My professional experience is broad since it has started with R&D and Production Engineer in food industry for about 7 years, than continued with Oil & Gas Industry (both onshore and offshore) including either process design activities or commissining & start-up activities for around 15 years. I was involved in different projects as senior Process & Commissioning Engineer to design new plants, review existing ones, verify equipment, simulation of processes. Recently, I’m involved with the whole workflow of an EPC project, starting from FEED verification through EPC, than up to commissioning and start-up of the new plants with below professional skills:● Process & commissioning manager● Pre-commissioning, commissioning and start-up activities including procedure preparation and verification, inspection, functional tests, FAT, SAT, performance test etc.● Review Contractual Documentation ● Equipment design and verification● Process simulation● Preparation of any kind of process related project documentation (process description, basis of design, Heat&Mass Balance, PFD’s, P&ID’s, MSD’s, equipment data sheet, C&E, operating manual, control narrative etc.) ● Safety tasks (HAZOP, RAM analysis, PSM, SIL, management of change process etc.)● Site survey experiences ● Process control systems such as DCS, ESD, HMI, advanced control, alarm management etc.● Problem solving, trouble shooting and optimization analysis● Interface management with vendors and licensors ● Support for catalyst loading ● Support for development of OTS (Operator Training System) with dynamic simulation test and HMI preparation● Support for development of CMMS (Computerized Maintenance Management System) ● Support for technical alignment of vendors and request for purchase● Support for post order activities● Technical bid evaluation
-
Process EngineerIsc Consulting Engineers Dec 2024 - PresentEsbjerg Municipality, Region Of Southern Denmark, Denmark -
Commissioning ManagerAir Products Mar 2024 - Dec 2024L'Aia, Olanda Meridionale, Paesi Bassi -
Senior Commissioning EngineerEni Nov 2022 - Mar 2024United KingdomENI UK – CO2 LBA Project ● Preparing the commissioning documentation for site activity -
Commissioning LeaderEni Nov 2022 - Mar 2024Gela, Sicily, ItalyENI GELA Refinery – Bioject Project ● Preparing the commissioning documentation for site activity -
Commissioning Support For Start-Up ActivitiesEni Nov 2022 - Mar 2024Ravenna, Emilia-Romagna, ItalyENI CABO Gas Plant – CO2 Capture Plant Project ● Commissioning support for start-up activities -
Commissioning ManagerSaipem May 2021 - Oct 2022Quebec, CanadaSaipem Canada – CO2 Capture Project 30 t/d CO2 produced from enzymatic processing of a waste gas ● Start up for the new plant installation● Commissioning of new equipments for the installation ● Preservation of existing equipments● Review of project documentations ● Coordination of commisioning and operation teams -
Senior Process EngineerSaipem Apr 2020 - Apr 2021Crotone, Calabria, ItalyENI DIME – Gas Plant in Crotone, Hera Lacinia and Roseto ● Engineering support for asset integrity support● Plant documentation (P&ID, C&E, PFD, Operating Manual etc.) updates“As Build” for the Gas Plants ● Site survey for update the documentation● Team leader and interface with client for the project -
Senior Process & Commissioning EngineerSaipem Dec 2018 - Mar 2020İzmir, TurkeySOCAR – STAR Aegean Refinery Project 214000 BPSD Crude Distillation Unit; 85000 BPSD Vacuum Distillation Unit; 66000 BPSD Hydrocracking; 40000 BPSD Delay Cocking Unit; 26000 BPSD Kero Hydro Treater; 20000 BPSD Naphtha Hydro Treater; 28000 BPSD Continuous Catalytic Regeneration; 68000 BPSD Diesel Hydro Treater; 160000 Nm3/h HPU; SWS / AGRU / Utility / Offsites ● Commissioning activities● Start-up activities● Process optimization up to contractual specs● Performance test procedure and Report ● Plant optimization and support to client● Investigation and management of change ● Support for process safety● NCR investigation and resolution -
Senior Process EngineerSaipem May 2018 - Nov 2018Rome, Latium, ItalyAGIBA – MELEIHA New Gas Plant Feasibility Study 100 MMSCFD of Raw Gas as feed will be separated from Oil and Water and treated to meet sales gas specification. Main Process Units: Gas Compression, Mercury Removal, Dehydration, Dew Point Control, Gas Sweetening ● Processs simulation (with Hysys)● Heat&Mass balance ● Process flow diagram● Equipment summary with preliminary sizing ● Utilities consumption summary● Simulation report● Process final report -
