Rhey Naval

Rhey Naval Email and Phone Number

Schedule Controller cum Civil Works Interface Engineer @ Nippon Signal Co. Ltd.
Valenzuela, NCR, PH
Rhey Naval's Location
Metro Manila, National Capital Region, Philippines, Philippines
Rhey Naval's Contact Details

Rhey Naval personal email

About Rhey Naval

To continue to operate in an appointment offering challenges and responsibility commensurate with skill and experience.More than twelve years experience in construction and nineteen years experience in plant maintenance and turnaround environment has provided me with a well developed knowledge in construction and maintenance management both conservative and computerized method, as well as diverse site practices and procedures, throughout the Philippines and overseas.Construction:Appointments have been on “hands on” management position involving project planning, scheduling and controlling. Computer applications to handle difficult task in planning, scheduling and controlling i.e. Primavera 6.0, Artemis, MS Project, Fast Track, Timeline etc.Maintenance and Turnaround:Skilled in utilizing maintenance management system i.e. SAP; MDRM; SmartPlant. Experience in implementation and improvement of reliability-centered maintenance programs. Highly skilled in utilizing Primavera software in Turnaround and Plant Shutdown scheduling and monitoring.Material & Spare Parts Management:Experienced in utilising IT-based parts and material management systems. Skilled in identifying, specifying and requisitioning equipment, parts and materials that meet the approved company standards and original equipment manufacturers recommendation(s), and in establishing maximum, minimum and re-order levels for parts and materials.Other Skills:Areas or responsibility also involved quantity take-off, unit price analysis, value engineering and field supervision. Also include system development for complicated task beyond the capability of project management software using DBMS programming capabilities i.e. MS Access, Visual Basic, Paradox etc. Prepare marked plot plan identifying equipments and major activities of the turnaround using AutoCAD and Sketchup.

Rhey Naval's Current Company Details
Nippon Signal Co. Ltd.

Nippon Signal Co. Ltd.

View
Schedule Controller cum Civil Works Interface Engineer
Valenzuela, NCR, PH
Rhey Naval Work Experience Details
  • Nippon Signal Co. Ltd.
    Schedule Controller Cum Civil Works Interface Engineer
    Nippon Signal Co. Ltd.
    Valenzuela, Ncr, Ph
  • Nippon Signal Co. Ltd.
    Schedule Controller / Civil Works Interface Engineer
    Nippon Signal Co. Ltd. Apr 2022 - Present
    Philippines
    - Involved in signalling system for Metro Manila Subway Project- Create detailed signalling schedule according to Employer ERG and ERT requirements.- Update schedule and monitor the progress, inform PM for criticallity of delay.- Issue and monitor 3 months look ahead schedule.- Create weekly and monthly progress report.- Analyze schedule if key dates are still achievable.- Analyze delay if EOT is applicable.
  • Stanford It Learning - The Training Division Of Cim Technologies, Inc.
    Primavera P6 Trainer
    Stanford It Learning - The Training Division Of Cim Technologies, Inc. Mar 2020 - Present
    Makati, National Capital Region, Philippines
    - Primavera P6 basic training- Primavera P6 advanced training
  • San Miguel Corporation
    Technical Officer (Project Management)
    San Miguel Corporation Nov 2019 - Mar 2021
    Pasig, National Capital Region, Philippines
    - Engage in MRT7 Project, Philippines- Hire as direct contract employee by SMC-MRT7 after MEPC contract with SMC expired. To continue project management support for MRT7 Project.- Owner (SMC) project management representative.- Create weekly and monthly report- Analyze workable and non-workable area using Autocad for visualization, comparing P6 schedule submitted by contractor.- Analyze delay if it is considered as Variation Order entitled with Extension of Time.- Analyze the P6 Schedule submitted by contractor verifying durations, loading and work steps.- Monitor look ahead schedules if being followed by contractor.
  • Muhibbah Engineering (M) Bhd.
    Senior Planning Engineer
    Muhibbah Engineering (M) Bhd. Aug 2019 - Nov 2019
    Pasig, National Capital Region, Philippines
    - Engage in MRT7 Project, Philippines- Create weekly and monthly report- Analyze workable and non-workable area using Autocad for visualization, comparing P6 schedule submitted by contractor.- Analyze delay if it is considered as Variation Order entitled with Extension of Time.- Analyze the P6 Schedule submitted by contractor verifying durations, loading and work steps.
  • Projectpro Inc.
    Primavera Schedule Engineer
    Projectpro Inc. Feb 2019 - Jun 2019
    Limay, Central Luzon, Philippines
    - Hired as a Primavera Software specialist for Petron Philippines 2019 Turnaround- Support Petron Philippines turnaround located at Limay Bataan, Philippines in terms of scheduling.- Create the master schedule for TAR.- Create high level reporting (Look Ahead Report, Progress Curve, Critical Path Analysis, Delay Analysis, etc.) for turnaround management team, in order for them to control effectively and efficiently the turnaround. - Advice the turnaround team for critical activities and activities becoming critical.- Analyze critical equipment resource loading.
  • Sabic
    Turnaround Engineer
    Sabic Aug 1998 - Nov 2017
    Yanbu Industrial City, Al Madinah, Saudi Arabia
    - Successfully completed 2014 Ethylene-1 turnaround- Successfully completed 2011 Glycol-1 turnaround- Successfully completed 2008 Glycol-1 turnaround- Successfully completed 2007 Glycol-2 turnaround- Successfully completed 2006 Polyethylene-2 turnaround- Successfully completed with high degree of accuracy 2005 Ethylene-2 Debottlenecking and Turnaround- Support 2004 Glycol-1 turnaround- Successfully completed October 2001 Ethylene-1 & Polyethylene-1 turnaround- Support 2000 Glycol-1 turnaround- Major accomplishment: 1) Developed a turnaround worklist management system using the power of Microsoft Access VBA programming capabilities. 2) Created standard procedures for turnaround preparation- Best practices recognized: 1) WILAR (Work Item Look Ahead Report) Worklist Application & 2) Use of 3D Visualization for Turnaround and Shutdown- Accept worklist from operations and other department involved on turnaround i.e. Maintenance Department, Project Engineering, and Process Engineering. Manage, maintain & update the worklist and track the status of individual worklist item.- Conduct monthly / bi-monthly turnaround coordination meeting to discuss status and potential problems that may occur during the turnaround- Use SAP for WBS, materials and services for cost allocation for cost control monitoring- Use widely SmartPlant to search for detailed drawings and specifications for reference- Take-off stock material requirement and reserve material available on the warehouse through SAP system. Create material numbers for non-stock materials and reserve through SAP.- Create turnaround master schedule with manpower & equipment loading and critical path defined, using Primavera P6- Prepare and arrange a place for materials needed for turnaround i.e. 40 feet- container, complete with bin location for easy identification of materials- Create high level reporting (Look Ahead Report, Progress Curve, Critical Path Analysis, Delay Analysis, Equipment Loading etc.)
  • Ep Engineering Sdn. Bhd.
    Planning/Cost Engineer
    Ep Engineering Sdn. Bhd. Feb 1997 - Oct 1997
    Kuala Lumpur, Malaysia
