Ralf Konrad Email and Phone Number
Ralf is a Geotechnical Director with Gaia Engineers Ltd. His geotechnical work experience covers a wide range of specialist designs for large-scale engineering and infrastructure, bridge, roading and tunnelling projects. A selection of my project experience listed below. For further information and more exciting projects, visit our website www.gaia-engineers.co.nzWaka Kotahi NZTA Te Ahu a Turanga (Manawatū Tararua Highway), 2019 – ongoing Geotechnical tender and detailed design, and construction observations; Earthworks design lead for 12km length of expressway with 6million m3 of earthwork. Waka Kotahi NZTA Auckland Northern Corridor Improvement (NCI), 2017 – ongoingGeotechnical tender and detailed design, and construction observations. Design lead for 8km of MSE, soldier piles, post & panel retaining walls. Waka Kotahi NZTA Awakino Tunnel Bypass, Awakino, 2017 – ongoing, Geotechnical Design LeadGeotechnical design of a new 2.3km long SH3 alignment including two bridges over the Awakino River, retaining walls up to 10m high with a combined length of approximately 600m long. NZTA Waikato Expressway: Huntly Bypass, 2014 – 2020Design team lead and designer for the geotechnical design of 4 stream bridges 80m to 100m long over stream with soft and liquefiable ground conditions and deep pile foundation. Waka Kotahi NZTA Waikato Expressway: Tamahere – Cambridge, 2012 – 2015Design of steel ladder reinforced MSE wall bridge abutments and bridges on piled foundations, including foundation design for 40m high Karapiro Gully Bridge. Waka Kotahi NZTA SH2 Tauranga Eastern Link, Tauranga, 2010 – 2015Geotechnical design of bridge pile foundation, bridge abutments, MSE retaining walls, 40,000m3 of polystyrene (EPS) and ground improvements on soft ground.Lower Hatea River Bridge, Whangarei, 2011 – 2013Geotechnical detailed design of bridge pile foundations, bridge abutments including ground improvements and an EPS embankment and new road over landfill. SH16/SH18 Hobsonville Deviation and Brigham Creek Extension, Auckland, 2008 – 2011Earthworks design for 6km of motorway, including up to 16m high embankments and 12m deep cuts. Rosedale Wastewater Treatment Plant, North Shore City, Auckland, 2008 Temporary works design for a 45m deep temporary access shaft for TBM Tunnel Project. Project Hobson, Auckland, 2007 – 2009Temporary works design of four shafts, up to 35m deep and 23m diameter with rock bolt stabilisation, tunnel excavation design for 4.8m diameter conventionally excavated tunnel and cross passages.
Gaia Engineers Ltd
View- Website:
- gaia-engineers.co.nz
- Employees:
- 8
-
Geotechnical DirectorGaia Engineers Ltd Dec 2017 - PresentAuckland, New Zealand -
Senior Associate, Geotechnical EngineerGaia Engineers Ltd Jan 2014 - Nov 2017
-
Geotechnical EngineerPeters & Cheung Ltd Mar 2006 - Dec 2013Auckland, New Zealand
Frequently Asked Questions about Ralf Konrad
What company does Ralf Konrad work for?
Ralf Konrad works for Gaia Engineers Ltd
What is Ralf Konrad's role at the current company?
Ralf Konrad's current role is Geotechnical Director at Gaia Engineers Ltd.
Not the Ralf Konrad you were looking for?
-
Ralf Konrad
Schaan2bluewin.ch, vpbank.com -
1moba-automation.com
-
-
Ralf Konrad
Düsseldorf1t-systems.com1 +496920XXXXXXX
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial