Senior Vice President
CurrentI am Head of Pumped Storage Division and Am Project Director ( Operations ) National and international projects.
Please complete the CAPTCHA to continue
A concise factual answer block for searchers comparing this professional profile.
Rajan Kumar is listed as Sr. Vice President DMR Hydroengineering and Infrastructures Pvt Ltd Faridabad ( Ex. Executive Director NHPC ) at DMR HYDROENGINEERING & INFRASTRUCTURES PRIVATE LIMITED, a company with 6 employees, based in New Delhi, Delhi, India. AeroLeads shows a matched LinkedIn profile for Rajan Kumar.
Rajan Kumar previously worked as Senior Vice President at Dmr Hydroengineering & Infrastructures Private Limited and Executive Director at Nhpc Limited. Rajan Kumar holds Bachelor Of Technology, Civil Engineering from Jntu College Of Engineering Kakinada ( Andhara Pradesh ).
This section adds company-level context without repeating Rajan Kumar's masked contact details.
Review company-level records connected to Rajan Kumar before choosing the right outreach path.
I am highly motivated, energetic, and results-driven Civil Engineer with extensive experience in Pumped Storage and Hydro Sector, Superannuated on 31st August 2022 from the post of Executive Director (J&K Region) NHPC Ltd., CPSU. I led J&K Region of the corporation, overseeing the operations of five power stations ( 2130 MW ). I also held additional charge of the Ladakh Region ( two PS of 89 MW ) and the Banikhet Region, (five PS of 1389 MW ). I acted as a catalyst in the major decisions of these projects. I managed all regional activities, including liaising with state government bodies, corporate offices, MOP and other central government agencies.I served as Head of the Sawalkote H E Project (1856 MW ). I have over 38 years of experience in activities such as planning, estimating, finalizing contracts, execution, monitoring, costing, handling post-award cases, arbitration cases, claims, and coordination with local and state authorities in case of multidisciplinary projects. I commenced my career at NHPC in February 1985, contributing to major works in 540 MW Chamera 1 project, where I played a key role in the concreting of the main dam. Subsequently, I served at the 60 MW Rangit and the 280 MW Dhauliganga projects for a combined duration of nine years. Additionally, I worked on projects such as the 800 MW Parbati (approx. two years) and the 160 MW Teesta Low Dam (approx. 3.5 years). In J&K, I was the head of the 120 MW Sewa-II and 1856 MW Sawalkote HE project. I gained valuable experience working in the Corporate Contract and project’s contract Divisions . In this role, I formulated, processed, and finalized major civil works tenders ( Package wise as well as EPC ) through international competitive bidding (FIDIC as well as World Bank based conditions ) and domestic bidding. I successfully managed the entire process, from drafting of bid documents to contract award. .I handled post-award cases of major works under FIDIC-based contracts, requiring approvals at the Director/Chairman/Board . I also looked after the policy aspects in the corporate contract division and was involved in the formulation of the common bid conditions for all hydropower utilities under MOP.I take pride in my experience , constructing the first NHPC and the third of India’s fly ash-based Roller Compacted Concrete Dam (RCC Dam). I am eager to continue utilizing my wealth of experience, achievements, and expertise to new opportunities for the development of the nation.
Company context helps verify the profile and gives searchers a useful next step.
A career timeline built from the work history available for this profile.
I am Head of Pumped Storage Division and Am Project Director ( Operations ) National and international projects.
Jammu, Jammu & Kashmir, India
As head of the Region, I was In charge of all 5 NHPC’s Power Stations (2130 MW ) in UT of J&K. During the period I had an additional charge of the Ladakh Region ( 2 PS of 89 MW ) and Banikhet Region ( 5 PS 1389 MW ) Accordingly, the Head of these power stations directly reported to me and I acted as a catalyst in their major decision-making. I was.
Corporate Office (Project Investigation Division, Quality Assurance Division )
Looked after survey work and drilling work in the investigation projects. During the period record drilling work was done. In addition, the DPR of the Duggar HE Project was also submitted before the schedule and work on the preparation of other DPR was taken up. During the small part of the period I also looked after quality assurance works at the.
Sewa Power Station Mashka Khatua Jammu And Kashmir
Being head of the project I was involved in and responsible for every activity of the Power Station. Apart from technical issues, handling local issues and liaisoning with District and state administration was also the responsibility of the HOP. During my tenure, the power Station achieved a plant availability factor of over 104 % and was awarded the best.
Corporate Office Faridabad
Had an opportunity to work in the Corporate Contract Division in 2nd tenure. Being in charge of the policy aspects of Contractual matters, have redrafted Particular Conditions of Contract for FIDIC 1999 based upon the experience gained from problems faced during execution, arbitration cases, and change in a construction industry environment. Associated for.
Teesta Low Dam Project Stage - IV West Bengal
I Was responsible for field control and Contract Management of major civil works (FIDIC-based) of the Project. The work involved the construction of a Power House, Roller compacted Concrete (RCC) dam using FLY ASH which was being constructed first time in NHPC and it is the 3rd RCC Dam in India. I was also incharge of the Other activities such as Township.
. Corporate Services Division Faridabad
.I was also instrumental in the development of infrastructure facilities/ services for the Corporate Office and Township ( pprox.. 400 qtrs., marketing complex, Guest House, Clubs, etc.) at Faridabad. I was incharge of the EMS Contract Division. I was the key person for planning, estimating, preparation, and finalization of tender for first GREEN BUILDING.
. Corporate Contracts Division Faridabad
During the tenure, finalized the tender (preparation of documents to award) on ICB basis with FIDIC conditions for the Civil package of Chutak Hydro Electric Project (44MW) in Kargil, Nimoo Bazgo HE project ( 45 MW ) Leh, Repair of Channel of THEP and Finalisation of Tender of Civil works package of KotliBhel Hydroelectric Project, (195 MW) and looked.
Parbati Stage -II Hydro Electric Project Himachal Pradesh
I was in charge of the project procurement and contract division div and head of the Technical Division of the Project I had the responsibility of coordination and communication amongst far-flung sites of this Project encompassing a perimeter of about 120 Km. Being in the administrative office at Nagwain I had to address issues about environmental aspects.
Regional Office Jammu
I was responsible for the examination of Technical Issues of the Regional Office including case files of the projects under the Region. I was also responsible for Liaising with the project corporate office and state Govt. Being incharge of the Regional Contract Division, finalized the tenders under the regional and also examined the contract files of the.
Director Project Office
Handled Technical Issues of the Director Project office including liaison with projects, Ministry of Power, CEA, and other Central Govt. Organisations.Acted as a coordinator between the projects and the corporate office. Had liaisoning with center Govt agencies like MOP, CEA, etc
Dhauliganga Hydro Electric Project 280 MW
I was responsible for the infrastructure development of the project at Dobat, Nigalpani, and Tapovan. I also remained associated with the planning and tendering including finalising of contracts for works of my areaExperience in Infrastructural Development and Planning
Rangit Hydro Electric Project
I was responsible for the infrastructure development of the project at Rangit Nagar and the departmental execution of tunnel work including Store work at the liaison office in SiliguriRemained associated for award of infrastructure works of the townshipExperience in tendering and Infrastructural Development works including departmental execution of.
Chamera Hydro Electric Project 540 MW
Remained Actively involved in facility development such as the establishment of a Batching Plant, Crushing Plant, and Ropeway system for major concreting work for the main dam of the project. Remained involved in major Activities for the diversion Tunnel. main dam concreting and associated activities. During the tenure concrete placement of approx. 11 Lacs.
Quick answers generated from the profile data available on this page.
Rajan Kumar works for DMR HYDROENGINEERING & INFRASTRUCTURES PRIVATE LIMITED.
Rajan Kumar is listed as Sr. Vice President DMR Hydroengineering and Infrastructures Pvt Ltd Faridabad ( Ex. Executive Director NHPC ) at DMR HYDROENGINEERING & INFRASTRUCTURES PRIVATE LIMITED.
Rajan Kumar is based in New Delhi, Delhi, India while working with DMR HYDROENGINEERING & INFRASTRUCTURES PRIVATE LIMITED.
Rajan Kumar has worked for Dmr Hydroengineering & Infrastructures Private Limited and Nhpc Limited.
You can use AeroLeads to view verified contact signals for Rajan Kumar at DMR HYDROENGINEERING & INFRASTRUCTURES PRIVATE LIMITED, including work email, phone, and LinkedIn data when available.
Rajan Kumar holds Bachelor Of Technology, Civil Engineering from Jntu College Of Engineering Kakinada ( Andhara Pradesh ).
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.