Project Engineer
I joined the above company in the position of Project Engineer, at the Buzwagi mine site, in Tanzania. I was responsible to the Process Manager for the installation and commissioning of various process improvement projects such as:-• Commissioning of a 5MW “Spinning” power generation plant, which ensured a continuous power supply to the critical process plant equipment, such as main cyclone feed pumps, thickeners rakes, CIL and Detox tank agitators. This project was necessitated due to the… Show more I joined the above company in the position of Project Engineer, at the Buzwagi mine site, in Tanzania. I was responsible to the Process Manager for the installation and commissioning of various process improvement projects such as:-• Commissioning of a 5MW “Spinning” power generation plant, which ensured a continuous power supply to the critical process plant equipment, such as main cyclone feed pumps, thickeners rakes, CIL and Detox tank agitators. This project was necessitated due to the extremely unreliable/unstable utility grid electric supply.• Due to the success of the above 5MW installation, and due to the grid unreliability, I was responsible for the, extremely successful, installation and commissioning of a further 15MW back-up generating plant.• Upgrading of the process cyanide detoxification system. This involved the installation of two new 1000m³ detoxification tanks, upgrading the existing two 1000m³ tanks, installation of oxygen and air sparging systems, installation of a 40 tpd oxygen (VPSA) plant. The project also replaced the existing Lime and SMBS mixing plants as well as the erection of two buildings for the storage of these reagents. The final project costs is $25m.• Installation and commissioning of 2.7MVAR Power Factor correction banks.• Installation and commissioning of a 100 gpt CMC dosing plant to suppress the effects of the talk in the plant process feed material. This project cost is $1.2m• There are also minor projects at various stages of completion, they include: - 1) Upgrading of the Knelson gravity screens feed water supply, 2) Carbon storage area, 3) Storage of used hydrocarbons, 4) replacement of pipe work throughout the plant due to scale build-up over previous years Show less