Senior Manager Instrumentation
Current1. Erection & Commissioning of Line-4, Nimbahera (Raj.)✓ Engineering, Erection & Commissioning of Line-4 LS Reclaimer, Transport, Raw Mill -1 & 2, Bag house section.2. Automation Engineering, Erection & Commissioning of 1x30 MW CPP✓ Complete Engineering, Drawing approval for captive power plant DCS (ABB 800 xA).✓ Software & Hardware FAT/SAT conducted in co-ordination with all OEM’s & ABB.✓ Erection, Networking & Commissioning of complete DCS systems.✓ Measurement verification & Billing for C&I Main package for supply & erection part.✓ Erection & commissioning of Water treatment plant-3.3. Erection & Commissioning of Line-3, Nimbahera (Raj.)Section: Coal mill & DCS ✓ Commissioning of Plant DCS system (Siemens) of complete clinkerisation unit.✓ Erection & commissioning of Coal mill section with all safety aspects.✓ Complete engineering, drawing finalization, system FAT.✓ Coordination with Vendors, Expedite manufacturing, Inspection etc.✓ Final billing & closing of project with Inst. main package supplier.4. Engineering, Erection & Commissioning of Grinding Unit (Green Field)✓ Successfully commissioned 265TPH Pfeiffer MVR6000 within time frame.✓ Control system architecture design, logic development on ABB 800XA v6.0.3 system.✓ Complete engineering, drawing finalization, system FAT.✓ Coordination with Vendors, Expedite manufacturing, Inspection etc.✓ Erection and commissioning of Cement mill & Packing plant with auto truck loader.