Sr. Controls Engineer, Project Duration Group
Assisted with checkout and startup at the Tesla Gigafactory in Sparks, NV and the Tesla Assembly Plant in Fremont, CA.
Please complete the CAPTCHA to continue
@emerson.com
✓
LinkedIn matched
A concise factual answer block for searchers comparing this professional profile.
Rick Lauer is listed as Retired based in Nolensville, Tennessee, United States. AeroLeads shows a work email signal at emerson.com and a matched LinkedIn profile for Rick Lauer.
Rick Lauer previously worked as Sr. Controls Engineer, Project Duration Group at Barry-Wehmiller Design Group and PAS Senior Engineer, Process Systems and Solutions at Emerson Process Management. Rick Lauer holds Bsee, Electrical Engineering from University Of Cincinnati.
This section adds company-level context without repeating Rick Lauer's masked contact details.
AeroLeads found 1 current-domain work email signal for Rick Lauer. Compare company email patterns before reaching out.
Experienced in industrial PLC and DCS control system automation design and project team leadership in a wide variety of industries. Results oriented, and delivers consistent results while developing collaborative relationships among all concerned parties.
Listed skills include Foundation Fieldbus, Project Engineering, Fieldbus, Modbus, and 14 others.
A career timeline built from the work history available for this profile.
Sacramento, California, United States
Assisted with checkout and startup at the Tesla Gigafactory in Sparks, NV and the Tesla Assembly Plant in Fremont, CA.
St. Louis, Missouri
DeltaV control and Operator Interface configuration and testing for continuous and batch processesSystem startup/troubleshooting and "on the job" training for OperatorsAssist customers with scope definition and documentationDevelop standards documentation for control module applicationsCoordinate and review documentation exchange between Emerson and.
St. Louis, MO
Developed design for PLC and Operator interface, conveyor system layout and training for several corporationsDetermined solution for a communications problem among several PLCs and a DCS at a major chemical facilityY2K analysis of all processors at an automotive assembly facility to evaluate the need for upgrades
St. Louis, MO
Led logic development, PLC programming and checkout/startup for control system upgrades at two major consumer products companiesConducted classroom training on upgraded PLC models for customer maintenance personnelProvided control system definition and flow chart documentation for automation of a dairy product companyCoordinated electrical design of Class.
St. Louis, MO
Electrical design, development of bid packages, system programming, checkout, startup, performance tuning and training for high speed packaging lines and support equipmentLead electrical engineer for a new bottle line and can lineStartup team member for other lines, supporting their lead engineersEngineered control redesign to expand and improve.
Columbus, OH
Responsible for various projects to support production and facilitiesConsultation with an explosions expert and implementing the recommendationsOverseeing the design and construction of new facilities for the Engineering Department and a Maintenance Department expansionControl system modifications and troubleshootingProcess piping modificationsResponsible.
St. Louis, MO
Member of the construction, checkout and startup team for a Brewhouse expansion at the Tampa, FL facilityLed electrical design, checkout and startup of various projects at the Jacksonville, FL facility:- a new incoming water treatment facility- addition of new equipment and separation of controls systems in the Brewhouse to eliminate sharing and improve.
Havre De Grace, MD
Startup and operation of a new facility for the production of the first plastic soft drink bottleDeveloped the PM program for process utilitiesDesigned control modifications and assisted with troubleshootingRedefined the Division's spare parts code and organized the plant's spare parts facility
Crescent Springs, KY
Designed equipment panel layouts for high-speed packaging machinesWrote/edited equipment manualsDeveloped schematics and parts listsInstalled conduit and wiring for controls and 240/480v motors
Quick answers generated from the profile data available on this page.
Rick Lauer is listed as Retired.
AeroLeads has found 1 work email signal at @emerson.com for Rick Lauer.
Rick Lauer is based in Nolensville, Tennessee, United States.
Rick Lauer has worked for Barry-Wehmiller Design Group, Emerson Process Management, Applied Technologies, Pc&E, Inc., and Anheuser-Busch Companies, Inc..
You can use AeroLeads to view verified contact signals for Rick Lauer, including work email, phone, and LinkedIn data when available.
Rick Lauer holds Bsee, Electrical Engineering from University Of Cincinnati.
Rick Lauer is listed with skills including Foundation Fieldbus, Project Engineering, Fieldbus, Modbus, Emerson Deltav, Process Control, Process Automation, and Instrumentation.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial Search contactsCheck these profiles if this is not the Rick Lauer you were looking for.