Civil Engineer Foreman
CurrentSupervision of turbine base construction ie. Ensure that all rebar is fixed correctly with shuttered outer before the concrete is ordered to cube for the pouring, check that we have the correct concrete slump from each batch before and throughout the pouring of each turbine base to clients specifications, all works are done within the HSE regulations