Project Coordinator
- Projects involved: Nolan Hill Phase 1-3 Nolan Hill storm ponds Shaganappi Trail NW Extension Sage Hill Phase 4-8 Silverado Phase 3 Aspen Woods Phase 4
- Performed detail estimate, contract preparation and site supervision for grading, water, sewer, road works, ensured projects on schedule.
- Trained and supervised several summer engineering students
- Arranged surveying and material testing for construction needs
- Performed daily erosion and sedimentation inspection, also prepared erosion control reports
- Conducted bi-weekly site safety meetings