managing material stack yard as according to working distance/ place and easy movements of construction vehicles ,Like - Truck ,Tractor ,Dumper ,Paver , Roller, Mixer,• Got approval of design mix as per available material near the site sources.• Got prior permission of Root Diversion and Blasting. If required.• Preparation of working and as built drawings for project, and submission for approval in office of client/consultant.• Daily Communication with site staff about progress and quality & for next day planning’s.
  • Sadbhav Engineering Limited
    Highway Engineer
    Sadbhav Engineering Limited Aug 2012 - Dec 2015
    Nh-69 A Seoni Section To Narsinghpur. Dist- Chhindwara Mp
    PROJECT : Supervision Construction , Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69 A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26 B in Madhya Pradesh & Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town.• Position : Highway Engineer in Sadbhav Engineering Limited.(Contractor) . • Contractor : Sadbhav Engineering Limited. • Client: :NHAI • Independent Consultant : Aarvee associates india.• Project Cost : 1411.36.Cr.• Period : Aug 2012 to Dec 2015 • Supervision of pavement construction.• Collection and sealing of samples for lab tests.• Day to day site inspection. • Ensure that the field tests are conducted as per frequency and relevant codes and specifications.• Take measurements and keep measurement record as per requirement.• Maintained inspection reports site records, field tests data .RFI also.• Monitor progress of work and implementations of the constructions and maintenance program.• Checking of contractor’s site reports for regular maintenance.• Ensure that the works are being executed as per approved standards and codes.• Check the erection of road barrier signages. Road markings.• Preparation / verification of IPC for petty contractors.
  • Sadbhav Engineering Limited
    Highway Engineer
    Sadbhav Engineering Limited Jan 2009 - Jul 2012
    Nh-7 Seoni To Khawasa Boarder . Nhdp-Ii Program Dist Seoni M.P.
    PROJECT: Design, Construction development, finance operation and maintenance of the work of rehabilitation and upgrading to 4 / 6 lane from Km. 596 /750 to Km 653 / 225 on NH-7 in the state of Madhya Pradesh under North- South Corridor ( NHDP- Phase – II Program ) on BOT (Annuity ) Basis. Contract Package on NS- I / BOT / MP-3. Reach :- Seoni To Khawasa Boarder. In Dist-Seoni.• Position : Highway Engineer in Sadbhav Engineering Limited (Contractor)• Contractor : Nagpur – Seoni Expressway Limited. ( Sadbhav Engineering Limited.) • Client: : NHAI • Cost : 400 Cr.. January 2009 to July 2012
  • Artefact Projects Limited
    Highway Engineer
    Artefact Projects Limited Jan 2008 - Dec 2008
    Nh-7 Seoni To Khawasa Boarder Dist- Seoni
    PROJECT: Design, Construction development, finance operation and maintenance of the work of rehabilitation and upgrading to 4 / 6 lane from Km. 596 /750 to Km 653 / 225 on NH-7 in the state of Madhya Pradesh under North- South Corridor ( NHDP- Phase – II Program ) on BOT (Annuity ) Basis. Contract Package on NS- I / BOT / MP-3. Reach :- Seoni To Khawasa Boarder. In Dist-Seoni.• Position : Highway Engineer in Artefact Project Naghpur (Independent consultant)• Contractor : Nagpur – Seoni Expressway Limited. ( Sadbhav Engineering Limited.) • Client: : NHAI • Cost : 400 Cr.• Supervision of pavement construction.• Collection and sealing of samples for lab tests.• Day to day site inspection. • Ensure that the field tests are conducted as per frequency and relevant codes and specifications.• Take measurements and keep measurement record as per requirement.• Maintained inspection reports site records, field tests data .RFI also.• Monitor progress of work and implementations of the constructions and maintenance program.• Checking of contractor’s site reports for regular maintenance.• Ensure that the works are being executed as per approved standards and codes.• Check the erection of road barrier signages. Road markings.
  • Indian Technocrat Ltd
    Asst Highway Engineer.
    Indian Technocrat Ltd Sep 2007 - Jan 2008
    Agra - Bharatpur Nh-11 ( Bharatpur.)
    PROJECT : Construction supervision of improvement operation and maintenance including strengthening and widening of existing two lane to four lane dual carriageway from Km.17.756 to 62.295 of NH-11 Agra Bharatpur section in the state of Uttar Pradesh & Rajasthan on BOT Basis. Reach: - : Agra to Bharatpur. Position : Astt. Highway Engineer (P.M.C. - Indian Technocrat Limited.) Delhi • Client : NHAI. • Contractor : OSE Jv Leighton • Cost : 195.00 Cr. And Length 45. Km. (4 lane)• Period : Sept 2007 to JAN 2008 Duties Rendered: NHAI Project.• Responsible for filed survey, alignment fixation curve design, layout setting for drainage works.• Calculated the design levels for the total stretch from the data’s given in the drawing.• Calculated the Co-ordination according to the details in drawing and marked at site.• Preparation of working & billing- cross-sections with Q.S.• Fixing the TBM and periodical checking. • Checking of levels of each layer like embankment. Sub grade, GSB, WMM, DBM and BC. RL sheet attaché with RFI.• Designed the FRL for the existing carriageway.• Checking the alignment whenever it was necessary.Involved in execution of earthwork, construction of embankment, Sub grade GSB, WMM. DBM etc. as per MOST specifications with utmost quality control and efficiency.• Ensuring availability of manpower and appropriate equipment at all times during project execution. Attend all RFI of work at site and submit same day in NHAI.• Involved in measurement of final works with QS. And site records.• Checking of adequacy of safety measure implemented by contractor.