Senior Process EngineerSaipem Jan 2017 - Apr 2018Saudi ArabiaARAMCO – JAZAN Integrated Gasification Combined Cycle 110 MBD of Vacuum Residue as feed; production of 2.4 GW net export to grid.18000 ton/d as Gasification Load; Acid Gas Removal Unit with 4x330 m3/h of tot lean methanol circulation;Hydrogen Recovery Unit with 184000 Nm3/h of H2 production; Soot Ash Removal Unit (4x4000 TPD of soot water feed); Sulfur Recovery Unit with total sulfur production of 1018 MTD● FAT (factory acceptance test) for units HMI (DCS, ESD, Machinery/Package PLC, Alarm Management)● P&ID update● C&E update● Control narrative update● Logic diagram update -
Senior Process & Commissioning EngineerSaipem Feb 2014 - Dec 2016Paramaribo, SurinameSuriname Oil Company, 15000 BPSD Vacuum Distillation Unit; 5400 BPSD Vis-breaker; 10300 BPSD Hydrocracking; 24000 Nm3/h HPU; 3100 BPSD Catalytic Reformer Unit; 40 t/d Sulfuric Acid Unit; SWS / AGRU / Utility / Offsites● Pre-commissioning activities● Commissioning activities● Start-up activities● Process optimization up to contractual specs● Performance tests● Plant optimization and support to client● Catalyst loading ● OTS and board operator training in control room● Investigation and management of change ● CMMS● Support for process safety -
Senior Process & Commissioning EngineerSaipem Jul 2010 - Jan 2014Paramaribo, SurinameSTAATSOLIE –Refinery Expansion Project Suriname Oil Company, 15000 BPSD Vacuum Distillation Unit; 5400 BPSD Vis-breaker; 10300 BPSD Hydrocracking; 24000 Nm3/h HPU; 3100 BPSD Catalytic Reformer Unit; 40 t/d Sulfuric Acid Unit; SWS / AGRU / Utility / Offsites ● FEED verification● Process support for EPC activities● Process Project Leader for HPU and SAU (PFD, P&ID, Equipment DS, Hydraulic Check, Hazop, SIL, 3D Model, Licensor Interface)● OTS (operator training system) development for HPU and CRU● Procurement follow up● Operating manual● CMMS (computerized, maintenance management system) ● FAT (factory acceptance test) for Units HMI (DCS, ESD, Machinery/Package PLC, Alarm Management) -
Senior Process EngineerSaipem Apr 2010 - Jul 2010Rome, Latium, ItalyJUBILEE Field Gas Plant Ghana – GOSP Feasibility Project ● Process simulation● PFD, Heat&Mass Balance -
Senior Process EngineerSaipem Jan 2010 - Apr 2010Rome, Latium, ItalyCAFC Algeria – Feed (Utilities) Project ● PFD, P&ID● Equipment data sheet● Package specification -
Senior Process EngineerSaipem Oct 2009 - Jan 2010Rome, Latium, ItalyENI Zubair Oil Field Development Iraq – GOSP Revamping Project Project ● Site survey in Iraq● Site survey report ● Process simulation● PFD, Heat&Mass Balance -
Senior Process EngineerSaipem Jul 2009 - Oct 2009Rome, Latium, ItalyENI EST San Nazzaro – EPC Refinery Project ● Sour water unit process responsible● Equipment data sheet● Process simulation● PFD, MSD, P&ID -
Senior Process EngineerSaipem Sep 2008 - Jul 2009Rome, Latium, ItalyMellitah Complex Libya – EPC Production Enhancement Project ● Operating manual● Equipment data sheet● Process simulation● PFD, P&ID -
Senior Process EngineerSaipem Mar 2008 - Sep 2008Rome, Latium, ItalyMID Stream Plant North Africa – GTL Feed Project ● HAZOP ● Equipment data sheet● Process simulation● PFD, P&ID -
Senior Process EngineerSaipem Sep 2007 - Mar 2008Rome, Latium, ItalyLIBYA LNG Libya – Feasibility Study for LNG Project ● Equipment summary● Equipment data sheet● Study report● Process simulation -
Senior Process EngineerSaipem Mar 2007 - Sep 2007Rome, Latium, ItalyTempa Rossa Italy – Feed Endorsement for Oil &Gas Project ● Line sizing● Material selection● Pressure safety valves● Blow down valves● Equipment data sheet● Process simulation -
Research And Development Process EngineerUnilever Mar 2001 - Mar 2007Rome, Latium, ItalyPilot Plant Responsible ● Pilot plant management● Production trials responsible● International research projects member● TPM (total preventive maintenance) pilot plant management ● New production plant start-up
Roberto Di Domenico Education Details
-
Chemical Engineering
Frequently Asked Questions about Roberto Di Domenico
What company does Roberto Di Domenico work for?
Roberto Di Domenico works for Isc Consulting Engineers
What is Roberto Di Domenico's role at the current company?
Roberto Di Domenico's current role is Process Engineer.
What schools did Roberto Di Domenico attend?
Roberto Di Domenico attended Sapienza Università Di Roma.
Who are Roberto Di Domenico's colleagues?
Roberto Di Domenico's colleagues are Anders Ture Rydell, René Hindborg Hemmingsen, Michael Ryding, Anita Kadrija, Torsten Gjøl Jacobsen, Jørgen Schmidt, Frank Nielsen.
Not the Roberto Di Domenico you were looking for?
-
1almaviva.it
-
-
Roberto Di Domenico
Canoas, Rs -
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial