Ryan Stiltner
AeroLeads people directory · profile

Ryan Stiltner Email & Phone Number

Site Vice President at Constellation
Location: Glen Mills, Pennsylvania, United States 13 work roles 5 schools
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Site Vice President
Location
Glen Mills, Pennsylvania, United States

Who is Ryan Stiltner? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Ryan Stiltner is listed as Site Vice President at Constellation, based in Glen Mills, Pennsylvania, United States. AeroLeads shows a matched LinkedIn profile for Ryan Stiltner.

Ryan Stiltner previously worked as Plant Manager at Constellation and Director of Operations at Constellation. Ryan Stiltner holds Master Of Engineering - Mechanical, Mechanical Engineering from University Of Delaware.

Company email context

Email format at Constellation

This section adds company-level context without repeating Ryan Stiltner's masked contact details.

Constellation

Review company-level records connected to Ryan Stiltner before choosing the right outreach path.

Profile bio

About Ryan Stiltner

Experienced Maintenance Manager with a demonstrated history of working in the utilities industry. Strong operations professional skilled in Engineering Management, Root Cause Analysis, Energy, Engineering, and Electrical/Mechanical Engineering.

Current workplace

Ryan Stiltner's current company

Company context helps verify the profile and gives searchers a useful next step.

Constellation
Constellation
Site Vice President
AeroLeads page
13 roles

Ryan Stiltner work experience

A career timeline built from the work history available for this profile.

Director Of Operations

Baltimore, Md, Us

May 2022 - Jul 2023

Site Engineering Director

Baltimore, Maryland, Us

Apr 2020 - Nov 2022

Director Of Organizational Performance And Regulatory

Baltimore, Maryland, Us

One of four site directors overseeing the daily operation of a dual unit 1380 MWe General Electric Boiling Water Nuclear Power Plant. Daily responsibilities include assessing the risk to generation of degraded equipment, ensuring configuration of the facility is maintained within the design basis of the Updated Final Safety Analysis Report, and setting the priority for emergent/planned activities. Additionally, the directors are responsible for managing the site’s $225 million budget. This includes selection of projects, maintenance activities, and staffing decisions. The engineering department is focused on improving equipment reliability to maintain continuous operation of the units. As the Engineering Director I have oversight of the following groups:Strategic Engineering - Responsible for monitoring the plant systems, coordinating system improvements, and troubleshooting abnormal system issuesDesign Engineering – Mechanical, Electrical and Civil Engineers responsible for designing modifications to plant systems to improve reliability and resolve obsolescence issuesComponent Maintenance Optimization (CMO) – Team of engineers responsible for monitoring the plant systems with predictive technology (Thermography, Vibration, Oil Analysis, etc.) and optimization of preventative maintenance strategies for the various types of plant systems (Valve, Motors, Breakers, Pumps, etc.)Key Achievements:- Completed bi-annual refueling outage in 12 days, 14 hours and 14 minutes: BWR world record duration.- Achieved the lowest dollar per MWe cost for a nuclear power plant in the United States- Achieved sixth consecutive Excellence Rating (top rating) from Institute of Nuclear Power Operators (INPO

Jul 2018 - May 2019

Assistant Maintenance Director

Baltimore, Maryland, Us

Provided oversight of the Mechanical, Electrical and Instrumentation and Control (I&C) Maintenance shops, as well as the CMO and Planning Departments. Ensured technician and supervisors executed maintenance tasks with precision to avoid errors. Managed the Maintenance budget for labor, materials, and contracts totaling $74 million online/outage.Key Achievements:- Developed improved material tracking tools that reduced O&M spending by $850k annually- Revised staffing plans for scheduled maintenance task to eliminate over $1 million from the station’s overtime budget- Developed revised testing strategies that eliminated half-trip conditions from all online I&C testing- Project Sponsor for Diving Project to re-coat the Suppression Pool. Led the development of an improved project plan that saved 48 hours of outage critical path time.- Re-organized the Maintenance department staff and responsibilities to meet 20% staffing reduction targets

