Inspector/Consultant To Edison Mission Energy
Western Springs, Illinois, Us
Walnut Creek Energy Park Project$600M Simple Cycle Power Plant5 x 100MW GE LMS100 TurbinesInspection of Kiewit activities include but are not limited to site earthwork (unsuitable soil, structural fill/backfill, CAB/CMB fill/compaction), structural foundations, mass concrete pours, auger pressure grouted displacement piles, cast-in-drilled hole piles, blast walls, sound walls, site erected tanks, AC paving, utility/ductbank (electrical, gas, potable water, storm drain, demineralized water, recycled water, fire services, etc.) pre-cast and cast-in-place concrete, hydrostatic (≤ 250 psi) and pneumatic (1220 psi) pressure testing of power piping and process piping, flow test all plant drains for processed water waste, 2”-42” diameter HDPE, installation of fiberglass cooling tower, all pump forwarding skids, Inspection of the buildings onsite included foundation, steel framing, cmu walls, overhead gantry cranes, mechanical, electrical and plumbing, Fire Life Safety systems, all tanks and skids in the Water Treatment Building, and compressors in the Gas Compressor Building and all commissioning activities of the units (not related to electrical). Oversight of GE includes but not limited to IDF's/RFI's, placement of the main LMS100 package, super core install into the main package and connection of hoses and piping, generator, AUX skid, intercooler, filterhouse, cooling water skid, emissions control module, ammonia skid and all insularly skids, pumps, piping and tanks associated with running the units.I also represented the client at weekly and monthly construction/planning meetings in the field with multiple agencies (The Gas Company, LACSD, Rowland Water, General Electric, etc).