AeroLeads people directory · profile

Rob Dickson Email & Phone Number

DPD Construction Superintendent at Santos Ltd
Location: Greater Darwin Area, Australia 11 work roles 1 school
1 work email found @ymail.com LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email r****@ymail.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
DPD Construction Superintendent
Location
Greater Darwin Area, Australia
Company size

Who is Rob Dickson? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Rob Dickson is listed as DPD Construction Superintendent at Santos Ltd, a with 3265 employees, based in Greater Darwin Area, Australia. AeroLeads shows a work email signal at ymail.com and a matched LinkedIn profile for Rob Dickson.

Rob Dickson previously worked as DPD Onshore Construction Superintendent at Santos Ltd and Darwin Life Extension Mechanical Planner (Secondment to Santos) at Kaefer Integrated Services Pty Ltd. Rob Dickson holds High School from Ignatius Park College.

Company email context

Email format at Santos Ltd

This section adds company-level context without repeating Rob Dickson's masked contact details.

{first}{last}@ymail.com
86% confidence

AeroLeads found 1 current-domain work email signal for Rob Dickson. Compare company email patterns before reaching out.

Profile bio

About Rob Dickson

Significant experience in leadership roles for project delivery, mechanical planning, & maintenance execution within the resource & energy sector, with particular focus on hydrocarbons and other major hazardous facilities.Previous roles have seen me working for the Owner’s team, EPCM, and contractor constructor. This experience has given me a high level of contract management knowledge, ability to openly communicate, understanding how to interface between project, maintenance, and operations teams to achieve goals cost effectively and safely.My key competencies are as follows.Supporting managers in the development and management of execution activities of the Project contract with a strong focus on HSE, quality and efficient performance.The ability to consult widely and embed processes, culture and behaviours that are conducive to safety, efficiency, and cost.Supporting tender process for engaging Construction contractor to deliver the Project Actively collaborating and engaging with the stakeholder groups to ensure fit for purpose scope definition and construction planningProviding input to the Engineering Design focusing on constructability and execution through past technical experienceManaging the key interface between engineering contractor and construction contractor through transition from engineering to implementationSupporting the development of execution management plans, schedules and SIMOPs reviewsManaging operations and execution interfaces with other major scope packages to ensure efficient and safe execution of the workProficient in technical writing, planning, & execution of SMP scopes.Demonstrated experience in Computerized Maintenance Management Systems (SAP)Competent in permit to work systems & isolation philosophies

Listed skills include Msic, Dogger'S Ticket, Forklift Operator, Non Slew Crane Operator, and 40 others.

Current workplace

Rob Dickson's current company

Company context helps verify the profile and gives searchers a useful next step.

Santos Ltd
Santos Ltd
DPD Construction Superintendent
adelaide, south australia, australia
Website
Employees
3265
AeroLeads page
11 roles

Rob Dickson work experience

A career timeline built from the work history available for this profile.

Dpd Onshore Construction Superintendent

Current

Darwin, Northern Territory, Australia

The Darwin Pipeline Duplication (DPD) Project will extend the Barossa Gas Export Pipeline to the Santos-operated Darwin LNG (DLNG) facility. This allows for the repurposing of the existing Bayu-Undan to Darwin pipeline, to facilitate carbon capture and storage (CCS) options.My role is to assist in developing strategy and documentation to support the execution of the project and leading development of DPD contract and tender evaluation. Based at Wickham Point, I am the facility focal… Show more The Darwin Pipeline Duplication (DPD) Project will extend the Barossa Gas Export Pipeline to the Santos-operated Darwin LNG (DLNG) facility. This allows for the repurposing of the existing Bayu-Undan to Darwin pipeline, to facilitate carbon capture and storage (CCS) options.My role is to assist in developing strategy and documentation to support the execution of the project and leading development of DPD contract and tender evaluation. Based at Wickham Point, I am the facility focal point for site delivery of the DPD project through execution phase. Show less

Jul 2023 - Present

Darwin Life Extension Mechanical Planner (Secondment To Santos)

