Project Manager Interior Fit-Out Package
CurrentWorking as Project Manager for the Interior fit-out works for the Hilton resort in Muscat. The project was changed from a Clubhouse to a 5 Star Hotel with 205 keys which resulted in scope changes. The 5star resort was redesigned to accommodate the requirements of the operator Hilton. Was closely involved in the design development with the Operator, Client.