Nov 2017 - Jul 2018

Senior Reactor Operator

Baltimore, Maryland, Us

Completed 18-month training program to obtain Senior Reactor Operator License from the NRC. This program included simulator dynamic evaluations, in-plant demonstrations of required emergency and non-emergency tasks, and classroom exams. Once licensed I was responsible for maintaining command and control of all activities in the Main Control Room of a dual unit BWR. Coordinated the performance of Reoccurring and Corrective Maintenance Activities on the unit while ensuring all required licensing documents were followed. Served as the Operation Outage Work Control Supervisor; primary responsibility included coordination of all outage tag outs.Key Achievements:- Achieved Highest Grade in the class of the NRC License Exam- Revised Safety Related Electrical Bus LOCA/LOOP Testing Strategy to reduce required out of service time for shutdown cooling pumps

Aug 2015 - Nov 2017

Instrumentation And Controls Maintenance Manager

Baltimore, Maryland, Us

Managed the department’s schedule, budget ($1.5 million), and personnel (74 full-time and 80 seasonal employees). Responsible for safe and reliable execution of I&C tasks in the plant through oversight in the field and management of the department’s training programs. Key Achievements:- Implemented the I&C portions of the Extended Power Uprate (EPU) Project. EPU was $850 million project to increase the capacity of both units by 200 MWe. During the EPU project, I&C’s workload increased from 2,500 to 11,000 activities per outage, requiring more than 120 additional technicians. - Approved the revision to approximately 1,000 I&C procedure revisions required for EPU- Implemented an improved analytical security camera system upgrade

Feb 2013 - Aug 2015

Component Maintenance Optimization Manager

Baltimore, Maryland, Us

Managed a diverse group of 14 individuals who collected various types of preventative maintenance data to optimize the maintenance performed in the plant's systems. Provided oversight of the station’s Preventative Maintenance Program. Performed Root Cause investigations of Equipment and Human Performance Issues.Key Achievements:- Reduced Maintenance rework activities by 60% through analysis of post-maintenance performance data

Aug 2012 - Feb 2013

Instrumentation And Control Supervisor

Baltimore, Maryland, Us

Coordinated preventative and corrective maintenance on numerous plant systems. Provided coaching and oversight of a team of 12 technicians. Facilitated troubleshooting of various plant issues to ensure reliable operation and correct abnormal condition.Key Achievements:- I&C department outage coordinator - managed scheduled for entire I&C department in preparation for the annual refueling outage.

Oct 2010 - Aug 2012

Design Engineer

Baltimore, Maryland, Us

Analyzed and solved complex problems daily using drawings, procedures, and vendor documents. Primary focus was Instrument and Controls Design. Key Achievements:- Managed the Station Temporary Modification Process- With the Main Generator online successfully led the project to temporary re-route a majority of the generator protection logic wiring due to a degraded duct-bank.- Selected for the inaugural Exelon Emerging Leaders Program

May 2007 - Dec 2010

Design Engineer

Newark, New Jersey, Us

Analyzed and solved complex problems daily using drawings, procedures, and vendor documents. Primary focus was Instrument and Controls Design. Coordinated Main Condenser and Primary Containment inspections during scheduled refuel outages.

Jul 2006 - May 2007

System Engineer (Intern)

Washington Navy Yard, Dc, Us

May 2005 - Aug 2005
5 education records

Ryan Stiltner education

Master Of Engineering - Mechanical, Mechanical Engineering

University Of Delaware

Mba, Business Management

University Of Delaware

M.S., Mechancial Engineering

University Of Delaware

Bachelor Of Science - Bs, Mechanical Engineering

Villanova University

B.S., Mechanical Engineering

Villanova University
FAQ

Frequently asked questions about Ryan Stiltner

Quick answers generated from the profile data available on this page.

What company does Ryan Stiltner work for?

Ryan Stiltner works for Constellation.

What is Ryan Stiltner's role at Constellation?

Ryan Stiltner is listed as Site Vice President at Constellation.

Where is Ryan Stiltner based?

Ryan Stiltner is based in Glen Mills, Pennsylvania, United States while working with Constellation.

What companies has Ryan Stiltner worked for?

Ryan Stiltner has worked for Constellation, Exelon Nuclear, Pseg, and Navsea.

How can I contact Ryan Stiltner?

You can use AeroLeads to view verified contact signals for Ryan Stiltner at Constellation, including work email, phone, and LinkedIn data when available.

What schools did Ryan Stiltner attend?

Ryan Stiltner holds Master Of Engineering - Mechanical, Mechanical Engineering from University Of Delaware.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.