Consultant
Cleveland, Oh, Us
APMEX: Conducted a facility and operations assessment to identify potential improvements. Streamlined the layout of the existing facility by employing new equipment and improved processes to significantly increase both storage capacity and throughput for their high value, direct to consumer operation.Express: Solicited competitive bids from a list of qualified 3PL providers to assume Express’s growing ecommerce distribution operations. Managed the RFI process from document creation through evaluation of responses, resulting in provider recommendations based on capabilities, high-level budgetary estimates, and operational site visits.G&S Metal Products: Developed automation and system enhancements to improve storage capacity, inventory accuracy, and throughput. Created a phased implementation plan to transition from existing operations to a new building layout with automated processes in the same facility. Inno-Pak: Performed detailed data analysis of Inno-Pak’s business to determine the best option for blending two separate facilities into one operation. Determined facility size, operational processes, and equipment needed to accommodate an increase in sales volume of close to 200% over the next five years. Led RFP process for racking and mobile equipment, including vendor bid package preparation, evaluation, and final vendor recommendations.Marmot: Developed facility design and operating model for a Greenfield, multi-brand, West Coast distribution center. Performed data analysis, developed equipment and process flow concepts, sized the facility to accommodate for several years of growth projections, and created facility layout AutoCAD drawings.