Risnaldi Aldi

Risnaldi Aldi Email and Phone Number

Power Plant Superintendent at PT. Pacific Indopalm Industries @
Risnaldi Aldi's Location
Indonesia, Indonesia
Risnaldi Aldi's Contact Details

Risnaldi Aldi personal email

About Risnaldi Aldi

• Knowledge in troubleshooting operation and maintenance in power plant.

Risnaldi Aldi's Current Company Details
PT. Pacific Indopalm Industries

Pt. Pacific Indopalm Industries

Power Plant Superintendent at PT. Pacific Indopalm Industries
Risnaldi Aldi Work Experience Details
  • Pt. Pacific Indopalm Industries
    Power Plant Superintendent
    Pt. Pacific Indopalm Industries Apr 2014 - Present
    Dumai
    Responsible to Operation & Maintenance of Power Plant : Boiler, Turbine, WTP and WWTP, Production, trouble shooting, fuel preparation, reduce production cost, improvement
  • Ikpp
    Power Plant
    Ikpp Oct 1999 - Mar 2014
    Perawang, Riau, Indonesia
    From October l999 until march 2014 joined with PT. Indah Kiat Pulp and Paper Tbk Perawang Mill. During that time I have experiences:Join in Boiler Project Team (400t/h steam, 125 Bar, and 540oC Kvaerner CFB Boiler 1 x 90 MW)•Quality Control in Refractory and Metal Spray•Design and Preparation DCS Drawing to CFB boiler•Final check equipment and system (water and steam, fuel feeding, combution air, auxiliary )Commissioning Team of CFB boiler (400t/h steam, 125 Bar, and 540oC… Show more From October l999 until march 2014 joined with PT. Indah Kiat Pulp and Paper Tbk Perawang Mill. During that time I have experiences:Join in Boiler Project Team (400t/h steam, 125 Bar, and 540oC Kvaerner CFB Boiler 1 x 90 MW)•Quality Control in Refractory and Metal Spray•Design and Preparation DCS Drawing to CFB boiler•Final check equipment and system (water and steam, fuel feeding, combution air, auxiliary )Commissioning Team of CFB boiler (400t/h steam, 125 Bar, and 540oC Kvaerner CFB Boiler)• Instrument and Electric System (Signal test and Loop test)• Process Logic Control and Interlocking System• Preparation WI for operation including start and stop boiler 01 July 2004 – 09 October 2004 : Join in CFB Boiler project Team in Hainan, China at Jinhai Pulp & Paper Co.Ltd•Final check equipment and system (water and steam, fuel feeding, combution air, auxiliary )•Comissioning and performance test June 2006 – 2008 Project and Comissioning team in Jianxi CFB boiler capacity 1 x 150 MW•Final check equipment and system (water and steam, fuel feeding, combution air, auxiliary system)• Comissioning and performance test 2008 - 2011Supervisor Shift of Power Boiler , Power Plant Department• Supervisor operation and maintenance two boiler (670 t/h CFB Jianxi Boiler 1x150MW and 400 t/h Kvaerner CFB Boiler 400 1x90MW)• SOP and Trouble shooting• Start/stop boiler• Fuel handling system (from stock pile coal yard-crusher-coal storage-boiler )  2012 - PresentVice Section Head in Power Boiler 3 Section, Power Boiler Department•Control and monitoring and troubleshooting operation and maintenance in power boiler section (CFB boiler 1 x 90MW and 3 x 150 MW, bark handling system and coal handling system)•MBOS (Management By Olympic System) team leader in PB-3 Section•TPM (Total Productive Management) core team •Effeciency and unit cost Control•OSH leaderBesides that, 2010 - presentTrainer in PT Katiga Madina Persada (staff AK3PUBT) Show less
  • Ikpp
    Vice Section Head In Power Boiler Section 3X150Mw And 1X90Mw
    Ikpp Oct 1999 - Mar 2014
    Perawang ,Riau
    •Control and monitoring and troubleshooting operation and maintenance in power boiler section (CFB boiler 1 x 90MW and 3 x 150 MW,- Control and monitoring operation and maintenance bark handling system - Control and monitoring operation and maintenance coal handling system•MBOS (Management By Olympic System) team leader in PB-3 Section•TPM (Total Productive Management) core team •Effeciency and unit cost Control• OSH leader

Risnaldi Aldi Skills

Commissioning Boilers Project Engineering Power Plants Steam Coal Dcs Engineering Factory Maintenance Maintenance Management Petroleum Plant Maintenance Power Generation

Risnaldi Aldi Education Details

Frequently Asked Questions about Risnaldi Aldi

What company does Risnaldi Aldi work for?

Risnaldi Aldi works for Pt. Pacific Indopalm Industries

What is Risnaldi Aldi's role at the current company?

Risnaldi Aldi's current role is Power Plant Superintendent at PT. Pacific Indopalm Industries.

What is Risnaldi Aldi's email address?

Risnaldi Aldi's email address is ri****@****ail.com

What schools did Risnaldi Aldi attend?

Risnaldi Aldi attended Universitas Andalas.

What skills is Risnaldi Aldi known for?

Risnaldi Aldi has skills like Commissioning, Boilers, Project Engineering, Power Plants, Steam, Coal, Dcs, Engineering, Factory, Maintenance, Maintenance Management, Petroleum.

Not the Risnaldi Aldi you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.