Richard K. Cooper, P.E. Email and Phone Number
Richard K. Cooper, P.E. is a Northern States Power Company at Northern States Power Company. He is proficient in Japanese.
-
Northern States Power CompanyNorthern States Power CompanyCottage Grove, Mn, Us -
President & Chief EngineerCooper Engineering Inc. "Engineering, Project Management, Field Services" Sep 2001 - PresentProvide Project Engineering, Management, Field and QA services for review, repairs and modifications to plants, equipment and facilities including analysis, design, construction, fabrication, installation, licensing, procurement, testing and vendor interfaces.1. 12/2023-2/2022,Senior ME, Conduct design, evaluations, verifications, information requests, audits, procedure and proposal reviews & maintenance support for GEH on the Terra Power Natrium ARDP SFR.2. 2016-2017, PPM Baffle Bolt Repair contingency at Sequoyah Nuclear Plant, TVA/Demark.3. 2015-2016, PQE for fabrication oversight of ISFSI DSC's (37PTH & 61BTH) fabrication at Premier Technology Inc. (PTI) in Blackfoot ID, AREVA TN/System One.4. 2012-2014, PAFR (QA/ME) for ISFSI TN40 Cask & 61BTH DSC fabrication in Japan & South Korea for XCEL Energy. 5. 2011-2012, PM/PE for RV Head Replacement installation planning on Unit 1, Angra Brazil, WSI & MHI.6. 2011, DPM for RV Head Replacement, San Onofre, Volt/SCE.7. 2010, PE/DE for 147M RV Head Replace Unit 1 install, DCPP, Demark/PG&E.8. 2009-2010, PE/DE for Cask Load Pit Leak Chase upgrade design, PVNGS, APS/Stevenson & Assoc.9. 2007-2009, PM/PE for $4.2M Coal Crusher/Belt Feeder/Motor upgrade, building mods, piping, cranes, platform & Hydro-Laser additions at AS King for XCEL Energy.10. 2007, PE/DE for Unit 2 Pzr Surge Line Alloy 600 overlay licensing & design, PINGP, NMC/ XCEL Energy.11. 2006-2007, PE/DE for Turbine mechanical EHC digital upgrade, PINGP, NMC/XCEL Energy.12. 2006-2007, DE for MUR LEFM FW system piping & component analysis review, PINGP, NMC/XCEL Energy.13. 2004-2007, PE/DE for $40M RV Head Replacement & Head Assembly Upgrade Package Modifications, PINGP, NMC/XCEL Energy.14. PE/DE for ZE pipe replacement and Powell gate valve degradation studies at PINGP for XCEL Energy. 15. 2001-2004, PE/DE for $9M ZX piping replacement (materials upgrades, filter system addition, chem injection upgrade, PINGP, NMC/XCEL Energy.
-
Principal Division Engineer3M Jan 2019 - Feb 2022Maplewood, Minnesota, United StatesPRINCIPAL DIVISION ENGINEER, 3M Advanced Materials Division, Maplewood MN.Provide project management and project engineering services for facility and equipment upgrades at 3M plants in California, Georgia, New Hampshire and Oklahoma. • $5.5M Building Furnace Pit, Bridge Crane, Cooling Tower, Furnace Vessels/Internals, Specialty Grinders, Centrifuges, Furnace and CT controls additions. • $2.6M Specialty Grinders and CMM addition. • $2M Specialty Grinders, Jib Crane and Kiln addition. • $1.3M Molding and Kitting Stations upgrades, Hydraulic Press upgrades, and Chiller addition. • $1M Induction heating coils, power supplies and cooling system upgrades. • $600K Wastewater System, Permit Monitoring Station, chrome removal and pH adjustment skids addition including instrumentation and controls. -
Senior Consulting EngineerStructural Integrity Associates Dec 2000 - Jul 2001Provide engineering, consulting, and marketing services to utilities for maintenance and modification to power plant equipment.Major Projects List:1. 2001, Watts Bar, Fatigue Pro development field and office in conjunction with Dave Gerber.2. 2001, Palisades, CEDM cracking field support with Dick Smith.3. 2001, H. B. Robinson, CRDM canopy seal weld leak field design & repair assistance. 4. 2001, Diablo Canyon, CRDM canopy seal weld leak office design assistance. -
Lead & Principle Mechanical System EngineerXcel Energy Apr 1999 - Jun 2000Prairie Island Nuclear Generating Plant (Pingp), Welch MnProvide leadership to plant engineers concurrent with system engineer responsibility for Reactor Vessel/Internals and Reactor Coolant Gas Vent systems, industry issues (BFB, Alloy 600) and projects. • Acting Program Engineering Manager to develop and coordinate engineering programs under the NMC.• Review engineering documents for technical adequacy, administrative control compliance and consistency.• Mentor engineers on equipment repair and modifications, codes and standards, maintenance and operations interface, and administrative processes.• WOG materials and PWROG materials committee member. -
Principal Mechanical System EngineerNorthern States Power Company May 1993 - Mar 1999Prairie Island Nuclear Generating Plant (Pingp), Welch MnSystem Engineering responsibility (Point Of Contact/Subject Matter Expert) for Condensate, Containment Spray, Cooling Water, Feedwater, Heater Drain, Hypobromous Acid, Reactor Coolant Gas Vent, Reactor Vessel and Internals systems.• Resolve equipment malfunctions and provide operations and maintenance system/equipment SME support.• Identify and perform equipment modifications for performance, reliability and safety improvements.• System corrective/preventive maintenance, operations and test work order procedure writing and review.• Manage Reactor Vessel industry issues on Alloy 600 and internals baffle former bolt degradation.• WOG materials and PWROG materials committee member.Experience includes; ASME Boiler & Pressure Vessel Code, B31.1 Power Piping Code, various industry codes and standards, equipment maintenance/repair/modifications, materials engineering, rotating machinery diagnostics, tribology, welding, systems/equipment design and analysis.
-
Senior Quality Assurance EngineerNorthern States Power Company Dec 1989 - Apr 1993Prairie Island Nuclear Generating Plant (Pingp), Welch MnVerify plant, projects and supplier QA Program compliance using surveillance, in-line reviews and audits.AUDITS:1998, Stone & Webster A/E Nupic Technical Participant, Boston MA1992, Nutech A/E, Maple Grove MN1990, Fluor Daniel A/E, Chicago IL1990, Gasser Services, Olney MR1990, WNP-3, ASME Code Survey, Elma WA
-
Project EngineerNorthern Pump Company Jun 1988 - Dec 1989$1M Technical, management and financial responsibility for navy nuclear pump and valve manufacturing projects.
-
Mechanical Test EngineerNewport News Shipbuilding Aug 1985 - May 1988Direct construction testing and operation of power plant systems on 688 Class Nuclear Submarines (USS Chicago SSN-721, USS Keywest SSN-722, USS Oklahoma City SSN-723, USS Newport News SSN-750 & USS Albany SSN-753). • Hot functional and initial criticality testing on the Oklahoma City. • Sea trials testing on the Oklahoma City.
Richard K. Cooper, P.E. Education Details
-
Bachelor Of Mechanical Engineering
Frequently Asked Questions about Richard K. Cooper, P.E.
What company does Richard K. Cooper, P.E. work for?
Richard K. Cooper, P.E. works for Northern States Power Company
What is Richard K. Cooper, P.E.'s role at the current company?
Richard K. Cooper, P.E.'s current role is Northern States Power Company.
What schools did Richard K. Cooper, P.E. attend?
Richard K. Cooper, P.E. attended University Of Minnesota-Twin Cities.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial