Ryan Flosdorf Email and Phone Number
Ryan Flosdorf work email
- Valid
- Valid
Ryan Flosdorf personal email
Ryan Flosdorf phone numbers
$250+ million in new and remodel construction of schools in Oregon/Washington since 2017. Detail-oriented construction professional with experience in aquatic centers, schools, airfield & roadway construction and paving. Project ManagementPermitting, Scheduling, SubmittalsPlanning and Zoning Experience with U.S. Army Corps of Engineers AirfieldsSkillsCAD, LDD Land Desktop, Arc GIS 9, Photoshop, Google Earth, Windows Operating Systems, Microsoft Office Suite, Adobe Suite, HeavyJob, Bluebeam, VistaRecent Relevant Projects20+ School projects in Portland, OR Area.Interstate 215 at Newport RoadReconstruct Interstate 215 (I-215) at Newport Road in the City of Menifee, CA. Reconstruction of the existing diamond interchange into a partial cloverleaf interchange configuration, with northbound and southbound loop on-ramps. Aprox. 20,000 cy of JPCP.Concrete Transitions on Runway 17/35 Gila Bend Auxiliary Field, Luke Air Force Base – Gila Bend, AZSawcut PCC (11” Depth) 300 LF, Install Grade 60 Dowels, 1-1/4” Dia. 4,120 EA Install PCC (11” Depth) 14,000 SY, Green Saw PCC (4 to 6”) 10,800 SY, Membrane Curing Compound 14,000 SY, Install Neoprene Compression Seal (5/8”) 14,580 LF, Install Silicone Joint Seal at BAK Poly Pad 700 LF, Install Non-JFR Joint Seal 1,580 LFFY 14 Repair South Ramp at Libby Army Airfield – Fort Huachuca, AZ Removal of all existing pavements, dowels and tie-downs to suitable subgrade. Installation of PCC pavement with a drainage layer, paved shoulders, new tie-downs/grounding and markings. Demolition included removal of approximately 181,000 square feet of AC paving and 97,150 square feet of PCC paving. New PCC pavement covered approximately 31,000 square yards. This consisted of pavement sections of 15-inches of PCC totaling 13,857 cy and a 4-inch drainage layer consisting of 3,597 cy of concrete.Phoenix-Mesa Gateway Airport Runway 30 “C” Reconstruct Portland Cement Concrete Pavement (17,000 SY), including the removal of existing PCCP, construction of Lime-treated subgrade, construction of Cement-Treated base, installation of new edge lights.
-
Project ManagerInline Commercial Construction Inc May 2021 - PresentAloha, Oregon, Us -
Project EngineerTriplett Wellman, Inc. Feb 2017 - May 2021Woodburn, Oregon, Us -
Project EngineerSouthwest Concrete & Paving Oct 2015 - Dec 2016Interstate 215 at Newport RoadReconstruct Interstate 215 (I-215) at Newport Road in the City of Menifee, CA. Reconstruction of the existing diamond interchange into a partial cloverleaf interchange configuration, with northbound and southbound loop on-ramps. Aprox. 20,000 cy of JPCP.Concrete Transitions on Runway 17/35 Gila Bend Auxiliary Field, Luke Air Force Base – Gila Bend, AZSawcut PCC (11” Depth) 300 LF, Install Grade 60 Dowels, 1-1/4” Dia. 4,120 EA Install PCC (11” Depth) 14,000 SY, Green Saw PCC (4 to 6”) 10,800 SY, Membrane Curing Compound 14,000 SY, Install Neoprene Compression Seal (5/8”) 14,580 LF, Install Silicone Joint Seal at BAK Poly Pad 700 LF, Install Non-JFR Joint Seal 1,580 LFFY 14 Repair South Ramp at Libby Army Airfield – Fort Huachuca, AZ Removal of all existing pavements, dowels and tie-downs to suitable subgrade. Installation of PCC pavement with a drainage layer, paved shoulders, new tie-downs/grounding and markings. Demolition included removal of approximately 181,000 square feet of AC paving and 97,150 square feet of PCC paving. New PCC pavement covered approximately 31,000 square yards. This consisted of pavement sections of 15-inches of PCC totaling 13,857 cy and a 4-inch drainage layer consisting of 3,597 cy of concrete. -
