AeroLeads people directory · profile

Robert Hacker Miam Email & Phone Number

Project Manager at Audience Systems Ltd
Location: Royal Wootton Bassett, England, United Kingdom 8 work roles
LinkedIn matched
✓ Verified July 2026 2 data sources Profile completeness 71%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Project Manager
Location
Royal Wootton Bassett, England, United Kingdom
Company size

Who is Robert Hacker Miam? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Robert Hacker Miam is listed as Project Manager at Audience Systems Ltd, a with 45 employees, based in Royal Wootton Bassett, England, United Kingdom. AeroLeads shows a matched LinkedIn profile for Robert Hacker Miam.

Robert Hacker Miam previously worked as New Model Project Manager - New model Centre (PMO) at Honda Of The Uk Manufacturing Ltd. and New Model Senior Project Engineer - Assembly at Honda Of The Uk Manufacturing Ltd..

Company email context

Email format at Audience Systems Ltd

This section adds company-level context without repeating Robert Hacker Miam's masked contact details.

Audience Systems Ltd

Review company-level records connected to Robert Hacker Miam before choosing the right outreach path.

Profile bio

About Robert Hacker Miam

As a Project Manager / New Model Development Engineer I deliver New Product Development and introduction (NPD / NPI) Projects on time and under budget (£0.5M-50M) with over 20 years proven track record in Project Management and Lean Continuous Improvement across R&D and manufacturing environments.My experience spans both minor and full product life-cycle programmes, at times balancing 7 projects at a time. To achieve this, I maximise productivity by setting strategic direction; focusing on priority tasks (top KPI’s and risk management); mentoring teams to support cross-functional independence; identify and minimise waste and key stakeholder engagement.Key achievements;Large cost savings (Investment £M / Compensation £M / process £K / Ergonomic £K).Strengthened Quality management procedures, design standards, concern identification and overall fault per car reduction.Donor car methodology introduced to improve overall pre-production events ordering / handling process – process efficiency improvement of 60% achieved.Strengthened Design for manufacturing methodology via DMAIC Catia study, process verification and ergonomic guidelines.Qualifications;Catia V5 Advanced, Solidworks, Lean six sigma green beltSkills & Development:Problem Solving• Focus on making high quality decisions based on data collected• Objective and analyticalMy toolbox includes:Lean (DMAIC, Kanban, Kaizen, 5S, 5Y, Genba, PDCA, Agile, Process Map) and Six Sigma.Project Planning:My project plans are incredibly detailed, providing all necessary high-level timings for multi team activity. However, I have had to use many formats:• Top level strategic down to detailed activity plans.Developing Teams:Success of any project is down to the ability of teams, to that end I work hard to develop mine with an end goal of trust, mentoring and team support.• I led teams from diverse functions; up to 15 direct and more than 22 indirect people.• I do love to succeed but I get more pleasure from developing my team, passing on knowledge and providing support where needed.Personal Development:I love to learn. As technology never stands still and engineering is ever changing, I stay adaptable, constantly refining my technical skills.As a PM I strive to make today better than yesterday.

Current workplace

Robert Hacker Miam's current company

Company context helps verify the profile and gives searchers a useful next step.

Audience Systems Ltd
Audience Systems Ltd
Project Manager
westbury, wiltshire, united kingdom
Employees
45
AeroLeads page
8 roles

Robert Hacker Miam work experience

A career timeline built from the work history available for this profile.

New Model Project Manager - New Model Centre (Pmo)

