Odoptu Stage 2 (Os2) Project Facilities Lead
Houston, Texas, United States
Led team of 18 Company Engineers across all disciplines through FEED, Detail Design, and Construction support of first module sealift (~10k Tonnes) on $4G+ project. Increased oil from 34 to 80kbd, gas from 84MSCFD to 220MSCFD, and water treatment and injection from 5kbd to 100kbd.• Jointly invented the vendor data initiative, receiving vendor data up to 17wks ahead of company norms, and drove over 100 modifications to the EPC level 3 FEED and Detailed Design schedules. This led to delivery of a record-breaking design schedule for the ExxonMobil Development Company and set up fabrication/construction for success.• Adapted project Engineering organization to a large scope change; starting up production modules 1 year ahead of utilities modules. Initiated task force to redesign facility during FEED due to sealift execution constraints. Result was project coming in more than ~$1G under budget and ahead of high visibility external commitments. • Drafted EPC Engineering contract, including Korea, Russia, and India work splits which allowed for smooth delivery to fabricator. Drove amendment to EPC productivity metrics and made numerous adjustments in staffing & execution methodology to deliver Engineering ahead of schedule.• Guided the facilities team through several cost optimization efforts in early design, including reducing generators, removing 1 module, 800Tonnes weight reduction program, and eliminating dual fuel from the generators through plant black start analysis. All while maintaining customer satisfaction of design with Operating Company.