Sr. Piping Designer
CurrentSr. Piping Designer, Aker Powergas Pvt. Ltd. Project: Hugin A (NOA PdQ Platform, Norway) Client: Aker BPUpdated and model new lines for System 23 (Gas Compression and Re-Injection), System 24 (Gas Treatment), system 26 (Gas Lift), System 27 (Gas Export and Metering) as per PFD and P&ID. Modeling few equipment as per preliminary data and creating and locating the Datum point, COG. Responsibilities includes development of piping study, nozzle Orientation, piping mark-up on process P & ID. Review of Plate type exchanger & Coolers vendor drawings and communicate with other discipline for Comments & mark-up on the same and plan work to meet PEM milestones with follow all the Norsok standards.Sr. Piping Designer, Aker Powergas Pvt. Ltd.Project: Wisting FPSO FEED Client: Equinor, NorwayModeling few equipment as per preliminary data, modeling utility station, fire hydrant and locating them as per the plot plan mark up. Creating and locating the Datum point, COG & Wet. COG. of all topside-M002 module equipment as per vendor drawing. Updated all the primary and secondary access way of some of topside utility area. Routing(study) utility lines header (Comp. Air/nitrogen/fresh water/process cooling medium/sec. heating medium) in all utility area at different level.Sr. Piping Designer, Aker Powergas Pvt. Ltd.Project: AL SHAHEEN Offshore topsides facilities, Gallaf (Green field & Brown field) Client: AEM/NOC/DSMEWorking as Sr. Piping Designer for well headlines. Supervising team of designers. Tag resolution and preparation of reports for 30%/60%/90% client model review. Coordination with other disciplines for tag resolutions. Modelling new lines with the help of existing scanned model. Preparation of Tie-ins register. Preparation of demolition isometrics. Preparation and issuance of fabrication isometrics with 3D clash reports.