Material Controller / Smartplant Material
1. Overall responsible to maintains the data files such as Material Stock Log List (MSL), Daily Material Receiving Report (DMR), Material Receiving Inspection Report (MRR) and Material Storing Map etc. for Module and MARIAN computer operations and field material control activities.2. Update the data file of “Daily Material Receiving Report” (DMR) upon receipt of Pre Shipping Advice (PSA) and Final Shipping Advice (FSA), and keep a satisfactory material handling volume controls.3. Compare the shipping data between Packing List and Project Material Status Report (PMSR) before Update MARIAN system.4. Down load both “Procurement Status Report (PSR) for Equipment’s” from PROPS and “Project Material Status Report (PMSR) from MARIAN for Electrical and Instrument MARIAN on semi-monthly basis.5. Update the data files of Material Stock Log List and/ or MARIAN databases upon receipt of Equipment/ Materials, instructed by Material Controller.6. Prepare data file for Overage Shortage Damage (OSD) from Field Office Correspondence Unification System (FOCUS) to inform YOKOHAMA.7. Prepare Material Receiving Inspection Report (MRR) from Integrated Document Management System (i-DMS) and Inspection Release Notice (IRN) after receiving inspected Electrical / Instruments Materials.