Registered Civil Engineer with over 33 years of experience in construction project management, cost and schedule control, contracts administration, and quality control for major public works projects including wastewater treatment plants infrastructure modernization, tunnels, underground stations excavations/support systems, geotechnical instrumentations installation and monitoring, transit and freight rail projects, roadways, grade separations, street improvements, highways, bridges, marine terminal facilities, school facilities, abatement and public buildings and parking structures, site utilities, sewer lift stations, pipe jacking, and general heavy civil work projects. Sam was part of the METRO Red Line Project Segments 1, 2, and 3 and the Alameda Corridor Project. Professional responsibilities have ranged from feasibility study, geotechnical and civil design, technical specifications development and preparation of bid documents, constructability review, schedule preparation, field implementation and supervision, and construction management. He has had direct contribution to the successful completion of numerous projects and hands-on experience in construction of major facilities and infrastructures, identifying and managing risks, and controlling project cost and schedule.
Integrated Engineering Managment (Iem)
-
Sr. Project And Construction ManagerIntegrated Engineering Managment (Iem)Los Angeles, California, United States
-
Sr. Project/Construction ManagerIntegrated Engineering Managment (Iem) Mar 2004 - PresentSr. Project/Construction Manager on various projects including City of Los Angeles (BOE/BOS/EED) Wastewater Treatment Plant facilities upgrades and improvements at Hyperion, DC Tillman, and Glendale plants; Port of Long Beach Middle Harbor Redevelopment Phase 1, Pier S Redevelopment Design, and Fire Station No. 24; and Los Angles Unified School District modernization and construction of new Elementary and High School projects.
-
Construction/Project ManagerSimplus Management Aug 2003 - Mar 2004Construction Manager and Public Works Representative for construction of the new Long Beach Police Station and Catalina Landing Parking Structure Projects.
-
Project Engineer - Assistant Area ManagerAecom Sep 1997 - Aug 2003Dallas, Texas, UsWorked as Project Engineer and Assistant Area Manager on various international and domestic commuter and freight rail, and grade separation projects including:2/98 - 8/03: Project Engineer to Assistant Area manager for the Alameda Corridor Project $2.4B, 20-mile cargo expressway linking the ports of Los Angles and Long Beach to the transcontinental rail yards near downtown Los Angeles9/97 - 2/98: Project Engineer on Manila Calabarzon Express Commuter Rail Project, prepared preliminary geotechnical and civil design plans for a Design-build contract consisting of 70-Kilometers expansion and modernization of the Philippines National Railways. -
Geotechnical Engineer, Office Engineer, And Assistant Resident EngineerDe Leuw Cather/ Parsons Transportation Group Mar 1987 - Sep 19971987 - 1996: Geotechnical Engineer, Materials Engineer, and Assistant Resident Engineer on LA Metro Red Line, Segments 1, 2, and 3 on several underground cut-cover stations and tunnels construction.2/96 - 9/97: Sr. Materials Engineer on Vietnam National highway No. 1 Rehabilitation Project, HCM City, Vietnam.1/93 - 12/93: Sr. Materials Engineer for reconstruction of five (5) major trunk roads and two rural roads totaling 170 Kilometers, Dar Es Salaam, Tanzania.1/90 - 12/91: Geotechnical Engineer for subsurface investigation , laboratory testing of soils and rocks, bridges foundation design, embankment design, and slopes design of soil/rock up to 70 meters high for construction of 6-lane, 200 Kilometres, $717M Motorway in Western Turkey, Izmir, Turkey
-
Field EngineerSoil Testing Inc. Aug 1986 - Mar 1987Staff Engineer, conducted subsurface investigation, laboratory testing, engineering analysis, and preparation of geotechnical reports for commercial facilities, Oxford, Connecticut
-
Graduate Research AssistantSouthern Illinois University, Carbondale Aug 1983 - Jul 1986Carbondale, Il, UsDeveloped a three-dimensional numeral model using Finite Element Analysis to predict time-dependent characteristic of coal mine pillars as part of Graduate School Thesis in Mining Engineering/Rock Mechanics.
Sam Navid, P.E., Env. Sp, Qsp Skills
Sam Navid, P.E., Env. Sp, Qsp Education Details
-
University Of Wisconsin-MilwaukeeDewatering -
Southern Illinois University, CarbondaleMining Engineeering / Rock Mechanics -
Southern Illinois University, CarbondaleCivil Engineering
Frequently Asked Questions about Sam Navid, P.E., Env. Sp, Qsp
What company does Sam Navid, P.E., Env. Sp, Qsp work for?
Sam Navid, P.E., Env. Sp, Qsp works for Integrated Engineering Managment (Iem)
What is Sam Navid, P.E., Env. Sp, Qsp's role at the current company?
Sam Navid, P.E., Env. Sp, Qsp's current role is Sr. Project and Construction Manager.
What schools did Sam Navid, P.E., Env. Sp, Qsp attend?
Sam Navid, P.E., Env. Sp, Qsp attended University Of Wisconsin-Milwaukee, Southern Illinois University, Carbondale, Southern Illinois University, Carbondale.
What skills is Sam Navid, P.E., Env. Sp, Qsp known for?
Sam Navid, P.E., Env. Sp, Qsp has skills like Program Management, Project Management, Project Planning, Construction Management, Contract Management, Civil Engineering, Construction, Project Estimation, Microsoft Project, Engineering, Contract Negotiation, Primavera P6.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial