Lifting Supervisor
Current-Carrying out a site survey to check that there have been no significant changes or additional hazards introduced from those identified in the lift plan.-Checking the access and egress routes of the crane from the lifting area.-Checking the load(s) to be lifted match the descriptions on the lift plan.-Checking that the crane and any lifting attachments provided match those selected in the lift plan, including the lifting capacities and physical dimensions of the crane.-Checking that the lifting accessories selected in the lift plan are present.-Checking reports of thorough examination for the crane, lifting attachments and accessories.-Checking that pre-use checks have been undertaken by the crane operator and the riggers.-Checking that an exclusion zone (barricades) has been established around the lifting area.-Briefing the lifting team (rigger, banksman and operator) on the details of the lift plan.-Supervising the siting and setting up of the crane in preparation for the lifting operation.-Checking that the crane has been set up in accordance with the lift plan.-Supervising the lifting operation.