Project Manager
Burnsville, Minnesota, Us
Managed our team constructing 22 miles of rail for Metro-link and the Riverside County Transportation Commission. The Perris Valley Line project consists of track civil work, rail, subballast, ballast install, layover/storage yard, underground utilities for drainage, station and facility aspects, roadway crossing drainage, railway signaling and communications, signal switching mechanisms, multiple at grade street crossings, passenger stations, and all site work associated with public passenger station to accommodate the public parking and public bus system.Managed our successful CMAR project with Orange County for the San Juan Creek Levee protection project consisting of near one and a half miles of sheet pile wall and pipe pile auxiliary system. The County opted to utilize a marine grade steel for all sheet pile elements and stainless steel cabling and bolts. The project had tight working constraints requiring good site logistics. Continued on to complete our I-15 Caltrans project in Victorville. We had a successful completion of this $83M multiple bridge widen, new bridge construction, sound wall installation, mainline pavement, new frontage road construction, major drainage improvements, new ramp alignment construction, bridge seismic retrofit, and associated roadway electrical and landscaping. Ames has a long withstanding history of work at differing mines sites. Our CA team continued into the Rio Tinto Boron operations. Managed the construction of the Boric Acid Pond 8A that consisted of 500,000 CY of embankment, 2M SF of a 4-layer HDPE liner system, over 8,000 LF of fused HDPE piping, and near 500,000 CY of ore and waste hauling from the footprint of the new pond.