Senior Construction Manager
CurrentSupervising and construction of 35MLD (STP) sewage treatment plant and two nos of Package STP sizes 150KLD & 500KLD. Construction of Lifting Stations 4nos at different locations with allied all works. Laying of sewage pumping rising mains of D.I pipes sizes from 150mm to 800mm of total length 15.75kms. Supervising of Gravity sewer pipeline laying with material RCC & HDPE pipes of sizes from 200mm to 1400mm of total length 10.28kms.