Deputy General Manager
Current• Approval of Environment clearance & NOC for Green Filed Project of 2 million ton and further its extension after expiry of its validity period.• Required approval from UP state Industrial development corporation (UPSIDC)• Approval for ground water extraction form CGWB• Renewal of CTO for 5 years• Installation of online SOx, NOx and dust monitoring system in CPP stack.• Commissioning of online dust monitoring system in all the three Cement Mill bag filter ducts.• Commissioning of ON Line Ambient Air Quality Monitoring System • Installation of RO plants for colony and plant to provide the safe drinking water.• Installation of dust suppression system in open gantry to control the fugitive emission. • Completed PAT cycle-1 & 2 compliance including mandatory energy audit.• ACC Tikaria achieved ever lowest SEC 32.65 kWh/ton in FY 2019. • Assisted in installing bigger boiler feed pump to avoid the dual pump running and got implemented with the help of CPP team and saved approx 110 kW Power (Saving of Rs.32.47 Lac/annum)• Carried out the modification in Cooling water circulation pipe line and saved 22 kW pump running (Saving of Rs.7.39 Lac/annum)• Carried out the modification in one bag filter duct and stopped the running of second bag filter (Saving of Rs.3.60 Lac/annum)• Installed mist cooling system in Cement Mill section and avoided the operation of Mechanical cooling tower.• Identified the scope and installed VFDs in 6 bag filter fans and saved around 100 kW power. • Carried out modification in water pipe line of pre-grinder and stopped the running of one 22.5 kW pump.• Replacement of beam of wagon tippler within 8 days as against given time period of 28 days by OEM.• Installation of electromagnetic flow meter/ultrasonic flow meters and its networking for online data acquisition for water balancing.• Approval of tree felling form forest department for 672 trees which were coming on the way of project area