    - Involved in the construction of infrastructure works for Kuala Lumpur International Airport (KLIA)- Responsible for overall planning, coordination and controlling of all infrastructure utilities i.e. LV/HV line, telecom line, water line, chilled water line, control building etc.- Responsible for the maintenance of CPM schedules.- Used the following software’s: Primavera Project Management, Suretrack- Coordinate with subcontractors, regarding schedule and resources and other factors affecting the schedule of the project.- Prepare weekly and monthly report- Analyze schedule on potential delay and seriousness of delay.- Recommend corrective action
  • Fieldworks Engineering Snd. Bhd.
    Planning Engineer
    Fieldworks Engineering Snd. Bhd. Sep 1996 - Jan 1997
    Kuala Lumpur, Malaysia
    - Involved in the construction of Pipe Compounding project for Polyethylene (Malaysia) Sdn. Bhd.- Responsible for the preparation and maintenance of CPM schedules.- Used the following software’s: Primavera Project Management, MS Excel- Furnished required dates for delivery of major equipment’s and materials.- Coordinate with sub-contractors regarding schedule, progress and manpower.- Prepare weekly and monthly reports.
  • Knm Process Equipment Inc.
    Department Head (Planning And Cost Control)
    Knm Process Equipment Inc. Oct 1993 - Aug 1996
    Kuala Lumpur, Malaysia
    - Major accomplishment: Developed the cost center and cost coding system of the company.- On January 1994 position was promoted from Planning Engineer to Head of department- Company is involved in construction and fabrication of major component for on-shore & off-shore facilities for Refinery & Petrochemical plant throughout Malaysia and overseas.- Engages in major projects in Oil and Gas and Petrochemical industries for the companies like Shell, Petronas, EPMI, Polyethylene (M) Sdn. Bhd.- Used the following software’s for planning and controlling Primavera Project Planner, MS Project, MS Excel and Visual FoxPro.- Handled multiple projects.- Supervise and coordinate the works of Planning Engineer and cost engineers under the department.- Provide organized and efficient means of measuring, collecting and quantifying to reflect the progress of work.- Provide standard against which to measure progress and status i.e. CPM schedules, control budgets and procurement schedule.- Define and supervise the cost coding system- Prepare reports for top management level – Weekly and monthly reports, Manpower Efficiency Report, Cash flow.- Analyze schedule and report the seriousness of delay to the top management.- Recommend corrective actions.- Manpower tracking for availability to other projects.
  • Chiyoda Corporation
    Cost And Scheduling Engineer
    Chiyoda Corporation Dec 1991 - Jul 1993
    Jubail, Saudi Arabia
    - Engage in the construction of Eastern Petrochemical Plant (SHARQ) expansion.- Used the following software’s: Fast Track, Excel, FoxPro, CNSS- Control and monitor the project status & cost.- Special cost studies and value engineering.- Update weekly status of schedule and cost.- Prepare monthly report i.e. Monthly cost trend curves, Cash flow, CPM schedule status.
  • Dee Construction Corp.
    Cost Engineer
    Dee Construction Corp. Mar 1989 - Nov 1991
    Manila, National Capital Region, Philippines
    - Engaged in the construction of high rise structures in the Philippines.- Used the following software’s: Harvard Project Management, Lotus 123, dBase III.- Monitor and track cost incurred on the project.- Coordinate with accounting and procurement department in tracking actual cost of the project.- Prepare cost report for top management level.- Create cost forecast and cash flow.- Cost study and value engineering.
  • A.C. Cruz Construction
    Project Engineer
    A.C. Cruz Construction Dec 1987 - Feb 1989
    Makati, National Capital Region, Philippines
    - Engage in infrastructure projects, land development, and mass housing.- Responsible for the implementation and supervision of the project.- Monitor and evaluate activities performed with respect to scope of works and specifications.- Document inspections, work changes, modifications, warranties, payment analysis and all activities associated with the projects.
  • Ardie Builders Corp.
    Estimator
    Ardie Builders Corp. Jun 1986 - Nov 1987
    Makati, National Capital Region, Philippines
    - Fresh graduate- Quantity take-off and unit cost derivation.- Negotiate with specialty contractors to obtain their bid proposal- Attend bidding, pre-bidding conferences and ocular site inspection.- Discuss with chief estimator the probable and most competitive bid proposal.

Rhey Naval Skills

Primavera P6 Sap R/3 Autocad Programming Vba Primavera Plant Maintenance Petrochemical Oil And Gas Project Planning Engineering Project Management Microsoft Project Petroleum Construction Epc Cost Control Project Engineering Refinery Microsoft Office Maintenance Management

Rhey Naval Education Details

Frequently Asked Questions about Rhey Naval

What company does Rhey Naval work for?

Rhey Naval works for Nippon Signal Co. Ltd.

What is Rhey Naval's role at the current company?

Rhey Naval's current role is Schedule Controller cum Civil Works Interface Engineer.

What is Rhey Naval's email address?

Rhey Naval's email address is is****@****hoo.com

What schools did Rhey Naval attend?

Rhey Naval attended Technological Institute Of The Philippines.

What skills is Rhey Naval known for?

Rhey Naval has skills like Primavera P6, Sap R/3, Autocad, Programming Vba, Primavera, Plant Maintenance, Petrochemical, Oil And Gas, Project Planning, Engineering, Project Management, Microsoft Project.

Not the Rhey Naval you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.