Darwin, Northern Territory, Australia

Scope of Work – The Darwin LNG plant (DLNG) is a single train liquefaction and storage facility located at Wickham Point on Darwin Harbour, Northern Territory, Australia. DLNG is currently receiving gas from the Bayu-Undan field in the Timor Sea and converts it into LNG. DLNG was commissioned in 2006 and has a design life to 2027. Bayu-Undan produced its first gas in 2004 and is now approaching end of field life.Barossa is an offshore gas and light condensate project 300 kilometres north of… Show more Scope of Work – The Darwin LNG plant (DLNG) is a single train liquefaction and storage facility located at Wickham Point on Darwin Harbour, Northern Territory, Australia. DLNG is currently receiving gas from the Bayu-Undan field in the Timor Sea and converts it into LNG. DLNG was commissioned in 2006 and has a design life to 2027. Bayu-Undan produced its first gas in 2004 and is now approaching end of field life.Barossa is an offshore gas and light condensate project 300 kilometres north of Darwin and will provide a new source of gas to the DLNG facility once supply from Bayu-Undan has been exhausted. The DLNG Life Extension Project (the Project) seeks to utilise the shutdown window created by Bayu-Undan end of life to prepare the DLNG facility for backfill from the Barossa field, by undertaking several brownfield work packages.Planning of all mechanical work for the Preservation shutdownCollate and prepare scope required to develop detailed work packs for the preservation of DLNG facility.Review and prepare maintenance work list which require inclusion in shutdown for safe execution.Play active role in scope management and optimizationIdentify and reserve materials and spare parts from warehouse for timely work order executionEnsure that all project gating and readiness requirements are met, and adequate monitoring is in place throughout the preparation, planning, gating, execution and close out processes.Assist the Shutdown Superintendent and scheduler in identifying the resource requirements to safely deliver shutdown program.Contribute towards shutdown budget control for all plant shutdown maintenance work.Support the development, review and implementation of shutdown procedures, instructions, and standards to improve the work quality and avoid rework.Engage with shutdown team to identify and mitigate risksCoordination of work groups during shutdown execution Show less

Aug 2022 - Jul 2023

Fabrication Coordinator & Estimator

Australia

Scope of Work – KAEFER Integrated Services Workshop Facilities are based at East Arm Industrial Precinct in Darwin. Capability of our Darwin Operations include Offsite Fabrication, Onsite Mechanical Services, Insulation & Cladding Fabrication, Surface Treatment, Rope Access, and Scaffold Access Systems Estimation and Quotation of Onshore & Offshore Structural & Piping Fabrication PackagesClient Focal Point for Fabrication Package DeliveryProcurement of Materials &… Show more Scope of Work – KAEFER Integrated Services Workshop Facilities are based at East Arm Industrial Precinct in Darwin. Capability of our Darwin Operations include Offsite Fabrication, Onsite Mechanical Services, Insulation & Cladding Fabrication, Surface Treatment, Rope Access, and Scaffold Access Systems Estimation and Quotation of Onshore & Offshore Structural & Piping Fabrication PackagesClient Focal Point for Fabrication Package DeliveryProcurement of Materials & ConsumablesCreate Schedules for fabrication and project works using Primavera P6Cost control of workshop fabrication scopes Daily Reporting of Fabrication Works Show less

Mar 2021 - Aug 2022

Senior Implementation Specialist - Mechanical (Secondment To Conocophillips)

Darwin, Australia

Scope of Work – The DLNG Facility is operated by ConocoPhillips who is the majority interest holder and operator of the Bayu-Undan facility, the pipeline and the Darwin LNG plant. Other coventurers are Santos, INPEX, Eni, Tokyo Electric and Tokyo Gas.Gas is sent via a 502 kilometre pipeline from the Bayu-Undan field to the plant at Wickham Point, where it is converted into Liquefied Natural Gas for sale to Tokyo Electric and Tokyo Gas in Japan.The facility employs state-of-the-art… Show more Scope of Work – The DLNG Facility is operated by ConocoPhillips who is the majority interest holder and operator of the Bayu-Undan facility, the pipeline and the Darwin LNG plant. Other coventurers are Santos, INPEX, Eni, Tokyo Electric and Tokyo Gas.Gas is sent via a 502 kilometre pipeline from the Bayu-Undan field to the plant at Wickham Point, where it is converted into Liquefied Natural Gas for sale to Tokyo Electric and Tokyo Gas in Japan.The facility employs state-of-the-art engineering and environmental technology and, wherever possible, local and regional resources. The plant uses ConocoPhillips’ Optimised Cascade Process® an LNG liquefaction technology that employs a two-trains-in-one-design for increased reliability and flexibility..Create and prepare detailed work packs & work instructions by use of technical writing Execute modification projects from detailed designs managing multi-discipline teams and contractorsExecute major and minor maintenance campaigns including site wide outages and shutdownsPrepare estimates of man hours required to scope out and write field instructions for specific scopesAttend and contribute to scope kick off meetings, HAZIDs, and contractor alignment meetingsFamiliarise with all construction drawings, specifications, project specific procedures and international standardsCompile field documents and facilitate their approval, inclusive of validation and updates to existing maintenance proceduresCreate Work Orders in SAP and populate Work Order with manning resources, components requirements, and specialist equipmentInitiate ISSOW permit requests and facility permit readiness with operationsAssess materials ordered against existing Work Orders for accuracy and availability Show less

Nov 2016 - Feb 2021

Mechanical Package Supervisor (Offsite & Utilities)

Ichthys Lng Project, Darwin Nt

Scope of Work – The Ichthys LNG Project is a Joint Venture between INPEX group companies (the Operator), major partner Total and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas.Gas from the Ichthys Field, in the Browse Basin offshore Western Australia, will undergo preliminary processing offshore to remove water and raw liquids, including condensate. The gas will then be exported to the onshore processing facilities in Darwin via an 889km… Show more Scope of Work – The Ichthys LNG Project is a Joint Venture between INPEX group companies (the Operator), major partner Total and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas.Gas from the Ichthys Field, in the Browse Basin offshore Western Australia, will undergo preliminary processing offshore to remove water and raw liquids, including condensate. The gas will then be exported to the onshore processing facilities in Darwin via an 889km pipelineJKC Australia LNG is a joint venture consisting of JGC, KBR, and Chiyoda Oceania. JKC is directly responsible for the engineering and construction delivery of the Ichthys LNG Project in Darwin.Supervise subcontractor’s packaged equipment (including both rotating and static) installation and preservation work, including Fire Water, Instrument Air, Nitrogen, Sewage, DAF, and Flare PackagesFamiliarise with all construction drawings, specifications, project specific procedures and international standardsRegularly monitor status of construction drawings, specifications, procedures and take necessary action if any delay or issuance or missing items foundRegularly monitor material delivery status and take action if any delay of equipment or missing item is foundMonitor status of construction activities and report progress to discipline managerReview and comment on ITP’s, JHA’s, and schedule prepared by subcontractorReview construction procedure and prepare internal schedule Coordinate daily with the other discipline and subcontractor counterparts for construction mattersAttend daily pre-start meetings, daily group meetings, and weekly construction interface meetings with subcontractor and companySubmit daily reports to managerReview subcontractor JHA’s, Lift Studies, and FTR’s and engineering queries Show less

