Ryan Cone
AeroLeads people directory · profile

Ryan Cone Email & Phone Number

Sr. Petroleum Engineer actively seeking next role
Location: Houston, Texas, United States 7 work roles 1 school
1 work email found @bp.com LinkedIn matched
✓ Verified Jul 2026 4 data sources Profile completeness 71%

Contact Signals · 1 work email

Work email r****@bp.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Sr. Petroleum Engineer actively seeking next role
Location
Houston, Texas, United States

Who is Ryan Cone? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Ryan Cone is listed as Sr. Petroleum Engineer actively seeking next role based in Houston, Texas, United States. AeroLeads shows a work email signal at bp.com and a matched LinkedIn profile for Ryan Cone.

Ryan Cone previously worked as Sr. Petroleum Engineer at Bp and Petroleum Engineer at Bp. Ryan Cone holds Bachelor Of Science - Bs, Petroleum Engineering from The University Of Tulsa.

Company email context

Email format at bp.com

This section adds company-level context without repeating Ryan Cone's masked contact details.

{first}.{last}@bp.com
86% confidence

AeroLeads found 1 current-domain work email signal for Ryan Cone. Compare company email patterns before reaching out.

Profile bio

About Ryan Cone

I am an experienced Petroleum Engineer with diverse subsurface background and excellent technical, analytical, and communication skills as demonstrated throughout my 17 years in the oil industry. I have a proven track record of managing, optimizing, and improving well stock by applying pragmatic and innovative solutions to complex issues. I have expertise in well/reservoir/system modeling, well test interpretation and integration, and classical reservoir and petroleum engineering techniques. I am passionate about delivering results and achieving goals through collaboration both within the team and across disciplines and enjoy contributing to the development and success of junior engineers.

7 roles

Ryan Cone work experience

A career timeline built from the work history available for this profile.

Sr. Petroleum Engineer

Bp

Houston, Texas Area

• Responsible for Base Management delivery for the Nakika field (host platform with multiple subsea well tiebacks: ~6,000’ water depth, 15 operated/4 non-operated subsea wells, smart completions, looped subsea system, gross production of ~100 mbod/~150 mmscfd/~25 mbwd)- Developed start-up, monitoring, and surveillance plans for new wells K-4 and K-3 wells (+25 mbd gross capacity) and provided assurance of integration of key data into reservoir model and future development plans- Led team to investigate potential root causes for skin development over life of I-1 well, develop mud acid stimulation and flowback campaigns, and revise well management philosophy to prevent future skin (+8 mbd)- Oversight of fieldwide well and system modeling for well performance monitoring and allocation- Coordination of multi-disciplinary well-by-well and production technical limits reviews to identify key areas of production/efficiency improvement- Interpretation and validation of quarterly and semi-annual valve integrity tests per BSEE- Development of Well Design and Operating Limits documentation for Nakika wells• Single point contact for co-owner subsurface/wells issues and integration of Base/Ops/Subsea short-term activity plans/priorities• Houston coordinator for BP global community of practice meetings for well management, integrity, and interventions• Technical coach/mentor to junior engineers/interns

Apr 2014 - Jun 2018

Petroleum Engineer

Bp

Sunbury, Uk

Shah Deniz Stage 2• Responsible for delivery of two key exploration drill stem tests: developing well test plans, providing onsite support and analysis during testing operations, and completing final interpretation • Played key role in integration of well test data into full-field simulation model and ramp-up forecast• Developed new log-derived permeability upscaling technique to improve KH prediction for new wells and modified this same technique for implementation into new full-field static model description• Developed new technique for predicting rate-dependent skin in Shah Deniz wells based on empirical observations and integrated this work with upscaling model to improve new well rate prediction model• Utilized PTA skillset to analyze and diagnose issues with Geotap formation pressure tests and worked with wellsite geologists to develop improved testing procedures/techniques• Responsible for managing risk of poor well productivity, including mitigation and contingency planning• Provided key engineering input and oversight to scale formation potential study• Provided petroleum engineering support to Baku-based base management team and responsible for transferring learnings between Stage 1 and Stage 2 teams• Lead HSSE representative for AGT Sunbury teams

