Electrical Design Engineer
- Client: Ontario Power Generation Project: Heavy Water Management System (HWMS) Computers UPS Replacement, Darlington Nuclear Generating Station
- Developed technical justification (NICR Justification forms), associated procurement and cybersecurity screening forms, and conducted OPEX review of UPS Replacement project.
- Prepared the design of replacement UPS, including procedure (CMP), training manuals (INS), Operation Manuals (MAN), and drawing (Change Papers) following… Show more Client: Ontario Power Generation Project: Heavy Water.
- Prepared the design of replacement UPS, including procedure (CMP), training manuals (INS), Operation Manuals (MAN), and drawing (Change Papers) following OPG's ECC process.
- Prepared EC package including technical justification (NICR Justification form) and interfaced with regulators and stakeholders (Operation & Control Maintenance) on technical matters. Show less