Jun 2015 - Nov 2016

Senior Smp Supervisor

Eurombah Creek Gpf & Spring Gully Pcif

Scope of Work – Eurombah Creek GPF is a $250 Million contract for APLNG which scope entails the equipment & nominated material supply, fabrication, surface treatement and delivery to site, storage at as site & installation of structural steelwork, mechanical equipment, piping, civil, electrical, pre-commissioning, & performance testing works. The GPF consists of two identical processing trains that have both HP & LP Siemens Gas Compressors, TEG Dehydration Unit, Nitrogen Plant, Plant &… Show more Scope of Work – Eurombah Creek GPF is a $250 Million contract for APLNG which scope entails the equipment & nominated material supply, fabrication, surface treatement and delivery to site, storage at as site & installation of structural steelwork, mechanical equipment, piping, civil, electrical, pre-commissioning, & performance testing works. The GPF consists of two identical processing trains that have both HP & LP Siemens Gas Compressors, TEG Dehydration Unit, Nitrogen Plant, Plant & Instrument Air System, and Horizontal Ground Flare.Supervising and co-coordinating the hydro testing and air desiccant drying of piping systemsQA Sign off with Client on Field Inspection Checklists Direct management of the sub contractor engaged to perform the testing & dryingDirect management of the sub contractor and mechanical trades undertaking the oil flushing of the lubrication oil system of the Siemens compressors in both Trains 1 & 2Supervision of mechanical trades to both support the hydro testing activities as well as perform pre-works required for testingSupervision of mechanical trades & sub-contractor performing lube oil flushing of Siemans compressors in both Trains 1 & 2Re-instatement of piping system, including control valves, flow meters, strainers, ectSupervision of mechanical construction including piping, mechanical equipment, & structural steelWeekly reporting of progress targets to meet contractor and company KPI s (Key Performance Indicators)Implementing and maintaining site and company HSE (Health, Safety and Environment) management plan and procedures Show less

Nov 2014 - Jun 2015

Senior Smp Supervisor

Gladstone, Queensland, Wiggin Island Coal Export Terminal (Wicet Project)

Scope of Work - MMM is a contractor for the construction of the approach 1.8km long Jetty and ship berth associated with stage one of the Wiggins Island Coal Export Terminal (WICET) Project at Gladstone in Queensland. The contract is valued at approximately $330 million and covers the construction of offshore plant and infrastructure with a 1.8km approach jetty and transfer tower platform, wharf, wharf conveyor including the drive and take up tower, berthing and mooring dolphins, ship access… Show more Scope of Work - MMM is a contractor for the construction of the approach 1.8km long Jetty and ship berth associated with stage one of the Wiggins Island Coal Export Terminal (WICET) Project at Gladstone in Queensland. The contract is valued at approximately $330 million and covers the construction of offshore plant and infrastructure with a 1.8km approach jetty and transfer tower platform, wharf, wharf conveyor including the drive and take up tower, berthing and mooring dolphins, ship access platforms, jetty conveyor and transfer tower.Supervising and co-ordinating the fabrication and welding of wharf, jetty, dolphin, and pylons in the onshore construction assembly yard as well as fabrication modifications as per work packs Supervising offshore mechanical construction trades and special class welding teams in marine construction including direct management of subcontract welders and tradesman. Work scope includes welding of wharf and conveyor modules, installation of piping systems and alignment of conveyor galleriesWeld Testing of Boilermakers and Special Class WeldersPlanning & ordering of materials & consumables through offshore barge movementsCo-ordinating NDT & QA/QC InspectionsGenerating daily progress reports for area superintendent as well as co-ordinating the Night Shift Handover from drafting it to allocating assigned work scope direct to management for executionEnsuring compliance of company Safety Management Plan, Project HSE Policy, and company core valuesConducting daily pre-starts to groups of up to 30 employees and HSE Toolboxes weeklyEnsuring compliance and enforcement of client and company Quality Management PlansGenerating Site Engineering Queries for construction activities outside of construction scope contractMentoring and coaching of employees and to align with both the company and client safety policies Show less