Apr 2011 - Mar 2014

Lead Petroleum Engineer/Interim Team Leader

Bp

Baku, Azerbaijan

• Responsible for Base Management delivery for the Chirag field (15 producers, 6 water injectors, 130+ mbd oil, 170+ mbd injection in multiple, commingled horizons)- Maintained technical production/injection forecasts and reports to management- Coordinated start-up and ramp-up of 6 new production wells and 1 injection well- Oversaw management of well modeling and predictions for all production and injection wells- Coordinated monthly well testing and validation, including oversight of production allocation- Coordinated and led multi-disciplinary well reviews on a semi-annual basis- Responsible for optimization of production/injection within well/platform constraints- Key contact for offshore operations and well interventions teams for all well-related issues• Developed new bean-up guidelines for troubled/sand-prone Chirag wells• Revised and simplified new well start-up procedure for Chirag platform• Completed holistic analysis of current wellstock (sand-control completion integrity, bean-up/drawdown history, water production and/or breakthrough timing, etc.) to determine likelihood of future sand breakthrough/failure events to aid in future operability and optimization decisions • Served as a technical mentor/coach to several junior engineers and interns• Provided key PE support to Central Azeri team following subsea gas release event in 2008. Coordinated integrity reviews of CA wells which directly led to reinstatement of 300 MMscfd of injection capacity and 30+ mbd of production capacity. Developed new well management guidelines for gas injectors in the field.• Single point contact for management, utilization, and improvement of the Azerbaijan Digital Well File project• Acted as Interim Chirag Base Management Team Leader for extended periods in both 2009 (4 months) and 2010 (7 months) until permanent successors were identified

Jul 2007 - Apr 2011

Reservoir/Production Engineer

Bp

Houston, Texas Area

• Responsible for delivering Base Management agenda for Jonah Field (Wyoming)- Budgeted, prioritized, and managed all wellwork activity for the field- Coordinated and led multi-disciplinary annual well reviews and maintained production hopper- Set, analyzed, and adjusted base production forecasts for 100+ operated and 80+ outside-operated wells to feed Choke Model, BP Group Financial Outlook, and long-term planning processes- Worked with Wells, Production Operations, and Midstream Gas Management teams weekly as production engineering liaison on a variety of activities (planning/prioritizing well interventions, providing engineering support for new well deliveries, and managing in-month production estimates)- Developed a weekly distribution report to communicate actual production, variances to targets, and key metrics to management and resource teams• Coordinated roll-up of production wedge forecasts for short and long-term planning purposes• Provided subsurface engineering support and oversight for five reservoir modeling pilot infill drilling studies, a pilot integrated asset model build to assess system performance, and an upgrade of water disposal facilities• Assessed and implemented several new deliquification techniques in the field – namely, 2-piece plungers and capillary strings for the application of liquid surfactant• Served as a technical mentor/coach to two junior engineers and one summer intern

Mar 2004 - Jul 2007

Operations Production Engineer

Bp

Prudhoe Bay, Ak

• Participated in onsite planning, oversight, and review of well intervention operations on the North Slope (including coiled tubing, slickline, e-line, stimulations/fullbore pumping, and well integrity)• Researched and generated well intervention procedures with guidance from Well Design Engineer while working in Anchorage office• Used programming skills to develop a web-based program to calculate burst ratings for atypical casing sizes found on the North Slope• Developed Excel-based gradient calculation tool to be used by field operators and well integrity engineers to estimate depth of tubing leaks in high-rate gas injection wells based on annulus pressure bleed/buildup data, Echometer liquid level in annulus, and injection rate data

Oct 2003 - Mar 2004

Reservoir Engineer

Bp

Houston, Texas Area

• Utilized VIP and historical analog results to make recommendations for new well, sidetrack, and workover opportunities in the East Painter field. Work led to a successful drill of a new horizontal well to capture reserves in an unswept portion of a thin oil rim on south flank of field.• Worked with PE to analyze and make elections on drilling and workover proposals from partners• Acted as single point contact for partners in all matters related to reservoir management and development for Painter and East Painter fields • Coupled VIP simulation and CVP process to begin development of updated depletion plan and blowdown recommendation timing for the East Painter field

Sep 2002 - Oct 2003

Reservoir Engineer

Bp

Houston, Texas Area

• Identification, prioritization, and implementation of wellwork opportunities in Wilburton (OK) field with assistance from drilling engineer and field PEs• Analyzed Arbuckle reservoir and historical well performance to update depletion plan and researched wellbore utility for potential uphole recompletion opportunities. SPA for recompletion of one of the wells in the field to test viability off horst block.• Assessed production impact of lateral compression on eastern leg of F&H pipeline• Worked with geologist on mapping and evaluation of further development of shallow Fanshawe play• Familiarization to various types of gas well deliquification methods (soap sticks, surfactants, plunger lift, etc.) through numerous trips to the field

Feb 2001 - Sep 2002
1 education record

Ryan Cone education

FAQ

Frequently asked questions about Ryan Cone

Quick answers generated from the profile data available on this page.

What is Ryan Cone's role at their current company?

Ryan Cone is listed as Sr. Petroleum Engineer actively seeking next role.

What is Ryan Cone's email address?

AeroLeads has found 1 work email signal at @bp.com for Ryan Cone.

Where is Ryan Cone based?

Ryan Cone is based in Houston, Texas, United States.

What companies has Ryan Cone worked for?

Ryan Cone has worked for Bp.

How can I contact Ryan Cone?

You can use AeroLeads to view verified contact signals for Ryan Cone, including work email, phone, and LinkedIn data when available.

What schools did Ryan Cone attend?

Ryan Cone holds Bachelor Of Science - Bs, Petroleum Engineering from The University Of Tulsa.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Ryan Cone you were looking for.

View similar profiles