Lead Operator
Tilley And Jenner, Ab
Operation of the Scots Lake multi-well oil battery. Experienced with operating an Inlet Separator, FWKO and Treater in a light oil system. Water injection system consited of 2 REDA electric driven pumps, 1 Bingham 1000 hp electric driven pump, 1 gas turbine driven Bingham pump, and 1 gas turbine driven Woods pump. Total water output per day was 10,000 m3 per day. Knowledgable with a Mass Transfer Pump installed mid field to reduce pipeline pressure on the far end of the field. Operation of the Atlee and Jenner multi-well heavy oil batteries. Experienced with a large scale FWKO, Treater and Group/Test line heaters. 900 KW Gas turbine driven Co-generation skid with a Waste Heat Recovery System. Water injection system consisted of 2 1000 hp electric driven Bingham pumps, a gas turbine driven Bingham, 400 hp Reda and 2 J-275 Nationals. Knowledgable with pipeline inhibition, pigging, suspension and abandonment. Experienced with down hole well chemical treating on a large scale and vessel treating issues.