Utility Inspector
•Project Nuevo Laredo Mexico to Monterrey, Nuevo Leon•Lay 30” line from Nuevo Laredo to Monterrey•Clear ROW, string pipe, boring, welding, ditching, coating, lowering in, tie ends, back fill & clean-up, hydro test
Please complete the CAPTCHA to continue
@fluor.com
✓
LinkedIn matched
A concise factual answer block for searchers comparing this professional profile.
Robert Razo is listed as Construction Manager Plains All American Pipeline based in Fort Worth, Texas, United States. AeroLeads shows a work email signal at fluor.com and a matched LinkedIn profile for Robert Razo.
Robert Razo previously worked as Utility Inspector at Howard Energy Partners and QA/QC Welding/Piping/Tank Inspector at Taneco. Robert Razo holds Welding Technology/Welder from Barton Community College.
This section adds company-level context without repeating Robert Razo's masked contact details.
AeroLeads found 1 current-domain work email signal for Robert Razo. Compare company email patterns before reaching out.
Robert Razo is a Construction Manager Plains All American Pipeline. Colleagues describe him as "Mr Robert owns some high skills and really it is a Super Manager in a lot of yields. My congratulations ." and "Robert is a great pipeline and manager that knows the industry very well. I would recommend his talents and experience to all."
Listed skills include Pipelines, Refinery, Petroleum, Petrochemical, and 46 others.
A career timeline built from the work history available for this profile.
San Antonio, Texas, Us
•Project Nuevo Laredo Mexico to Monterrey, Nuevo Leon•Lay 30” line from Nuevo Laredo to Monterrey•Clear ROW, string pipe, boring, welding, ditching, coating, lowering in, tie ends, back fill & clean-up, hydro test
•Build 120,000 Bbl Nizhnekamsk Refinery•90 tanks 50,000 Bbl to 120,000 Bbl•1800 KM pipe in pipe racks 48” thru 2”•Integrated Units•Heavy coker gas oil hydro treating•Integrated hydro cracking unit•Deep conversion plant•Off site facilities•Buildings and structures civil and mechanical
Doha, Qa
•Build a 180km / 14” ethylene pipeline•Build a 10km / 3” butane pipeline•Install three pump stations, scraper traps, and receivers•Install fiber optic cable•Commissioning and start-up and hydro test•Coordinate daily activities with welding, mechanical, piping, civil, electrical and reports
Ru
•Build 600 km 36” oil pipeline and pump station in Siberia, Russia•Oversee mechanical, piping, pipe supports, welding, and Civil•Testing: compaction, concrete tests, elevations, boring, and pipe supports•Commissioning and start-up •Coordinate daily activities with welding, mechanical, piping, civil, electrical and reports
Charlotte, North Carolina, Us
•Responsible for Dolphin unloading facility•Lay 20 miles/20” pipeline, build 500 hp pump stations•Inspect all civil, mechanical, electrical, structural steel, piping, to include hydro testing, coating, painting, cathodic protection, and welding•Tested welders per welding compliance requirements•Build 8 miles of access roads•Civil tests: compaction, concrete, elevations, rock column supports, gab-ion baskets•Commissioning and start-up and hydro test•Coordinate daily activities with welding, mechanical, piping, civil, electrical and reports
•Managed construction of 5/750,000 bbl tanks, control room, office buildings, mess hall quarters, meter runs, prover, scraper trap, utility lines•Also responsible for all mechanical, civil, piping, electrical, and cathodic protection•Build 20 miles of access roads•Civil tests: compaction, concrete, elevations, rock column supports, gabion baskets.•Commissioning and start-upPipeline construction and On/Offshore Terminal
Dhahran, Sa
•1979 to 1981: 900 KM 48” East/West Crude Oil Pipeline Saudi Arabia - Construction of off-shore facility, inspection of new 11.1 million bbl tank facility that included hydro testing, cathodic protection, coating, stringing, and install new utility service lines•Tested East/West 48” crude oil pipeline including double jointing rack.•1981 to 1981 Utility Inspector: Saudi Arabia - Pump station and on/shore terminal inspection that included architecture, civil, painting, padding blasting coating of pipe, back fill and cleanup.•Built air strip, hangers, asphalt roads, and utility system•1981 to 1983: Saudi Arabia - Supervised Terminal Operations•Received oil from pipeline, stored oil and loaded vessels •Proved meters and calculated ship-to-shore figures and performed cargo inspections.
Inspector assigned to the 48" East/West Crude oil Pipeline Project.Built 11 Pump Stations,Pressure Reducing Station,On/Offshore Terminal,11-1 Million Bbl Tanks,2-650,000 Bbl Bunker Fuel Tanks and 3-Berths.Commissioned and Start Up of Terminal.load ships at 130,000 Bph.
Quick answers generated from the profile data available on this page.
Robert Razo is listed as Construction Manager Plains All American Pipeline.
AeroLeads has found 1 work email signal at @fluor.com for Robert Razo.
Robert Razo is based in Fort Worth, Texas, United States.
Robert Razo has worked for Howard Energy Partners, Taneco, Qatar Petroleum, Rosneft, and Duke Energy International.
You can use AeroLeads to view verified contact signals for Robert Razo, including work email, phone, and LinkedIn data when available.
Robert Razo holds Welding Technology/Welder from Barton Community College.
Robert Razo is listed with skills including Pipelines, Refinery, Petroleum, Petrochemical, Inspection, Piping, Gas, and Lng.