Engineering And Projects Manager
Current· Prepare and collect project data, analyze and track budgets, evaluate project costs, and monitor performance trends.· Coordinated engineering team for projects in commercial and industrial development.· Successfully developed a conceptual design in compliance with cGMP and ISPE standards for the addition of a new cartridge filling line, obtained initial approval from the EDA for the layout.· Secured approval for an electrical capacity upgrade from 250 kW to 800 kW from the South Cairo Electricity Company. · Currently, in progress with the replacement of transformers, as well as medium and low voltage switchboards.· Upgraded utility infrastructure to accommodate the requirements of the new cartridge filling line.· Executed an upgrade of the sewage network at the water treatment station to enhance operational efficiency.· Completed the replacement of vinyl floors in the microbiology lab with epoxy floors, aligning with the stringent requirements set by the EDA.