Project Engineer
Current1. Person in Charge for 2024 and 2025 CAPEX Budgeting and Coordinator for overall Capital Project of Mining Support Division.2. Coordinator of mobilization, assembly, and commissioning process of 41 units of Hitachi EH3500AC3 haul trucks and 25 units of Komatsu HD1500-7 haul trucks.3. Created a Life Cycle Cost (LCC) analysis to determine the optimal strategy for maintaining the required number of fleet/mining equipment.4. Prepared and reviewed engineering calculation document for in-house engineering project.5. Coordinator for new equipment commissioning process within KPC Sangatta area.6. Project Leader for procurement and commissioning process of several heavy equipment, machinery, and infrastructure:•Liebherr R9150 Mining Excavator•Caterpillar 785C Haul Trucks•Caterpillar 16M Grader•Caterpillar 426 Backhoe Loader•Low-loader 100 Ton Capacity•Hiab-Volvo Crane Truck•1000 kVA Perkins Silent Type Genset•Overhead Crane (OHC) 20 Ton Capacity•Mobile Lighting Towers•Tire Maintenance Concrete Pad•Haul Truck Breakdown Maintenance Base•Maintenance Workshop CCTV