Swindon, England, United Kingdom

Highly regarded NPI Project Manager responsible for planning and delivery of projects to market within the time constraints of the project plan via whole product lifecycle development with a toolbox from Lean & Agile principles.• 7 projects• Achieving Quality, Cost, Delivery, Manpower, Safety and Environment KPI’s• Budgets £6M to £50M• Project Team: Direct: 9-22; Indirect: 30+.• Managing and support of New Model workshop staff, press car preparation etc.Key Achievements… Show more Highly regarded NPI Project Manager responsible for planning and delivery of projects to market within the time constraints of the project plan via whole product lifecycle development with a toolbox from Lean & Agile principles.• 7 projects• Achieving Quality, Cost, Delivery, Manpower, Safety and Environment KPI’s• Budgets £6M to £50M• Project Team: Direct: 9-22; Indirect: 30+.• Managing and support of New Model workshop staff, press car preparation etc.Key Achievements include:Management system Procedures & Flows:For minor model changes identified parts ordering / handling efficiency improvements for trial events by introducing donor car methodology, reducing manual parts ordering and handling.• Achieved 60% efficiency improvement• Cost reduction £90k• Manpower reduction of 3 associates• New flow agreed and placed on quality management system (signed off by relevant depts.)Digital Prototype Modelling (DPM):Identified gap in DPM Event model preparation. Created standardised schedules and documentation for recurring events, streamlining project model preparation activity.• 29% efficiency improvement.Design Change control:Identified issue relating to processing delay of design changes, with impact to tooling go, event application timing and test schedules. I led a team to develop and implement computer-based control system.• Delay reduced from 1.5 weeks to 0.• Automated issue to categories, resulting in 41% efficiency improvement.• Reduction in paper use of 36%.• Automated tracking & completion report generated.Role Responsibilities:• Product lifestyle planning, development & management of Project control plan.• Development of detailed plans for virtual & prototype build events.• Drive continuous improvement (Kaizen) via Lean DMAIC approach.• Policy & Procedures: lead continuous improvement projects based on business analysis.• Lead best practise and standardisation across multiple projects Show less

Apr 2013 - Aug 2020

New Model Senior Project Engineer - Assembly

Tochigi, Japan

New Model Project Engineer seconded to Global Production Planning Office in Japan. Responsible for ensuring design for manufacturing front loading and strengthening of New model development constitution.• 4 projects• Verification of design intent through drawing / Catia, prototype and virtual trials, employing design for manufacturing methodology to ensure quality / safety strategies were supported, reduction in fault per car, concern identification and mitigation, ergonomic cost… Show more New Model Project Engineer seconded to Global Production Planning Office in Japan. Responsible for ensuring design for manufacturing front loading and strengthening of New model development constitution.• 4 projects• Verification of design intent through drawing / Catia, prototype and virtual trials, employing design for manufacturing methodology to ensure quality / safety strategies were supported, reduction in fault per car, concern identification and mitigation, ergonomic cost reduction.• Improve self-reliance.• Coordinating design for manufacturing with other global Honda plants, U.S., Japan Thailand.Key achievements include:Design for manufacture: Identified global cost reduction opportunities through Drawing / Catia study of proposed design direction by simplifying design, improved part application and general value analysis activity. Improvement in ergonomic cost mitigation through early analysis of ergo concerns.• Global cost reduction of £2M+ • Ergonomic cost mitigation £0.3M• Engine mount downtime reduced to zero.Design standards:Identified global plants had different assembly requirements resulting in difficulties for design team. Implemented design for manufacturing standards to standardise manufacturing requests to design.• Improved overall design analysis time by 21%• Adopted as a global standard by R&D function and other Honda plants.Role Responsibilities:• Verify design intent through drawing / Catia, prototype and virtual trials.• Promote New Model self-reliance factory side• Manufacturing leadership• Manufacturing Quality Maturation• Liaison with global manufacturing• Event planning and leadership Show less

Sep 2008 - Mar 2013

New Model Project Manager / New Model Development Engineer - Assembly

Project Manager for Assembly I delivered several New models into factory through full product life-cycle.I was able to deliver on all Quality, Cost, Delivery, Manpower, Safety and Environment KPI’s and was subsequently promoted to a new role.• 12 projects• Budget: £0.5M - £11M+• Team: Direct 8-10; Indirect: 30+Key Achievements include:Verification Standards:Identified gaps in design data interrogation (dwg / Catia) by New model engineers. Developed and introduced… Show more Project Manager for Assembly I delivered several New models into factory through full product life-cycle.I was able to deliver on all Quality, Cost, Delivery, Manpower, Safety and Environment KPI’s and was subsequently promoted to a new role.• 12 projects• Budget: £0.5M - £11M+• Team: Direct 8-10; Indirect: 30+Key Achievements include:Verification Standards:Identified gaps in design data interrogation (dwg / Catia) by New model engineers. Developed and introduced function know how sheets to quantify manufacturing requirements, identify past problem history concerns earlier and improve overall problem identification.• Reduction in design change compensation by 11%• Ergonomic mitigation cost reduction £0.2M• Fault per car reduction 2 faults/car• In-line downtime improvement• Cost saving in process efficiency £62k / year• Implemented as part of Quality Management system.Documentation Improvements:Identified process efficiencies in assembly documentation preparation. Documents were stand alone, increasing time to update as design progresses. Led a team to develop and implement a computer-based system that was driven from the Bill of Materials (BOM), linking all documents downstream of the BOM.• Document revision time reduced 32%• Accuracy improvement of 14%Role Responsibilities:• Responsible for all equipment, process, training, safety, quality and new technology.• Support production area throughout model life-cycle. Each section team reported to me through local PM leader.• Plan and oversee all trial events and manage countermeasure activity for identified problems.• Promote innovation and lean methodologies in each section to improve Quality, Cost and Process.• Report project progress to Senior Management Team.• Proactive project management activities drive continuous improvements.• Development of Assembly new model strategies for Cost, Quality, Ergo, process time improvement activities Show less

