Roberto Bono has 30 years of experience in tunneling work, including 12 years in transit and transportation tunnels.His experience varies from traditional drill and blast excavation, to deep shafts, to mechanized tunnel excavations with hard rock TBMs, soft ground Slurry Shield and EPB Shields, under very dense urban areas. Projects include transit and rail tunnels, water tunnels, and hydroelectric facilities. Delivery methods have included design-build and design-bid-build.Specialties: HIGHLIGHTS OF PROFESSIONAL QUALIFICATIONS•

Roberto Bono's Current Company Details
Webuild

Webuild

View
Underground TBM Senior Expert
Website:
webuildgroup.com
Employees:
898
Roberto Bono Work Experience Details
  • Webuild
    Underground Tbm Senior Expert
    Webuild May 2020 - Present
    Milano
  • Salini Impregilo
    Underground Tbm Senior Expert
    Salini Impregilo Jul 2019 - May 2020
    Milano
  • Salini Impregilo
    Project Engineer
    Salini Impregilo Jan 2015 - Jun 2019
    Dugway Storage Tunnel - Cleveland, Ohio Usa
    The Dugway Storage Tunnel project (DST) is one component of a program being implemented by the Northeast Ohio Regional Sewer District (NEORSD) to improve the control of combined sewer overflows on the east side of the Greater Cleveland service area. The project area is mainly residential, interspersed with commercial properties and parks.The tunnel alignment is approximately 2.8 miles long, excavated with single shield hard rock TBM 27 ft diameter. The finished internal tunnel diameter is 24 ft. Depths to tunnel invert generally range from 180 to 230 ft below ground surface. The project will have a total of six shaft with internal lined diameter between 16 to 50 ft.Adit connections between shafts and tunnel will be excavated with conventional method.Successful Case of Groundwater Freezing at the Shaft DST1.
  • Salini Impregilo
    Chief Engineer
    Salini Impregilo Dec 2011 - Jan 2015
    Lake Mead Intake No. 3 Project For Southern Nevada Water Autority, Las Vegas Usa
    Lake Mead Intake No. 3 - Design-Build Project. Work of the Project includes a 600-foot deep access shaft with 30-foot diameter, excavated by drill and blast and lined with cast-in-place top-down concrete. Work also includes 15,300-feet of 20-foot I.D. tunnel under Lake Mead excavated by Herrenknecht hybrid TBM with diameter of 23.5 feet in mudstone, sandstone, and basalt. TBM is designed for operation under 17-bars of pressure and capable of operating in either open or closed pressurized mode. Spoil removal is by slurry system or continuous belt conveyor. Tunnel is supported by one-pass precast segmental lining with universal ring. Program for high pressure hyperbaric interventions was developed for maintenance of the TBM at all possible pressures and with the possibility of saturation interventions. Work also includes underwater excavation in 350-feet of water and construction and erection of underwater Intake Structure with integrated TBM docking station, and other ancillary work.Recognition of the Project:2016 Outstanding Civil Engineering Achievement Award, America Society of Civil Engineering (ASCE) Finalist.2016 Tunnel Achievement Award for Project Excellence (Tunnel Business Magazine).2015 Global Tunneling Project of the Year (over $500 Million) Tunneling & Underground Space Awards.
  • Paymacotas S.A.U.
    Technical Director Of The Tunneling Works - Engineering
    Paymacotas S.A.U. 2002 - Oct 2011
    Barcelona Metro Line 9 - Spain
    The Barcelona Metro Line 9 Project consisted of the construction of tunnel 150,000 ft long with 5 shielded tunnel boring machines (two EPB Herrenknecht of 31 ft diameters, two EPB Herrenknecht of 40 ft diameter and one Dual Mixshield tunnel boring machine NFM-Wirth of 40 ft diameter). The cutterhead interventions were executed systematically in hyperbaric conditions. The excavation was done through very heterogeneous geological conditions, faults areas, with high groundwater inflows and under very dense urban area, requiring special attention to mitigation of surface settlement, with building and infrastructure movements controlled by an elaborate monitoring plan. The tunnel was supported by precast segmental lining with universal ring. The project included the excavation of 52 stations, shafts of 87 ft internal diameter, between 83 ft and 267 ft depth of which 20 will be interchange stations accessible to another transit system. The excavation of the shafts was executed with mechanical methods and with drill and blast depending on the geological ground conditions. The project included the mechanical-electrical installations inside of the tunnel and stations and also the station’s architectural features.
  • Paymacotas S.A.U.
    Tunneling Operations Supervisor - Engineering
    Paymacotas S.A.U. 2004 - 2005
    Emergency Evacuated Tunnel Of Cadí, Pyrenees - Spain
    The Project consisted of the excavation of an emergency evacuation tunnel parallel to an existing roadway tunnel. The excavation was executed with a Wirth hard rock TBM with a diameter of 15 ft and the total length of the emergency tunnel was 12,300 ft. The tunnel was supported by shotcrete, wire mesh, rock bolts and steel ribs according to the different geological conditions encountered. The project included the excavation of 19 connections tunnels between the emergency tunnel and the roadway tunnel, one every 610 ft approx.
  • Paymacotas S.A.U.
    Tunneling Operations Supervisor - Engineering
    Paymacotas S.A.U. 2003 - 2004
    Emergency Evacuated Tunnel Of Collabos - Spain
    The Project consisted of the excavation of an emergency evacuation tunnel parallel to an existing roadway tunnel. The excavation was executed with a hard rock TBM with a diameter of 15 ft and the total length of the tunnel was 6,333 ft. The tunnel was supported by shotcrete, wire mesh, rock bolts and steel ribs. The project included the excavations of 6 connections tunnels between the emergency tunnel and the roadway tunnel, one every 900 ft.
  • Impregilo S.P.A.
    Construction Manager
    Impregilo S.P.A. 1998 - 2002
    Acheloos River Hydraulic Pressure Tunnel - Greece
    The Acheloos Project consisted of the excavation of a main tunnel, 57,000 ft long with 22 ft diameter, driven using a open mode Wirth TBM; cast-in-place concrete lining; a water intake; a service tunnel 1,475 ft long excavated with drill and blast; a sluice gate shaft; a 470 ft deep surge shaft approximately 66 ft in diameter. Contract value: approx. $70M.
  • Impregilo S.P.A.
    Technical Office, Operations & Methods
    Impregilo S.P.A. 1997 - 1998
    Wanjiazhai Yellow River Project, Shanxi Province - China
    The Wanjiazhai Project consisted of the excavation of a main hydraulic free flow tunnel, 293,333 ft long with 14 ft ID, driven using 4 double shield TBMs. The tunnel was supported by precast hexagonal segment lining to form honeycomb shaped rings. Contract value: approx. $ 200M.
  • Impregilo S.P.A.
    Technical Office, Operations & Methods
    Impregilo S.P.A. 1995 - 1997
    Singkarak Hydroelectric Power Project - Indonesia
    The Singkarak Project consisted of the excavation of a hydraulic pressure tunnel, 54,333 ft long excavated with drill and blast and with a open hard rock TBM manufactured by Robbins, 20 ft diameter. The tunnel was supported by shotcrete, wire mesh, rock bolts and steel ribs lined with cast in place reinforced concrete lining. The project also included the excavation of an underground Power House 84 ft X 150 ft X 330 ft, one gate shaft and one pressure shaft. Contract value: approx. $ 140 M.
  • Carlo Brino Company
    Technical Site Manager
    Carlo Brino Company 1994 - 1995
    Genova Voltri - Italy
    The project consisted of the excavation of 10,000 ft of rail tunnel with drill and blast method and with a roadheader. The tunnel, with a large section of 1,291 ft2, was supported by shotcrete, wire mesh, rock bolts and steel ribs according to the different geological conditions encountered and finally with cast-in-place reinforced concrete lining. The tunnel passed under a dense urban area and infrastructure, with consolidation works in advance of excavation.

