Rogério Costa

Rogério Costa Email and Phone Number

Fiscal de Projetos - Strategic Project - PPE - Gerência de Projetos Estrategicos @ Aperam
State of Minas Gerais, Brazil
Rogério Costa's Location
Timóteo, Minas Gerais, Brazil, Brazil
About Rogério Costa

My name is Rogério Costa, and I'm known for my ability to adapt and solve problems.I have a degree in Mechanical Engineering, Quality Engineering, Welding Technologist, Mechanical Technician, as well as experience in non-destructive testing in the oil and gas sector.I've worked in a few companies, but with a lot of longevity, which makes me a conservative professional. I have worked directly for Usiminas Mecânica, the largest company in Latin America in terms of goods and capital, and I am currently employed by the multinational Aperam South America, the largest producer of speciality steel in Latin America.I am self-employed as a Mechanical Engineer (PH) and act as a legal expert.My strengths include basic engineering development, project implementation, testing and commissioning.Among my experience in engineering services, I would highlight various projects such as the assembly of stadiums, bridges and viaducts, tanks, the assembly of steel and mining equipment and the replacement of rolling mills.With my experience I can make a positive contribution to companies that develop highly complex engineering.These days, it's not enough just to be an engineer, you need to have knowledge, experience and adaptability. Over the years I have adapted and become a multi-skilled professional. This adaptation has made me a more knowledgeable professional in various areas of engineering. I'll cite a few examples such as planning maintenance / works and major shutdowns, non-destructive testing (ultrasound, LP and PM, EVS), welding, maintenance in the rolling mill area, assembly of structures and equipment, PH in NR12, NR13 and NR23 standards, knowledge of various standards, including the main AWS and ASME standards, surveying construction sites, procurement of supplies, cost control and Capex management.I am briefly summarising my 25 years in the industry and am available for a more detailed presentation.

