Engineer
Kowloon, Hong Kong Sar
Main Projects:1. CE 3/2023 (WS) Supply of Reclaimed Water To Tin Shui Wai, Yuen Long and Tuen Mun – Yuen Long Corridor – Investigation, Design and Construction• Design a new reclaimed water supply system that utilizes the Treated Sewage Effluent (TE) to produce reclaimed water. • Design the Yuen Long Water Reclamation Plant (YLWRP) to treat the TE discharged from the YLEPP and produce reclaimed water.• Design the Wang Chau Reclaimed Water Service Reservoir, incorporating re-chlorination and dye dosing facilities2. CE 79/2019 (DS) Construction of Dry Weather Flow Interceptor at Hung Hom and Causeway Bay – Investigation, Design and Construction3. CE 48 /2020(DS) Construction of Dry Weather Flow Interceptor at Tsuen Wan – Investigation, Design and Construction4. CE 49 /2020(DS) Construction of Dry Weather Flow Interceptor at Shau Kei Wan – Investigation, Design and ConstructionThese projects aim to design newly designed dry weather flow interceptors (DWFI) to be constructed at Hung Hom and Causeway Bay, Tsuen Wan, and Shau Kei Wan. The proposed DWFI involves the construction of a filtering station, an electrical and mechanical (E&M) kiosk, a flow interception device (FID), and underground emergency bypass box culverts. These projects aim to intercept and filter the dry weather flow (DWF) inside the Box Culvert, divert it to the filtering station for treatment, and discharge it back to the box culvert. This will help alleviate pollution and odour issues in the urban coastal water.Other Projects:•CE 42/2018 Drainage Improvement Works in Wong Tai Sin And Kowloon City – Investigation•CE32/2015 (EP) Further Enhancing Quality of Coastal Waters of Victoria Harbour – Feasibility Study•CE92/2017 (CE) Site Formation and Infrastructure Works for Public Housing Development Near Tan Kwai Tsuen, Yuen Long – Investigation, Design and Construction•CE56/2012 (DS) Port Shelter Sewerage Stage 2 – Design and Construction