  • Louis Berger Group India  Jv Theem Eng
    Assistant Engineer (Road) In (Consultant ) Louis Berger Group India Jv Theem Eng.
    Louis Berger Group India Jv Theem Eng Jan 2007 - Aug 2007
    Chhindwara
    • Responsible for supervision of construction as per specification.• Carrying out topographic survey and soil investigation.• Involved in design reviews and preparation of construction drawing • Monitoring works to start the work like fixing ROW, TBM .Checking alignment, marking alignment at site.• Checking work as per R.F.I. and complete with all enclosures.• Checking of levels of each layer like embankment. Sub Grade, GSB, WMM, DBM and BC. Conducting and checking of quality test for each layer of pavement.
  • Arcon India Pvt. Ltd.
    Head Of Projects ( Arcon India Pvt. Ltd. Contractor )
    Arcon India Pvt. Ltd. May 2005 - Dec 2006
    Chhindwara
    • Responsible for supervision of construction as per DPR and specification.• Carrying out topographic survey and soil investigation. Preparation of work progress. • Involved in work of contactor to deploy machinery and manpower for day to day working with planning of work. Arrangement of material as per requirements with quantity as per day to day working. Meeting with client about progress. • Checking of laboratory work as per required testing.• Preparation of IPC of contractor’s work and submitting for payment to client MPRRDA• Construction maintenance erection and operation method proposed by the operator for carrying out the works are satisfactory, with reference to safety of the works safety of property, safety of personnel and adequacy suitability and safety of construction maintenance and operation equipments.
  • Artifact Projects Nagpur Independent Consultant
    Asst Resident Engineer
    Artifact Projects Nagpur Independent Consultant May 2002 - Apr 2005
    Chhindwara, Madhya Pradesh, India
    • Provide PCL and Checking of setting out of work. • Construction of Embankment, Sub base, base course. CD structure of HPC.• Preparation of working drawing, as built drawing. L –section. X –section.• Maintain records related to work done on day-on-day basis, preparation of RA Bills .• Prepared the Monthly bills and final bills. Given lay out for proposed structure at site. • Construction supervision of highway work as per specification or SP-20 • Involved in Material testing & Quality Control of works at site as well as lab.• Preparation and submission daily& weekly progress to the head office of the company.• Execution work of embankment sub grade GSB, WBM &OGPC,Seal coat layers.• Ensuring safety during construction.• Taking measurement & preparation of IPC .• Taking /Checking OGL, FRLs at each layer of execution.• Carried out all junction development & road furniture, finishing work.
  • Gas  Authority Of India Ltd. Gail. Plant Vijaypur Guna  M.P.
    Contract Engineer In Gas Authority India Limited Gail Vijaypur Guna
    Gas Authority Of India Ltd. Gail. Plant Vijaypur Guna M.P. Jan 2000 - Apr 2002
    Guna, Madhya Pradesh, India
    • Construction of foundation for plant and machinery, • Construction of path way, loading gantry etc.• Maintain records related to work done on day to day basis, preparation of RA bills.• Providing the bar-bending schedule to execute the work according to it.• Attending all fire safety measures in all the aspects.• Prepared the Monthly bills and got checked it with DGM for submission.• Preparation of estimates of cost and material, deploy man power for work and machinery with permission or job Card
  • Sewri Engineering Construction Company Bombay
    Jr. Engineer: (Contractor.)
    Sewri Engineering Construction Company Bombay Feb 1992 - Dec 1994
    Goa, India
    • Responsible for all type of concrete work. Slab casting .foundation, column, circular pillar, belt conveyor machinery foundation, fabrication work .Sand blasting.• Checking of Reinforcement of slabs, columns and Raft foundations. • Preparation of bill of qty. petty contractor.• Maintain records related to work done on day-to-day basis.• Raising of R.F.I. for next day work.• Attending Consultants and Clients in all the aspects technically.• Prepared the Monthly bills and got checked it with Consultant for approval• Erection and fabrication work.
  • Mohan And Associate Contractor
    Site Engineer
    Mohan And Associate Contractor Jun 1990 - Jan 1992
    Ashoknagar, Madhya Pradesh, India
    • Responsible for survey and investigation, land marking.• Construction of Embankment, Sub./ Granular Sub-base • Preparation of estimates of cost and material required at site.• Maintain records related to work done on day-on-day basis, preparation of RA Bills • Preparation of C.D. drawings, construction of structure as per drawing with lay out.• Attending Clients in all the aspects at site.• Preparation of the monthly bills

Pramod Kumar Shrivastava Education Details

  • Board Of Technical Education Madhya Pradesh , Bharath University
    Board Of Technical Education Madhya Pradesh , Bharath University
    Civil Engineering

Frequently Asked Questions about Pramod Kumar Shrivastava

What company does Pramod Kumar Shrivastava work for?

Pramod Kumar Shrivastava works for Dilip Buildcon

What is Pramod Kumar Shrivastava's role at the current company?

Pramod Kumar Shrivastava's current role is Civil Engineer, Having 21 years of Extensive Experience in Road Infrastructure Project Management and O&M ..

What schools did Pramod Kumar Shrivastava attend?

Pramod Kumar Shrivastava attended Board Of Technical Education Madhya Pradesh , Bharath University.

Not the Pramod Kumar Shrivastava you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.