Project CoordinatorNesbitt Contracting Jul 2010 - Oct 2015City of Mesa (Runway 30 “C” - $3,056,973)Reconstruct Portland Cement Concrete Pavement (17,000 SY), including the removal of existing PCCP, construction of Lime-treated subgrade, construction of Cement-Treated base, installation of new edge lights and relocated edge lights, new signs and new pavement markings.Grand Ave (US 60, 19th Ave to 7lst Ave - $13,753,046) Project involved over 9.3 miles of roadway improvements including landscape beautification, decorative masonry walls, installing new turn lanes (26), concrete removal (103,000 SF), milling (348,000), paving (47,000 tons), storm drain install (1,800 LF), street light install (313 EA), and concrete installs (4,500 CY). Extensive planning and coordination were necessary with ADOT (owner), City of Phoenix, City of Glendale, and BNSF railroad.City of Chandler (Gilbert Road Improvements - $5,003,084 & McQueen Road Improvements - $4,175,891)Projects involved over 1 mile each of roadway improvements widening to a four lane divided minor arterial. Project improvements included raised median, bike lanes, turn lanes, street lighting, traffic signals, sign striping, storm drain, utility relocations, landscape and irrigation. Planning and coordination was necessary with City of Chandler (Owner), Maricopa County, BIA and the Federal Government. -
Project ManagerCei Engineering Associates, Inc. May 2003 - Jul 2010Bentonville, Arkansas, UsBuilding CAD drawings based on information provided by clients and engineersPreparing plans & coordinated engineeringPermitting submittal processingProviding technical expertise & guidance in preparation & architecture of efficient datasets, layouts, work statements, drawings, & delivery schedulesSupervising & providing new hires with CAD & drafting guidanceManage many projects from conception to completion for Wal-Mart & Sam’s Gas Programs which included traveling around the country meeting with planners, coordination permits with municipalities, designing layouts & creating full civil sets, coordinating with contractors on large scale developmentsClients include: Wal-Mart, AutoZone, Circle K, Jack in the Box, Panda Express, Tutor Time, City of Bentonville, and CVS -
Front Desk SupervisorCandlewood Suites Northwest Arkansas Sep 2001 - May 2003Oversaw daily front desk operations including reception, reservations, guest services, housekeeping / room checks & acts as Manager on Duty in absence of ManagerCollaborated with Hotel Manager on maximizing yield management strategies to achieve revenue & forecasting integrityLeadership knowledge & skills gained through efficient customer serviceWorked closely with Hotel Manager to constantly improve, execute & evaluate departmental policies, standards & procedures to maintain objective & business growth goals
-
Inventory Specialist - Sam'S Club Corporate HqWal-Mart Jan 1999 - Sep 2001Bentonville, Arkansas, UsMaintained & tracked in stock levels for clubs & DC’sReported in stock & item maintenanceDemonstrated high level of computer knowledge
Ryan Flosdorf Skills
Ryan Flosdorf Education Details
-
Arizona State UniversityMinor In Sustainability -
NwaccArchitecture
Frequently Asked Questions about Ryan Flosdorf
What company does Ryan Flosdorf work for?
Ryan Flosdorf works for Inline Commercial Construction Inc
What is Ryan Flosdorf's role at the current company?
Ryan Flosdorf's current role is Project Manager at INLINE Commercial Construction Inc.
What is Ryan Flosdorf's email address?
Ryan Flosdorf's email address is ry****@****man.com
What is Ryan Flosdorf's direct phone number?
Ryan Flosdorf's direct phone number is +150398*****
What schools did Ryan Flosdorf attend?
Ryan Flosdorf attended Arizona State University, Nwacc.
What skills is Ryan Flosdorf known for?
Ryan Flosdorf has skills like Management, Civil Engineering, Project Management, Autocad, Customer Service, Project Planning, Submittals, Strategic Planning, Construction, Cad, Microsoft Office, Microsoft Word.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial