Engineer
London, United Kingdom
Worked as a graduate Civil Engineer (2010-2011 @ Milton Court) Working full time on one of Sir Robert McAlpines flag ship projects (Milton Court- £180m, 36 story, high end residential development combined with a school of music and drama) Roles and responsibilities: • Working in the “Concrete Team” managing the sub-structure and concrete frame from Basement to level 6. • Oversaw various construction methods including posttension slabs, a slip form core, metal deck composite concrete slabs, in-situ concrete slabs and columns, and pre-cast concrete slabs. Worked as a Civil Engineer / Section Manager (2012-2013 @ Milton Court) Package Management: • Managed the screed package (£350k) and builderswork package (£200k) from start to finish on the project. • Managed the Structural Steel package (£6m) – this included the construction of several complex steel frame structures. Section management: • Section managed the Concert Hall at Milton Court (Value approximately £14m), acoustically isolated performance space which seats over 750 people.• Section managed the Drama Theatre at Milton Court (approximate value £4m), 4 tier performance space to seat up to 300 people. Worked as a Civil Engineer/Section Manager (2013-Present @ Fitzroy Place) Working full time on one of Sir Robert McAlpines flag ship projects (Fitzroy place- £350m mixed use development including 3no. high end residential blocks 2no. office Blocks and numerous retail spaces) Roles and responsibilities: • Blockwork package manager (Site Wide) • Fire Stopping Package manager (Site Wide) • Managed the façade construction of one of the residential blocks. (Brick façade, which incorporated complex balcony and glazing details) • Simultaneously section managed – Basement (responsible for complex M and E co-ordination in the plant rooms), 2 Office Reception Areas (high end bespoke fit –out) and the Office Block Stair Cores