Rogério Costa's Current Company Details
Aperam

Aperam

View
Fiscal de Projetos - Strategic Project - PPE - Gerência de Projetos Estrategicos
State of Minas Gerais, Brazil
Website:
aperam.com
Employees:
6406
Rogério Costa Work Experience Details
  • Aperam
    Fiscal De Projetos - Strategic Project - Ppe - Gerência De Projetos Estrategicos
    Aperam
    State Of Minas Gerais, Brazil
  • Aperam
    Implementation Mechanic - Oversight - Strategic Project - Ppe - Strategic Project Management
    Aperam Feb 2020 - Present
    Timóteo, Minas Gerais
    Project - ASA -HSM 1500 PROJECT - Implementation of the new Steckel Mill chair, manufactured by Danielle - Italy. Technical support in the survey of information of the wet zone, flow, pumps, cooling towers, assembly of columns and metal structures, implementation of the revamp of the wet zone, improvement of the cooling tower, piping, welding, dimensional, non-destructive tests, excavation of soil for passage of pipes, soil mechanics, Subdivision of soils, monitoring of welding in stainless steel tanks double fusion TIG process, monitoring of ultrasound tests PHASE ARRAY.STANDARD: VIII, AWS D1.1, B31.3, AWSD1.1Project detailing:Installation of water tank, supporting structures, platform, stairs, handrails, skirting boards. Installation of pipe racks, pipework, valves supports and others that interconnect the water tank at the wetland bank and up to the pump house, as well as the interconnections up to the spacing tank and emergency basin. Interconnect (connect) all NEW equipment with EXISTING equipment. Electromechanical assembly of the new pumps inside the pump house, the new tower and the new filter. Removal of all electromechanical interferences for the assembly of the new equipment; disassembly of the existing gearbox of the final winder and motors, for levelling the civil base, replacement of the oil tank of the new gearbox; removal of interference for the assembly of the new sets; electromechanical assembly of the NEW reducer assembly and all its components for the operation, repositioning and alignment of the motors; repositioning of the supports and hydraulic supply pipes of the coil extraction car, after lowering the civil base of the reducer; NDT tests (Leakage, penetrating liquid, Ultrasound); commissioning and operating tests at no load and with water;
  • Tribunal Regional Do Trabalho Da 3ª Região
    Engenheiro Mecânico - Perito
    Tribunal Regional Do Trabalho Da 3ª Região Sep 2023 - Present
    Coronel Fabriciano, Minas Gerais, Brasil
    - Tribunal de Justiça do Estado de Minas Gerais é um órgão brasileiro do poder judiciário do estado de Minas Gerais, com sede na capital estadual e jurisdição em todo o território estadual- Emitir parecer técnico conforme normas pré-estabelecidas;- Investigar, analisar e apresentar conclusões sobre as condições técnicas de equipamentos em processos judiciais;- ENGENHEIRO MECÂNICO (PLH) NR12, Máquinas e Equipamentos, NR-13 - Cadeiras, vasos de pressão e tubulações e NR-23 elaborando projetos de combate a incêndio conforme IT 's do CBMMG.It's do CBMMG.
  • Tribunal De Justiça Do Estado De Minas Gerais
    Engenheiro Mecânico - Perito
    Tribunal De Justiça Do Estado De Minas Gerais Oct 2023 - Present
    Timóteo, Minas Gerais, Brasil
    - Tribunal de Justiça do Estado de Minas Gerais é um órgão brasileiro do poder judiciário do estado de Minas Gerais, com sede na capital estadual e jurisdição em todo o território estadual- Emitir parecer técnico conforme normas pré-estabelecidas;- Investigar, analisar e apresentar conclusões sobre as condições técnicas de equipamentos em processos judiciais;- ENGENHEIRO MECÂNICO (PLH) NR12, Máquinas e Equipamentos, NR-13 - Cadeiras, vasos de pressão e tubulações e NR-23 elaborando projetos de combate a incêndio conforme IT 's do CBMMG.It's do CBMMG.
  • Diocese De Itabira
    Engenheiro De Projetos (Voluntário Igreja Católica)
    Diocese De Itabira Jun 2024 - Present
    Coronel Fabriciano, Minas Gerais, Brasil
    Trabalho voluntário para reforma da co-catedral de Coronel Fabriciano. Após a queda do teto da Igreja, esta iniciando o planejamento da reforma, elaboração de propostas técnicas comerciais, cronograma de obra, projeto de prevenção e combate a incêndio conforme CBMMG.Em breve nossa catedral estara aberta.
  • Somar Prestação De Serviços
    Project And Implementation Supervisor (Outsourced)
    Somar Prestação De Serviços Sep 2018 - Feb 2020
    Timóteo, Minas Gerais, Brasil
    PROJECT: REVAMP - STRIPPING CIRCUIT - HOT STRIP MILL - LTQ- Electromechanical adaptation (mechanical, hydraulic, electrical and automation base) for the new Voith hydraulic coupling.- Load loss survey;- Replacement of stop and check valves;- Replacement of bends and pipes&- PAC 1, 2, 3 - Start Up & Commissioning of ''pipes part 1'',2",3"RCO 2019 ( MAJOR SHUTDOWN - HOT STRIP MILL - LTQ)- Technical assistance in refurbishing the WB II furnace;- Technical assistance and assembly of the HSB;- Technical assistance - Edge rolling mill chair test report;- Issuing of technical reports;PROJECTS - SM MILL BEARINGS - METALS SMS GROUP:- CALCULATION AND INTERPRETATION OF ROLLING MILL STAND CLEARANCES;- CALCULATION AND INTERPRETATION OF BEARING CLEARANCES;- CALCULATION AND INTERPRETATION OF CLEARANCES BETWEEN ROLLING MILLS AND BEARINGS;- Implementation of the new Steckel rolling mill bearings;- Implementation of the New Bi-metal Liners with Centralized Lubrication on the Rolling Mill Seats;- Implementation of Centralized Lubrication in the Rolling Mill and Rougher Bearings;- Implementation of the new stretchers (Final Acceptance);- Site supervision;- Coordination and planning of major shutdowns;- Preparation of a project dictionary;- Preparation of EAP;- Risk management;- Team management;- Cost management; - Supporting the Project Manager in Capex-Opex Management; - Drawing up disbursement schedules;- Supply management;- Use of SAP Tools, Excel, Power Point and MS Project, (Google Drive, Drive Spreadsheet, Drive Documents) Advanced level; - Project review;- As Built drawings,- Create GRD - Guia de Remessas de Documentos;- Create RED - Create New Documents in DMS;- Create RED - Review Documents in the DMS;- Create RDI - Review Documents With Impediments;- Prepare Technical Specification;- Equalize Technical Proposal;- Create Bill of Materials (BOM);
  • Pce-Planning
    Project And Implementation Supervisor (Project Engineering - Aperam
    Pce-Planning Sep 2017 - Sep 2018
    Timóteo E Região, Brasil
    PROJECTS - THERMOFISCHER SCIENTIFIC: - Implementation of the New X-Ray - Installation of assembly and metal structures - X-Ray Platform;- Implementation of the Instrument Air Piping Line - X-Ray;RCO 2017 (MAJOR STOPPAGE - HOT STRIP ROLLING MILL - LTQ)- Monitoring of NR 13 activity, pressure flow;- Supervision of the refurbishment of the WB II furnace;- Issuing technical reports;- Cost management; - Supply management;- Use of SAP Tools, Excel, Power Point and MS Project, (Google Drive, Drive Spreadsheet, Drive Documents) Advanced level; - Project review;- Drawing up Technical Specifications;- Equalize Technical Proposal;- Create Bill of Materials (BOM);
  • Usiminas Mecânica
    Specialized Technician Iii - Heavy Equipment
    Usiminas Mecânica Jan 2016 - Sep 2017
    Ipatinga E Região, Brasil
    - Project supervision;- Monitoring mechanical assembly in converters;- Supervising the mechanical assembly/welding of Duplex stainless steel digesters;- Monitoring welding processes (MIG/MAG and SUBMERSE ARC), - Execution of Welding Procedures and Welding Execution and Inspection Instructions "IEIS";- Total traceability control and joint identification using heavy boilermaking drawings;- Welding inspection on 304 L and Duplex stainless steel;- Optimization of the welding process, drawing up improvement devices to increase production;- Monitoring of Non-Destructive Testing (X-Ray - LP - Ultrasound)- Machine calibration;- Total Traceability Control;- Calculating welding consumables; - Issuing non-conformity notes in SAP/R3- Data book assembly;
  • Usiminas Mecânica
    Specialized Technician Ii - Heavy Boilermaking
    Usiminas Mecânica May 2012 - Jan 2016
    Ipatinga E Região, Brasil
    PROJECT SUPERVISION ;NR-13 - PRESSURE VESSELS;TECHNICAL ANALYSIS - ULTRASOUND TESTING- Reduc/Tecab spheres (Petrobras),- Process Towers REVAP, RNEST ( Petrobrás ),- REGAP H2S Knock-out Vessels (Petrobrás),- Guamaré Project,- Solvay furnaces, - Alunorte and Alumar digesters and converters,- Offshore structures,- REPAR-CONPAR reduction furnaces (Petrobrás),- Maracanã Stadium; Allianz Park Stadium;- Brasilia Bridge; - Oil Platform - P47; Oil Platform - P 51; Oil Platform - P53; Oil Platform - P55; Oil Platform - P66; Oil Platform - P69; Oil Platform - P70; Oil Platform - PRA1; Manufacture of Petrobras spheres; - Stainless steel pressure vessel - clad and austenitic - Suape Petrochemical Complex; - Oil Platform - P 55 / Deck Box; - Manufacture of bell mouths; - Platform ship;- 35T and 135 ton Torpedo Pile; - Clad stainless steel H2S absorber tower - Revap refinery; - Assembly of the Usiminas cold strip mill; - Hydromechanical equipment, such as: VOITH pre-distributors,- Turbine components and Rio Madeira generators; - Wind Energy Tower - Cubatão Usiminas; - Shipbuilding - STX, COREMA and WILSON SONS; - Evaporator bodies - stainless steel and duplex blow off tanks; Bleaching tower - stainless steel and duplex; - Participation in the homologation of Usiminas' Sincron, CLC (Continuous On Line Control), DH 36 steels;- Issuing non-conformity notes in SAP/R3
  • Usiminas Mecânica
    Trainee Welding Engineering Technology - Methods And Process - Bridges And Viaducts
    Usiminas Mecânica Feb 2012 - Jul 2012
    Ipatinga, Minas Gerais, Brasil
    PROCESS ANALYSIS:- Use and interpret international standards and codes;-Welding qualification;- Determining welding costs;- Strength of construction and welded materials;- Knowledge of the quality management system in the welding process; - Knowledge of engineering processes and technical coordination of projects; - Knowledge of manufacturing processes, welded profiles, metal structures, bridges and viaducts, equipment; - Knowledge of the functionalities of the SAP/R3 system;- Preparation of RQPS;- Preparation of EPS;- Qualification of procedures;
  • Usiminas Mecânica
    Quality Inspector Us Ii - Structures
    Usiminas Mecânica Jan 1999 - May 2012
    Ipatinga, Minas Gerais, Brasil
    Conducting and carrying out inspections during the execution stages of services, including the protection of finished services, reporting and recording progress, occurrences and actions taken.Open a non-conformity note (SAP);Issue technical inspection reports;
  • Usiminas Mecânica
    Mechanical Fitter/Welder
    Usiminas Mecânica Jan 1998 - Jun 1998
    Ipatinga E Região, Brasil
    - Assembly of the new cold strip mill plant - Usiminas
  • Aga
    Mechanical Assembly Assistant
    Aga Jul 1997 - Oct 1997
    Timóteo, Minas Gerais, Brasil
    Assembly of the new gas and oxygen plant at AGA / Acesita

Rogério Costa Education Details

Frequently Asked Questions about Rogério Costa

What company does Rogério Costa work for?

Rogério Costa works for Aperam

What is Rogério Costa's role at the current company?

Rogério Costa's current role is Fiscal de Projetos - Strategic Project - PPE - Gerência de Projetos Estrategicos.

What schools did Rogério Costa attend?

Rogério Costa attended Universidade Santa Cecília, Faculdade Única, Anhanguera Educacional, Centro Universitário Do Leste De Minas Gerais (Unilesteoficial), Cetec - Centrotécnico Lúcia Casa Santa, Veduca, Caldwell Community College And Technical Institute, Wks - Informatica, Cultura Inglesa.

Who are Rogério Costa's colleagues?

Rogério Costa's colleagues are Stephane Venant, Nick K., Bernard Lietard, Richard Beduli Moraes, Léa Mahieu, Carlos Magno Gomes Barbosa, Fabricio Breno.

Not the Rogério Costa you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.