Senior Lead Engineer At Interconnector Team
Current‣ Review and development of operating procedures for the Greenlink interconnector: Development of high-level technical and legal procedures (in collaboration with Greenlink and National Grid) and detailed procedures, focusing on operation at the NCC (Irish Electricity System Control Centre) and on the company's operational processes. Greenlink is a 500 MW, 320 kV, 500 M€ direct current subsea interconnector that will link the south of Ireland to Wales and is scheduled to be operational by the end of 2024.‣ Development of regional coordination services for EirGrid, in collaboration with Coreso. This coordination is key to the future connection of Ireland to France via the Celtic Interconnector (700 MW, 320 kV, 1600 M€), which is expected to be operational by the end of 2026.‣ ENTSOE “Inter-Synchronous Area” Working Group: Until June 2024, I represented EirGrid in this working group which focuses on the harmonisation of operational criteria for DC interconnections in Europe.‣ ENTSOE “Steering Regional Coordination” Working Group: Since July 2024, I represent EirGrid in this working group which facilitates, coordinates and promotes regional cooperation between Regional Coordination Centres (RCCs) and TSOs.