Chief Surveyor
CurrentThames Tideway - West Section Project, London, (£416 M) - BMB JV7.2m Diameter Herrenknecht EPB TBM, with VMT Guidance System, Tunnel Length 7.0km3.32m Diameter Lovat EPB TBM with ZED Guidance System, Tunnel Length 1.2kmEstablish and Manage the Survey Control Network for the Project (7 Work Sites)Establish and maintain Tunnel Survey Control Networks for.