Roberto Bono Skills

Tunneling Metro Civil Engineering Tunnels Geotechnical Engineering Engineering Tbm Construction Excavation Construction Management Geotechnics Rail Large Water Inflows Epb Public Transport Transportation Slurry Tbm Hiperbaric Interventions Gassy Tunnel Freezing

Roberto Bono Education Details

Frequently Asked Questions about Roberto Bono

What company does Roberto Bono work for?

Roberto Bono works for Webuild

What is Roberto Bono's role at the current company?

Roberto Bono's current role is Underground TBM Senior Expert.

What is Roberto Bono's email address?

Roberto Bono's email address is ro****@****ail.com

What schools did Roberto Bono attend?

Roberto Bono attended Politecnico Di Torino, Politecnico Di Torino.

What skills is Roberto Bono known for?

Roberto Bono has skills like Tunneling, Metro, Civil Engineering, Tunnels, Geotechnical Engineering, Engineering, Tbm, Construction, Excavation, Construction Management, Geotechnics, Rail.

Who are Roberto Bono's colleagues?

Roberto Bono's colleagues are Tubasi Hamza, Vincenzo Matinata, Nekkadam Ismatov, Ibrahim Khubrani, Emilio Di Rocco, Decu Gabriel, Gianluca Di Vizio.

Not the Roberto Bono you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.