Underground Mining Engineer
CurrentLKAB as the oldest and biggest SLC Iron Ore underground mining project in northern Sweden since 1890. The tubular iron ore body with 4km-long, 80mthick, and 2km-depth with annual production rate 26million MT iron ore.Directly report to Mine Planning Manager and liaise with Geotechnical-Geology-Ventilation-Surveying-Mining Research for weekly progress:• Responsible for strategic mine layout including all media and supporting facilities for development and production preparation linked with drilling-loading production.• Joint-cooperation with geology-mine surveying-ventilation-rock mechanic-media support-mine research to drive the mine development towards deeper level production.• Hands-on with development progress to align with the planned layout ensuring development proceed swiftly budget and safety wise.