Field Engineer
CurrentProject: Gowanus Canal, Brooklyn, NYTechniques:Diaphragm Wall/Slurry Wall Construction (Sept 2023 – May 2024):Ensured quality control on a $54.2M project by conducting slurry tests, verifying panel alignment, and overseeing concrete pours and rebar installations. Managed field layouts and reporting while ensuring safety compliance.Permeation Grouting (June 2024 – Oct 2024):Managed the injection of 1M gallons of grout on a $9.03M project. Responsibilities included drill layout, quality control, surveying, and fieldwork management, while producing progress drawings and submittals.