Apr 1998 - Sep 2008

New Model Development Engineer

Swindon, United Kingdom

New Model Engineer responsible for Chassis and Engine New Model introduction. As a New model Engineer, I delivered several new models into factory through full product life-cycle.I was able to deliver on all Quality, Cost, Delivery, Manpower and Safety targets set.• 5 projects• Verification of design intent through drawing / Catia, prototype and virtual trials, employing design for manufacturing methodology to ensure quality / safety strategies were supported, reduction in… Show more New Model Engineer responsible for Chassis and Engine New Model introduction. As a New model Engineer, I delivered several new models into factory through full product life-cycle.I was able to deliver on all Quality, Cost, Delivery, Manpower and Safety targets set.• 5 projects• Verification of design intent through drawing / Catia, prototype and virtual trials, employing design for manufacturing methodology to ensure quality / safety strategies were supported, reduction in fault per car, concern identification and mitigation, ergonomic cost reduction.• Liaison with design side.• Development of Assembly Frame New model documentation; Assembly Standards, Specification sheets, Process Quality Control Tables (PQCT), Sub-Assembly drawings, Ident request drawings, Instruction sheets, Lubrication chart and FMEA.Key Achievements include:Cost VA: Identified cost down opportunity for brake discs. Change from black paint to Geomet coating on brake discs.• Cost reduction of £2.50 / CBU• Warranty reduction of £53K• Adopted for future new modelsIdentified other potential cost reduction opportunities by drawing and layout verification.• Total cost VA identified £59.65 / CBU, achieved £40.06. Role Responsibilities:• Past problem reflection verification• Ensure quality, cost, delivery, manpower & ergonomic targets are achieved• Work with cross functional teams, process, equipment, line quality, safety and production.• Support Trail event activity both in UK & Japan.• Investigate / support / respond to R&D requests.• Development of new model documentation.• Responsible for category quality activity during new model development.• Responsible for new technology introduction into Assembly. Show less

May 1992 - Mar 1998

Quality Engineer

Swindon, United Kingdom

Technical analysis of complex quality problems, noise, vibration etc. Quality engineer responsible for Rover Longbridge built products.

Aug 1990 - Apr 1992

Vehicle Repairer - Tuning

Swindon, United Kingdom

Quality improvement activity to ensure Rover built products met Honda quality standards.

Jan 1987 - Jul 1990

Motor Vehicle Apprenticeship

Dhd

Vintage Bentley restoration. Full engine restoration and rebuild, magneto’s, starter motor and dynamo refurbishment, parts manufacturing and body preparation.

Jul 1980 - Jan 1987
Team & coworkers

Colleagues at Audience Systems Ltd

Other employees you can reach at audiencesystems.com. View company contacts for 45 employees →

FAQ

Frequently asked questions about Robert Hacker Miam

Quick answers generated from the profile data available on this page.

What company does Robert Hacker Miam work for?

Robert Hacker Miam works for Audience Systems Ltd.

What is Robert Hacker Miam's role at Audience Systems Ltd?

Robert Hacker Miam is listed as Project Manager at Audience Systems Ltd.

Where is Robert Hacker Miam based?

Robert Hacker Miam is based in Royal Wootton Bassett, England, United Kingdom while working with Audience Systems Ltd.

What companies has Robert Hacker Miam worked for?

Robert Hacker Miam has worked for Audience Systems Ltd, Honda Of The Uk Manufacturing Ltd., and Dhd.

Who are Robert Hacker Miam's colleagues at Audience Systems Ltd?

Robert Hacker Miam's colleagues at Audience Systems Ltd include Cheryl Ghey-Huxtable, Carla Sullivan, Paul Williams, Steve Wood, and Shaun Anstis.

How can I contact Robert Hacker Miam?

You can use AeroLeads to view verified contact signals for Robert Hacker Miam at Audience Systems Ltd, including work email, phone, and LinkedIn data when available.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.