May 2013 - Nov 2014

Senior Mechanical Commissioning Supervisor

Pluto Lng, Western Australia

Scope of Work - This contract included major structural, mechanical and piping contract for the Pluto LNG. The Contract consisted of mechanical construction of both the LNG Train and Power Generation Gas Turbine Generator. Commissioning support was also included in the package which included the supervision of all mechanical trades across the whole project including following areas; Train, GTG’s, Fractionation, Liquefaction, PR & MR Compressors. As well as the OBSL including; Heated Water… Show more Scope of Work - This contract included major structural, mechanical and piping contract for the Pluto LNG. The Contract consisted of mechanical construction of both the LNG Train and Power Generation Gas Turbine Generator. Commissioning support was also included in the package which included the supervision of all mechanical trades across the whole project including following areas; Train, GTG’s, Fractionation, Liquefaction, PR & MR Compressors. As well as the OBSL including; Heated Water, MEG, AGRU, Condensate, Nitrogen, Oxygen, Fire Water, Slug Catcher & Load Out JettyMechanical Commissioning of all areas in the Pluto LNG Project to accomplish the final ‘RFU handover’ to Woodside Petroleum. This includes commissioning start up checks and four hour runs of all rotating equipment; pumps, fans, compressors, conveyors etc.Installation and charging of flowserve mechanical seal systems including dry gas seal systems, installation of flexible and fixed coupling shafts and alignments etc.Performing ‘preservation and maintenance’ activities in conjunction with site "Flawless Startup" procedures and protocol and client directionConduct flushing of piping circuits including strainer ‘change outs’, and operational checks of piping and mechanical systems, tightness testing, control valve and PRV removal and installation ect.Co-coordinating piping, structural, and mechanical construction of GE Frame 6 gas turbine generatorsHolding and generating permits under both Foster Wheeler Worley and Woodside’s ISSOW (Integrated Safe System of Work) regulations for permit systems and procedures Conducting ‘final walk down’ of systems with the client and Woodside personnel and executing ‘punchlisting’ for ‘RFU’ handoverFabrication and installation of bypass piping spools for chemical flushing of process systems and process changeMaintenance and breakdown repair work of all rotating equipment and piping systems across project. Including compressors, pumps, and valves. Show less

Jul 2010 - May 2012

Senior Smp Supervisor

Pluto Lng, Western Australia

Scope of Work - Monadelphous’ scope of work consists of module installation, mechanical equipment installation, piping, structural steel erection, testing, pre-commissioning and commissioning assistance for the Mechanical Offsite Utilities and Acid Gas Removal Unit (AGRU) Contract Value $170 Million.Supervising the greenfield construction of the Instrument Air and Nitrogen Utilities PackagesRelief Supervision role covering construction of Fire Water & Demineralised Water… Show more Scope of Work - Monadelphous’ scope of work consists of module installation, mechanical equipment installation, piping, structural steel erection, testing, pre-commissioning and commissioning assistance for the Mechanical Offsite Utilities and Acid Gas Removal Unit (AGRU) Contract Value $170 Million.Supervising the greenfield construction of the Instrument Air and Nitrogen Utilities PackagesRelief Supervision role covering construction of Fire Water & Demineralised Water Packages from stages of initial construction to final ‘handover’ to client Supervising crew of 20 trades including, but not limited to cranes operations, rigging, mechanical, structural, welding, & pipingSupervising installation and erection of structural, mechanical and piping equipment. This includes co-ordinating and managing landing compressors and pumps, structural steel erection, and fabricating and installing stainless and carbon pipe spools including stick built piping runs, and nozzle to piping flange alignmentsMechanical inspecting and signing of Inspection Test Reports of all pipe spooling, static mechanical equipment, structural steel erection, pump nozzle alignment and relief valvesPreparing and planning work scope including contractor interfacing such as painting, scaffolding, electrical, and civil disciplinesWriting and sending site engineering queries with cost effective and practical solutions to the client’s responseWork pack development and implementationWeekly reporting of progress targets to meet contractor and company KPI s (Key Performance Indicators)Implementing and maintaining site and company HSE (Health, Safety and Environment) management plan and proceduresConducting weekly ‘toolbox’ meetings and forwarding relevant suggestions and comments to managementDeveloping JHA's and implementing and monitoring HSE initiativesDeveloping and working under site permitting procedures including isolating and verifying mechanical and process isolation points Show less

Jun 2009 - Jul 2010

Leading Hand Pipe Fitter/Boilermaker

Cape Lambert 80Mtpa Upgrade, Western Australia

Scope of Work - The contract scope included the supply, fabrication and installation of a new reclaim conveyor, surge bin facility, transfer stations and conveyors. Monadelphous carried out modifications to the existing outloading conveyor system to incorporate the new surge bin facility and extended the two existing wharf conveyors and associated pipework to accommodate new wharf extension works. Contract Value $100 MillionSupervising a crew of 15 employees of various… Show more Scope of Work - The contract scope included the supply, fabrication and installation of a new reclaim conveyor, surge bin facility, transfer stations and conveyors. Monadelphous carried out modifications to the existing outloading conveyor system to incorporate the new surge bin facility and extended the two existing wharf conveyors and associated pipework to accommodate new wharf extension works. Contract Value $100 MillionSupervising a crew of 15 employees of various tradesFabricating and supervising construction of both pipe spooling and steel fabrication, associated with installation of surge bins, conveyors, stockpile piping, service water piping, and wharf extension for the Jetty Berth ExpansionSupervising structural steel erection and rigging crewPreparing and planning for ‘night shift’ activities‘Punch listing’ and final completion sign offs Show less

Jan 2008 - May 2009

Leading Hand Pipe Fitter/Welder

Parker Point Phase B Upgrade, Western Australia

Scope of Work - The project entailed the installation of a new car dumper (CD4) facility, steelwork and associated equipment to increase the stockyard capacity from 95Mtpa to 116Mtpa. Monadelphous was engaged to install the new CD4 facility, as well as supply, fabricate and install all structural steelwork, conveyor steelwork, chutes, bins, pipes and fittings associated with the stockyard capacity upgrade. The scope of work involved the supply of shop drawings, isometrics, surface treatment… Show more Scope of Work - The project entailed the installation of a new car dumper (CD4) facility, steelwork and associated equipment to increase the stockyard capacity from 95Mtpa to 116Mtpa. Monadelphous was engaged to install the new CD4 facility, as well as supply, fabricate and install all structural steelwork, conveyor steelwork, chutes, bins, pipes and fittings associated with the stockyard capacity upgrade. The scope of work involved the supply of shop drawings, isometrics, surface treatment, non-destructive testing and touch-up of all structural steel and pipe works. Monadelphous was also contracted to conduct the installation, bolting and welding of all mechanical equipment, belts and hydraulics, where required. Contract Value $158 MillionGeneral Relief Supervising including; the delegation of work scope activities for a piping and mechanical crew, fabrication and erection of piping and structural steel, shutdown supervision of stacker re-claimer maintenance and dust suppression piping systems and implementing and adhering to the quality management system procedures and work instructions Show less

Apr 2007 - Nov 2007
Team & coworkers

Colleagues at Santos Ltd

Other employees you can reach at santos.com. View company contacts for 3265 employees →

1 education record

Rob Dickson education

  • Ignatius Park College
    Ignatius Park College
    High School
FAQ

Frequently asked questions about Rob Dickson

Quick answers generated from the profile data available on this page.

What company does Rob Dickson work for?

Rob Dickson works for Santos Ltd.

What is Rob Dickson's role at Santos Ltd?

Rob Dickson is listed as DPD Construction Superintendent at Santos Ltd.

What is Rob Dickson's email address?

AeroLeads has found 1 work email signal at @ymail.com for Rob Dickson at Santos Ltd.

Where is Rob Dickson based?

Rob Dickson is based in Greater Darwin Area, Australia while working with Santos Ltd.

What companies has Rob Dickson worked for?

Rob Dickson has worked for Santos Ltd, Kaefer Integrated Services Pty Ltd, Downer, Chiyoda Corporation, and Monadelphous.

Who are Rob Dickson's colleagues at Santos Ltd?

Rob Dickson's colleagues at Santos Ltd include Nick Mawkes, Christopher Curnow, David Jones, Dina Dmitrieva, and Drew Wickenden.

How can I contact Rob Dickson?

You can use AeroLeads to view verified contact signals for Rob Dickson at Santos Ltd, including work email, phone, and LinkedIn data when available.

What schools did Rob Dickson attend?

Rob Dickson holds High School from Ignatius Park College.

What skills is Rob Dickson known for?

Rob Dickson is listed with skills including Msic, Dogger'S Ticket, Forklift Operator, Non Slew Crane Operator, Elevated Work Platform Operator, Bsbohs407A Monitor A Safe Workplace, Certificate Iii In Engineering, and Piping.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Rob Dickson you were looking for.

View similar profiles