Ralph Mayer work email
- Valid
Ralph Mayer personal email
• 43 years of experience in Engineering, Commissioning, Erection and Technical Services in all fields of power stations. More than twenty-nine years of experience in fossil and natural gas fired power stations, three years of experience in nuclear power stations including a world prototype (THTR 300). More than six years experience on steam turbine control and their supervisory units.• Managerial skills through the position of Site Manager, Construction and Commissioning Manager, and Engineering Manager for various projects.• Detailed knowledge of various Combined Cycle Plants, next to large scale supercritical and ultra-supercritical Utility Boilers • Certified and registered Project Management Professional (PMP) since 2013
-
Senior Performance Testing And Design EngineerGe Power Apr 2014 - Jun 2024Windsor, Ct - UsaPlan, conduct or coordinate a wide range of highly complex engineering activities encompassing one or more engineering disciplines. Develop recommendations based on sound engineering practices and business considerations. Serve as consultant to senior management and major customers regarding advanced technical studies, their potential application and the resolution of complex problems. Proactively develop and implement measures to improve operations and customer satisfaction. Provide Plant Commissioning, Operation, and Guarantee Testing support during bid and execution through contract completion -
Senior Project Engineer – Project Engineering ManagerGe Power May 2011 - Apr 2014Windsor, Ct - Usa & Lumut, MalaysiaCoordinate the engineering efforts on a Project working with the Project Engineering Manager. Interface with functional engineering groups and coordinate subcontracted suppliers of engineering deliverables on a complex, multi-partner project. Represent the Engineering Department on the Project Director’s project team. Since 2013 acting as Project Engineering Manager and Project Engineer. Coordinates all engineering phased during contract execution, of assigned domestic and/or international projects (project scope is substantial with high dollar value, often involving unusual multi-partner arrangements). Project success is highly dependent on incumbent’s effectiveness in coordinating various groups in a matrix environment. Directly affects the engineering efficiency on the project. -
Alstom Construction And Commissioning Site ManagerAlstom Power Nov 2007 - May 2011Lingen, GermanyManaging the execution of the Erection of Boiler Plant, Electrical, I&C and Process Equipment, Commissioning and Start-up, and Operation of a Triple Pressure HRSG and advising the customer on all boiler plant related and interfacing issues.The project consists of two top supported, triple pressure, once through HRSG with a GT26 gas turbine and one common steam turbine.Because of special circumstances also managing the contract negotiations and set-up, manufacturing, quality control and logistics for delivery of two new boiler structures at a local manufacturer (first time manufacturer) in a record time of less than three month from contract award to delivery to site. -
Alstom Construction And Commissioning Site ManagerAlstom Power Nov 2006 - Oct 2007Gissi, ItalyManaging the execution of the Erection of Boiler Plant, Electrical, I&C and Process Equipment, Commissioning and Start-up, and Operation of a Triple Pressure HRSG and advising the client on all technical issues relating to boiler plant.The project consists of two top supported triple pressure HRSG with a single shaft GT26 gas turbine and single steam turbine per unit. -
Alstom Construction And Commissioning Site ManagerAlstom Power Aug 2004 - Oct 2006Tanta, EgyptAlstom Site Manager and in country project manager for the project consisting of four (4) OCCTM, loose harp installation , triple wide, triple pressure HRSG. The project was fabricated in country for more than 85% at our partner Dillinger Steel Duisburg DSD in Cairo. The project was completely executed with local staff, managed only by the Alstom Site Manager. The project was delivered two (2) month ahead of schedule with more than 1 million man-hours of work with “no time lost time accident” -
Alstom Construction And Commissioning Site ManagerAlstom Power Dec 2003 - Jul 2004Keokuk, IowaAdvising the Customer on the execution of the Erection of Boiler Plant, Electrical, I&C and Process Equipment, Commissioning and Start-up, and Operation of a Dual Pressure, Fresh Air Fired HRSGThe project consists of one Prototype C-FrameTM design, top supported dual pressure HRSG with fresh air firing and on line split operation capability through a bypass stack. The unit was optimized for “net zero” output operation with minimum natural gas usage through “intelligent” burner management system developed specifically for this site by me -
Mat'L Receiving & Transportation Mngr; Site Construction & Commissioning Mngr For Hrsh Ics-24Alstom Power Oct 1999 - Jul 2003Roquete of America CoGen Project, Keokuk, IAHaynes Repowering Project, Los Angeles, Long Beach, CASunrise II Power Project, Fellows, CALa Paloma Energy Project, McKittrick, CAMidlothian Energy Project, Midlothian, TX -
Engineering ManagerAlstom Power May 1998 - Oct 1999Paiton, Indonesia - Eat JavaExecution and managing of the Boiler Plant Engineering effort during contract execution.The project consists of Phase I and Phase II, both 2 x 685 MW respectively 2 x 650 MW tangential coal fired, controlled circulation, sliding pressure drum boilers. -
Abb-Ce Representative Technical Consultant To Gec AlstomAbb-Combustion Engineering Mar 1998 - May 1998Guangzhou, Prc And Knutsford, Cheshire, Uk• To consult with GEC Alstom and its representatives regarding the development and analysis of information to support the delay event schedule process and to prevent the claim of liquidated damages from the consortium.• To furnish history information, advise or consult GEC Alstom in relation to the delay in completing the Shajiao ‘C’ Power Project.• To represent ABB-CE in the technical meetings between the employer for the Shajiao ‘C’ Power Project and GEC Alstom, and to advise GEC Alstom in all aspects related to the scope of supply by ABB-CE. • To participate in a Plant Reliability Review team to evaluate the commissioning and operation of the Shajiao ‘C’ Power Project and to recommend improvements to the owner for the future operation and maintenance.• To assist the Project Management Team of GEC Alstom and its legal advisors in developing strategies for the claim negotiations with the Shajiao ‘C’ Power Project employer and his representatives.
-
Balance Of Plant Performance Design EngineerAbb-Combustion Engineering Apr 1997 - May 1998Windsor, Ct - UsaExecution and managing of the Boiler Balance of Plant (BOP) engineering effort during proposals and contract execution.Responsibilities :• Providing input to Project Engineering, Business Development and Proposal Development as required for Boiler BOP engineering issues during the proposal process including participation in technical contract negotiations with the client • Assuring that the BOP scope is clearly identified and defined so that the final proposal reflects the costs and risks associated with the BOP • Evaluating outside resources for getting BOP engineering executed • Managing subcontractors when BOP is outsourced making sure that work is done on schedule and as specified • Preparing specifications and engineering schedules • Preparing engineering studies and proformas relating to full turnkey projects • Assuring engineering documents and engineering requisitions relating to BOP conform to QA/QC requirements • Development of calculation schemata for supercritical boiler start-up systems with various heat recovery systems
-
Process And Performance EngineerAbb-Combustion Engineering Aug 1994 - Apr 1997Guangdong Province, PrcThe project consists of 3 x 660 MW tangential coal fired, controlled circulation, sliding pressure drum boilers. Responsibilities : • Development of test procedures for Performance Guarantee Tests, Plant Handling Trials and Reliability Trial Run • Determination and scheduling of pre-testing (optimization of unit performance) and testing activities • Co-ordination of activities with consortia partner, sub-contractors and commissioning departments • Supervision of optimization and testing activities • Evaluation of test results • Developing / improving of unit operating procedures • Negotiations with customer on acceptance of test procedures and test results • Fine tuning and control enhancements in unit control scheme
-
Consultant Engineer For Process And Unit Control And InstrumentationUtility Consultants International (Uci) Oct 1989 - Jul 1994Witbank Area, South Africa• Reported directly to the Power Station Manager • Responsible for unit optimization and achieving station targets such as reliability, availability, station performance and efficiency for KENDAL's 6 x 686 MW tangential coal fired, controlled circulation, sliding pressure drum boilers (built by ABB-CE) with dry cooling system. • Dealt directly with the main contractors namely ABB-Combustion Engineering (CEII, Steam Generators), ABB Industry (Controls) and Kraftwerk-Union (SIEMENS-KWU, Turbines) on enhancing system design and performance It should be pointed out, that the KENDAL units were modified with a new Reheater temperature Control Circuit based on gas mass flow control, mainly developed on my investigations and recommendations • Member of an evaluation committee of unit take-over negotiations within ESKOM's management team • Appointed as "Mister Control and Optimization" with the responsibility of evaluating, modifying if necessary and approving any modification proposed by any party to be implemented into the control system • Mentor for young Engineers in training on process control (one of them became the first native African person Power Station Manger in ESKOM’s history) • Lecturer on control basics and closed loop philosophies for Engineering Department engineers • Received Manager's Award presented by ESKOM for improvements and innovations in recognition of a contribution of exceptional value to ESKOM in the year 1992 (first time in ESKOM’s history that this award was ever given to a non ESKOM employee and foreigner)
Ralph Mayer Skills
Ralph Mayer Education Details
-
University Of Wiesbaden, GermanyIndustrial Engineering
Frequently Asked Questions about Ralph Mayer
What is Ralph Mayer's role at the current company?
Ralph Mayer's current role is Senior Performance Design Engineer, PMP(Retired).
What is Ralph Mayer's email address?
Ralph Mayer's email address is rm****@****wer.com
What schools did Ralph Mayer attend?
Ralph Mayer attended University Of Wiesbaden, Germany.
What skills is Ralph Mayer known for?
Ralph Mayer has skills like Project Management Professional, Senior Engineer For Performance Design, Mentoring, Complex Problem Solving Skills, Project Management, Self Motivated.
Not the Ralph Mayer you were looking for?
-
Ralph Mayer
San Diego Metropolitan Area2mayermail.net, moneythumb.com -
Ralph Mayer
Educational Technology/Training & Development At Midlands Technical CollegeLexington, Sc1midlandstech.edu -
-
Ralph Mayer
San Jose, Ca2sanmina.com, sanmina-sci.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial